Page 2: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Good drainage and nutrient/moisture retention

Tolerant to compaction

Sandy loam, clay loam

Is organic matter content important? ◦ Very important for root development and

nutrient/moisture retention

Page 3: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Distribution critical ◦ Pollination: < 0.2 PET

◦ Nut Size: 0.2 – 0.4 PET

◦ Oil Accumulation: 0.5 – 0.6 PET

Would you utilise irrigation? ◦ Need depends on rainfall pattern

◦ Irrigation critical for Nut Size and Oil Accumulation period when rainfall inadequate

Page 4: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Sufficient to provide economies of scale for cost efficient operations

Would it be staged plantings or all in one planting? ◦ Plant schedule dependent on finance and

availability of preferred grafted cultivars for the site

Page 5: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

HAES: 294-Purvis, 344-Ka’u, 508-Kakea, 800-Makai

Would you use pollinators? ◦ Cultivars to serve as pollinators for each other.

Page 6: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Minimum: 7.6 x 7.6 meters or greater

What row configuration would you plant? (east/west or north/south or on the contour?)

◦ North-South

What is the maximum length per row? ◦ 500-600 meters

Page 7: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Would you mound the rows? ◦ Not Necessary

◦ Grade land to allow mechanized operations

(planting shade tolerant grasses?) ◦ Establish grassed water-way on a contour at 150

to 300 meter interval within the field to trap eroded soil and minimize run-off into streams.

Page 8: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Year 5 production target = 0.03 (tonnes of

SK/ha)

Year 10 production target = 0.68 (tonnes of

SK/ha)

Year 20 production target = 1.41 (tonnes of

SK/ha)

Page 9: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

◦ None

What method would you use? ◦ None

Page 10: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

IPM ◦ Pesticide

◦ Natural enemies

◦ Establish habitat for natural enemies

Page 11: Dream team panel session   orchard management case studies - green field orchard - alan yamaguchi

Please incorporate any additional ideas/points/issues you feel are important. ◦ Compile as much environmental data for orchard

site: Climate, Soil, Irrigation

◦ Select Cultivars with compatible bloom periods, nutrient requirement, drought tolerance, pest resistance, kernel quality retention during delayed harvest.

◦ Cultivar growth rate at selected site to determine tree space and plant configuration