INTRODUCTION

In December 2008, while I was working in London at Network Rail ltd on roll-out project to provide GSM coverage (called GSM-R) to the entire British railways network, my company was asked by the UK Emergency Services Organizations, such as Fire Brigade, Police and Ambulance Departments, to design and install an ad-hoc system able to provide wireless communications throughout one of the longest railway tunnels in the country, the so-called Severn Tunnel

This tunnel is a strategic part of the rail trunk since it carries an intensive passenger train service, and a significant freight traffic (ref. Wikipedia)

Page 3: Essay n.3

SEVERN TUNNEL - GENERALS

It’s a 7008 meters long tunnel, connecting South Gloucestershire in the West of England to Monmouthshire in South Wales under the estuary of the River Severn. For well over 100 years it was the longest mainline railway tunnel in the UK, until Channel Tunnel Rail was completed in 2007

Welsh Portal

English Portal

Page 4: Essay n.3

PROJECT AIMS

• Brand new system had

to be designed

GSM-R

system

• Existing system had

to be renewed

Fire Rescue Services

• Brand new system had

to be designed

Police Dep Radios

Wireless communications for emergency and commercial (such asGSM-R) services had to be provided.

The existing obsolete radio coverage system designed for Fire Brigade’s radios and installed in the ‘80s wasn’t suitable to fit twonew additional technologies

Page 5: Essay n.3

POSSIBLE DESIGN SCENARIOS

1. Obsolete existing Fire Brigade radio system

equipment could have been simply replaced with

a new and more efficient one, whilst two new

separate GSM-R and Police Department radio

systems could have been deployed

2. Existing radio coverage equipment could have

been completely removed and a brand new

system catering for all the three technologies

could have been installed from scratch

Page 6: Essay n.3

IMPLEMENTATION DISCUSSION

My tasks within the project was to coordinate the designing team from a technical standpoint and to deal with all the parts involved in order to find a performing and reliable solution, which should have ideally been cost- and installation-efficient

From the very beginning, both our main partners (Fire Brigade and Police Department) pushed for installing three separated antenna systems inside the tunnel, since they thought this would have been the simplest solution to implement and maintain, hence the most reliable one

On the contrary, my opinion was that a single, combined system should have been adopted. I had already worked on similar projects when in Italy, and knew from my previous experience that I always got the best results with such an solution

Page 7: Essay n.3

PROPOSED SOLUTION: THE “RADIATING CABLE”

Instead of installing three separate antennas – each working at a specific frequency and bearing only one of the three technologies to be implemented - a single shared radiating cable could be clipped to the tunnel ceiling, for its entire length

A radiating cable is a coaxial slotted cable which can radiate the wireless radio signal towards a specific direction, like a leaking water pipe. It is also able to combine different signals operating at different frequencies

Tunnel

English portal

Page 8: Essay n.3

PROS AND CONS OF OUR PROPOSED SOLUTION

•Better performance since the cable provides a uniform radio coverage all along the tunnel

•More reliable and easier to maintain since only one piece of equipment is installed inside the tunnel

•More complicated and time consuming

installation since long drums of heavy

cable have to be brought inside the

tunnel

• More expensive solution due to cost of

a 7 Kms cable compared to a separate

antennas system

Page 9: Essay n.3

PROJECT DEVELOPMENT: THE FINAL DECISION

The initial skepticism of our partners regarding my proposed design was overcome via a series of meetings in which I showed them the advantages of the radiating cable solution in terms of reliability and efficiency, and clarified their doubts about it.

We eventually agreed to implement our proposed design after 4 months of discussions and compromises

Equipment installation and commissioning went fairly smooth even if, as expected, it lasted almost an year

Once the system was completed, it was perfectly working and meeting all initial customer’s requirements, making the whole project a big success from all points of view

Page 10: Essay n.3

HOW AN IE MASTER’S DEGREE PROGRAM WOULD HAVE

HELPED ME IN A PROJECT SITUATION LIKE THIS?

When preparing the comparative document showing the differences between the two possible design scenarios, I realized that I lacked some project management skills such as estimating time and cost for the required activities, developing the budget and planning the risks of each scenario

Having a purely technical background and working experience I found several difficulties in preparing and evaluating the project from an economic point of view and I needed to ask some colleagues of mine for help

I’m expecting an IE Master’s Degree to allow me to add, together with other financial and marketing skills, the management and work-organization competences that will complete my profile and make me a proper Project Manager, able not only to deal with technical issues but also with other aspects such as budget development or activity monitoring & controlling