23
Enterprise PDM to Agile Integration Powerful possibilities with DesignState Zero Wait-State Company Confidential Do not distribute

Epdm Agile Webinar 3 2010 F

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Epdm Agile Webinar 3 2010 F

Enterprise PDM to Agile Integration

Powerful possibilities with DesignState

Zero Wait-State Company Confidential Do not distribute

Page 2: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

Agenda• Introductions• Company Information• Polls• Enterprise PDM Presentation• DesignState Presentation• Agile PLM Presentation• Question and Answer

Page 3: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

Introductions

Ramon BusboomEnterprise Group ManagerGoEngineer

Stephen PorterPartner, Vp of SalesZero Wait-State

David StewartPartner, CTOZero Wait-State

Rodney McCabeDirector of Product DevelopmentZero Wait-State

Page 4: Epdm Agile Webinar 3 2010 F

About Zero Wait-State

• Operating since 1999• Diverse customer base• Research Associate with SolidWorks• Gold Oracle Agile Partner• Extensive background in PLM

deployment and integration• Core competencies in Engineering

Collaboration, Data Migration and PDM and PLM Integration

Page 5: Epdm Agile Webinar 3 2010 F

About GoEngineer

Founded in 1984 North America’s Largest SolidWorks Reseller Oracle Gold Partner Extensive Expertise Supporting

CAD/CAM/PDM/PLM/3D Printing Technologies Over 7500 customers PDM/PLM Vertical Experience

Aerospace & Defense High tech Semi-conductor Medical Manufacturing

“It is our mission to help develop and support the most competitive product design teams in the world”

Page 6: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

organization

Other CADdata

Page 7: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

Granular Security

Scalable Solution

Unlimited Workflow

Replication

Fast Learning Curve

Data Connectivity

Search & Report

SolidWorksEnterprise PDM

Page 8: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

Granular Security

Scalable Solution

Unlimited Workflow

Replication

Fast Learning Curve

Data Connectivity

Search & Report

SolidWorksEnterprise PDM

Page 9: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

Fast Learning Curve

SolidWorksEnterprise PDM

Page 10: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

Fast Implementation

Low training requirement

Secure and Configurable

Built on Windows Explorer

Integrated within SolidWorks, Pro/E, ADSK

Fast Learning Curve

SolidWorksEnterprise PDM

Page 11: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

Powerful Search & Reporting

SolidWorksEnterprise PDM

Page 12: Epdm Agile Webinar 3 2010 F

SolidWorks Enterprise PDM

Where Used Information

Fast & Powerful Search/Reporting Capabilities

Promotes Design Reuse

Saved Searches

Powerful Search & Reporting

SolidWorksEnterprise PDM

Page 13: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

EPDM Integration Overview• DesignState Provides an interface from EPDM to Agile

PLM• The integration allows early visibility into design

information• The ability to leverage design data for

Bill of Materials reduces errors and streamlines process

• The interface is transparent to users eliminating learning curve and adoption issues

Page 14: Epdm Agile Webinar 3 2010 F

System Flexibility Through Customization

EPDMDesignState

DesignState features a powerful rules engine providing the ability to determine how objects get published and change orders created.

Through Agile process extensions, DesignState can be notified of events and perform actions on items in EPDM.

Page 15: Epdm Agile Webinar 3 2010 F

Application Process Flow

EPDM

1. State change issued against CAD objects

2. EPDM Workflow exports changed data

3. Data is sent to DesignState

1. Parts created in Agile if they do not exist with attachments

2. ECO created3. Parts added to ECO as

affected items4. BOM Structure created

DesignState

Page 16: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

EPDM Workflow Export

EPDMWorkflow

Change approved transition

BOM Exported

Page 17: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

DesignState Publish

Generate ECO Add Affected

Items

Page 18: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

Agile Change Order Result

Page 19: Epdm Agile Webinar 3 2010 F

PLM Provides Visibility & Expedites Processes

19

Greater Executive Process Visibility Portfolio Management

Tracking, Status Reporting & Analytics

DesignPartners

Suppliers& ExternalManufacturingPartners

Internal ManufacturingPlants

QMS-SOP/DHF/DMR/Regulatory/Quality(ECOs, Approvals, BOMs, Items, SOP’s, AML, Doc’s

Datasheets, Designs, Drawings, Artwork, Labeling, Packaging)

QA & R/A

Product Development

Operations

Sales &Marketing

International

Central Repository Single record of the truthIntegrated to Oracle ERP

Sourcing &Procurement

Internal Groups

Internal &External Partners

collaboration collaboration

DevelopConcept Plan Validate Launch Sustain EOL

Page 20: Epdm Agile Webinar 3 2010 F

Agile Product Governance & ComplianceProduct & program compliance against standards & regulatory requirements

Compliance Office

Agile Product Portfolio Management

Integrated product, program, resource & portfolio management

Executives & Program Office

Closed-loop product quality management across the extended enterprise

QualityProfessionals

Agile Product Cost Management

Product sourcing and lifecycle cost & risk management

Procurement Professionals

Agile Enterprise VisualizationNative document collaborative visualization across the global enterprise

Cross-Enterprise

Agile Engineering Collaboration

Engineering desktop integration & collaboration

Development& Engineering

Agile ProductCollaboration

Eng., Operations & Supply Chain

Enterprise product record visibility, management & collaboration

Agile Quality Management

Agile PLM Modules

Page 21: Epdm Agile Webinar 3 2010 F

© 2006 PTC 21

Specific OperationalImprovement Areas

17.5% reduction in product costs

75% reduction in ECO cycle times

25-35% reduction in design cycles

10-15% reduction in time-to-volume cycles

30-40% reduction in part duplicates and introduction of new parts

15-25% reduction in part search times (improving engineering efficiency)

Source: AberdeenGroup, Product Innovation Agenda Benchmark Report

Macro Financial Benefits Available To SMBs

PLM impacts small business

Page 22: Epdm Agile Webinar 3 2010 F

22

Example Customer ROI• Faster Time-To-Market — reduced by 25% • Increased Efficiency — improved by 30% • Reduced ECO Cycle Time — from 5 days down to 2

• 70% decrease in customer quote time• 87% reduction in document control costs • Lower costs due to 45% increase in supplier participation on bids

• Increased productivity, exceeding expectations by 25%. • Reduced change package cycle time by 30+ days. • Increased Visibility & Access to controlled docs by 30%+

• Managed to double gross margins • Went to a fully outsourced model in 18 months • Increased visibility & leverage of $1B in spend & 280 suppliers

• Reduced new product introductions process from 45 to 7 days • Reduced Costs: Lowered development costs • Increased Efficiency: Streamlined product development processes

Page 23: Epdm Agile Webinar 3 2010 F

Zero Wait-State Company Confidential Do not distribute

DEMO

[Questions & Comments]