Presentation Content Overview

2

• The contents of this presentation were originally created as part of comprehensive datacentre relocation planning activities. • The presentation depicts the key focus

areas for creating a technical and solution based workshop agenda to extract relevant information as quickly as possible. • Hopefully this information is informative

and useful for your own datacentre relocation or similar project / programme.• Feel free to contact me for further advice

and assistance.

Page 3: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959393

Overall Approach

USI

NG

INFO

RMS

Trawl

Validate

Gap Analysis

Resolve Gaps

Plan

TECHNIQUESFOCUS AREAS

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

OUTPUT

Dependencies

Task List

Accountabilities / RACI

Confidence Rating

Risks

Logical Work Order

Things Not Known

Current Issues

Steps to Budget Clarity

• Rapid workshop sessions are held in order to quickly define the required tasks and activities, capture risks and issues as well as create a joined up and logical timeline

• Accelerated techniques are used to reduce time impacts on technical teams and overall businessThe workshop structure is comprised as follows:

Page 4: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959394

Focus Areas – Architecture / Solution Config

• Software installation • Application Installations and Configuration• Monitoring tools configuration / setup• SMS Service Configuration• Backup Configuration• Scheduler Tool Setup • Batch File Services• Comms Services• Oracle Configuration

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• The comprising logical components of each solution, the formal roles activities that they perform and configuration.

• Diagrams / schematics of each of the solutions will need to be provided and validated to ensure that a single and shared version of the truth exists as a reference for follow-on work.

To include:

Page 5: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959395

Focus Areas – Connectivity (Between Systems)

• Interface Configuration• Gateway Configuration• MFT Configuration• MSP Configuration• MQ Server Configuration

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• How connectivity between system components and other systems is currently performed

• The protocols and methods of intercommunication will need to be validated, agreed and documented for possible replication in another location

To include:

Page 6: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959396

Focus Areas – Data

• Schema Configuration• Data Synchronisation Methods / Configuration • Data Transfer (temporary or production)• Data Storage

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• The repositories of data as well as how data flows from component to component and system to system

• The data flows will need to be validated and documented to be able to be used in designing an appropriate test approach and therefore ensuring the system is working as planned

To include:

Page 7: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959397

Focus Areas – Infrastructure

• Physical Server Purchase and Delivery• Physical Servers Preparation and Assembly• Operating System Setup

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• The physical components that make up each of the solutions• The types of hardware, cabling, as well as ancillary physical

items that are required for the solution to work, and how they relate to each other.

• These may need to be replicated in the new location

To include:

Page 8: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959398

Focus Areas – Testing / Troubleshooting

• Test Data Requirement / Creation• Application Testing• Connectivity Testing• Integration Testing• Operating System Setup

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• How each physical and logical component part of a solution, as well as the solution itself can be validated as working correctly

• Existing methods as well as possibly new methods need to be identified and included in test governance and plan

To include:

Page 9: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 77761959399

Focus Areas – Location

• Floor Space• Rack Space• Power Requirements• Air Conditioning Requirements

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• The requirements for each solution on the co-location and dedicated data centre

• Information will be used to perform capacity planning as well as understand the logistical requirements of physically moving the equipment

To include:

Page 10: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 777619593910

Focus Areas – Network

• IP & DNS Hostname• Active Directory Configuration• Application Traffic Specification• Firewall Configuration• VPN Configuration• Network Cabling• Lease Lines• PRI Lines

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• The network requirements of the solution, as well as any current limitations.

• Identification of IP Address usage and approach to change • Establishment of network diagram for each solution

To include:

Page 11: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 777619593911

Focus Areas – Security

• OS Hardening Requirements• DB Hardening Requirements• Admin ID Creation• Concession requests

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• The current, interim and end state security requirements • What levels of security are currently imposed on the system

and need to be replicated.• Will additional changes be required in the interim• Will concessions be required to be sought?

To include:

Page 12: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 777619593912

Focus Areas – Timeline

• Delivery Lead Times• Constraints• Dependencies• Effort• Durations• Priorities

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• Capture of external activities that may constrain the relocation, as well as any logical technical prioritisations

• Informs and provides information for the overall plan of activities. Allows activities to be formally tracked and progress to be measured.

To include:

Page 13: Datacentre Relocation Workshop Agenda Content

[email protected] | +44 (0) 777619593913

Focus Areas – Manpower / Expertise

• Capability Assessments• Resource Availability (Annual Leave)• Department Capacities• 3rd Party Assistance

Connectivity(between systems)

Data

Infrastructure

Location

Network

Security

Architecture / Solution Config

Testing / Troubleshooting

Timeline

Manpower / Expertise

• Assess the availability of required skills and specific individuals to undertake relocation work

• Identify any limitations in skillset and knowledge as well as methods to fulfil gaps

• Team and department capacity issues

To include: