Integrated Customer Information System Paul Anthony Lister Pierre Boisgontier

Eurotunnel ISIS/ICIS 1994 - 2015 Reflection - Final

Embed Size (px)

Citation preview

Page 1: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Integrated Customer Information System

Paul Anthony ListerPierre Boisgontier

Page 2: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

• Project Overview QuickShuttle Pilot Staff Information Customer Information

• Methodology• Pre-Agile. DSDM• Pre-ITIL Change Control & Iterative

Release Management

• Success Factors• Building Relationships• Creativity• Collaboration & Professionalism

• Problems• Scale & Performance• Quality

Page 3: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Railway & Terminal Control Centres

• Technical Environment• Fire Detection• Ventilation & Drainage• Rail Traffic Management

• Point Solutions • Timetable Management• Rolling Stock• Crew Management• Toll System & Bookings/Reservations

• Staff/Logistical Information• Deviation from Plan• Crew Changes, Meals, Buses, Cleaning

• Flow of Information• Staff

• Concession Radio• Telephone

• Customers• Manually Driven Signage• Static TV Screens

Page 4: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Quick Shuttle Pilot

Page 5: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Process Modelling

Assign ShuttleCancel

Reinstate

Depart

EmptySTOP

Arrive

Change Platform

Loading Sequence

Delay

Reduce Speed

Change Platform

Operational Information

Page 6: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Redevopment

• Adopt Modern Design Tools• Adopt Object Oriented Methods• Adopt modern User interfaces, • Ease maintenance• Implement Oracle RDBMS• Implement Reporting• Implement Web Site

Page 7: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Object Oriented Design & Use Case Modelling

Page 8: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Fully Integrated & Event Driven

Page 9: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Change Management & Release Planning

Page 10: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Customer Facing Signage

Page 11: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final

Success Factors

Page 12: Eurotunnel   ISIS/ICIS 1994 - 2015 Reflection - Final