www.equinix.co.uk EQUINIX LD6 LONDON SLOUGH FACT SHEET About Equinix Equinix, Inc. (Nasdaq: EQIX), connects more than 4,500 companies directly to their customers and partners inside the world’s most networked data centers. Today, enterprise, cloud, networking, digital media and financial services companies leverage the Equinix interconnection platform in 32 strategic markets across the Americas, EMEA and Asia-Pacific. By connecting directly to their strategic partners and end users, customers are forming dynamic ecosystems inside Equinix. These interconnected ecosystems enable companies to optimize the performance of their content and applications and protect their vital digital assets. Learn more at www.equinix.co.uk Equinix UK PO Box 4215 Slough SL1 0QU United Kingdom Sales [email protected] 0845 217 3292 Marketing [email protected] 0845 373 2914 Background Equinix is driving new innovation in its data centres worldwide, pushing the boundaries of data centre design, leveraging intelligent new approaches and harnessing natural resources responsibly in creative ways. Our new UK data centre LD6 is being built at our London Slough campus, following the successful precedents of both LD4 and LD5. Developing a new facility ‘from scratch’, unconstrained by existing architecture means we can fully consider all aspects of the design, and how to modify and improve the technology accordingly. Business drivers for LD6 Creating a new flagship data centre for Platform Equinix Expanding the UK’s largest, fastest-growing and most network-dense data centre environment at our London Slough campus alongside LD4 and LD5 Responding to continuing demand from customers across a range of sectors including financial services, digital content, mobile, cloud and enterprise • Supporting customer continuity and future expansion Opportunities and Key Facts about Equinix LD6 Phase 1 target launch: Q1 2015 Initial capacity: 1,385 cabinets Distance from airports: • 11.3 mi (18.6 km) from London Heathrow Airport (LHR) • 33.4 mi (54.2 km) from London City Airport (LCY) Colocation space when LD6 complete: 8,000 square metres (86,000 square feet; 2,770 cabinet equivalents) London Slough campus total colocation space on LD6 completion: 36,000 square metres (388,000 square feet) Interconnections: 1000+ diverse dark fibre links Power: 1.5 kVA/m² UPS capacity Cooling and Energy Efficiency: • LD6 aims to become accredited to gold energy efficiency by Leaders in Energy & Environmental Design (LEED). • Equinix plans to achieve this with the aid of an innovative cooling system, which will utilise mass air-cooling technology with indirect heat exchange. This will contribute to LD6 having lower energy consumption and a smaller carbon footprint than other facilities of its kind. • Over 85% free cooling to data halls from the use of indirect evaporative cooling AHUs with an annual average PUE of 1.2. • Rainwater harvesting will reduce mains water consumption of AHUs. A bore hole to underground water source will reduce the impact and dependence upon local distribution networks. • Natural ventilation will be used within the LD6 office building. • High efficiency heating/cooling plant for FOH and Logistics buildings, including heat pumps for LTHW.

Equinix LD6 Fact Sheet

Embed Size (px)

Citation preview

Page 1: Equinix LD6 Fact Sheet

www.equinix.co.uk

EQUINIX LD6 LONDON SLOUGH FACT SHEET

About EquinixEquinix, Inc. (Nasdaq: EQIX), connects more than 4,500 companies directly to their customers and partners inside the world’s most networked data centers. Today, enterprise, cloud, networking, digital media and financial services companies leverage the Equinix interconnection platform in 32 strategic markets across the Americas, EMEA and Asia-Pacific. By connecting directly to their strategic partners and end users, customers are forming dynamic ecosystems inside Equinix. These interconnected ecosystems enable companies to optimize the performance of their content and applications and protect their vital digital assets.

Learn more at www.equinix.co.uk

Equinix UK PO Box 4215 Slough SL1 0QU United Kingdom

Sales [email protected] 0845 217 3292

Marketing [email protected] 0845 373 2914

Background Equinix is driving new innovation in its data centres worldwide, pushing the boundaries of data centre design, leveraging intelligent new approaches and harnessing natural resources responsibly in creative ways.

Our new UK data centre LD6 is being built at our London Slough campus, following the successful precedents of both LD4 and LD5. Developing a new facility ‘from scratch’, unconstrained by existing architecture means we can fully consider all aspects of the design, and how to modify and improve the technology accordingly.

Business drivers for LD6• Creating a new flagship data centre for Platform Equinix™

• Expanding the UK’s largest, fastest-growing and most network-dense data centre environment at our London Slough campus alongside LD4 and LD5

• Responding to continuing demand from customers across a range of sectors including financial services, digital content, mobile, cloud and enterprise

• Supporting customer continuity and future expansion

Opportunities and Key Facts about Equinix LD6 Phase 1 target launch: Q1 2015

Initial capacity: 1,385 cabinets

Distance from airports: • 11.3 mi (18.6 km) from London Heathrow Airport (LHR)• 33.4 mi (54.2 km) from London City Airport (LCY)

Colocation space when LD6 complete: 8,000 square metres (86,000 square feet; 2,770 cabinet equivalents)

London Slough campus total colocation space on LD6 completion: 36,000 square metres (388,000 square feet)

Interconnections: 1000+ diverse dark fibre links

Power: 1.5 kVA/m² UPS capacity

Cooling and Energy Efficiency:• LD6 aims to become accredited to gold energy efficiency by Leaders in Energy &

Environmental Design (LEED).

• Equinix plans to achieve this with the aid of an innovative cooling system, which will utilise mass air-cooling technology with indirect heat exchange. This will contribute to LD6 having lower energy consumption and a smaller carbon footprint than other facilities of its kind.

• Over 85% free cooling to data halls from the use of indirect evaporative cooling AHUs with an annual average PUE of 1.2.

• Rainwater harvesting will reduce mains water consumption of AHUs. A bore hole to underground water source will reduce the impact and dependence upon local distribution networks.

• Natural ventilation will be used within the LD6 office building.

• High efficiency heating/cooling plant for FOH and Logistics buildings, including heat pumps for LTHW.