© 2008 OSIsoft, Inc. | Company ConfidentialOCEANIA TECHNOLOGY SEMINAR 2008
Data Center & Data Center & IT Solutions GroupIT Solutions Group
Oceania User Conference
May 7, 2008
Martin Otterson, OSIsoftMartin Otterson, OSIsoftChristian Luckock , OSIsoftChristian Luckock , OSIsoft
2OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Dat
a C
ente
r &
IT
Sol
utio
ns G
roup
OSIsoft’s Market Focus and Experience
3OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
• Energy consumption produces Computing– Requires “holistic” monitoring
for continuous improvement– Efficient energy consumption
with most profitable outcome– Identify the bottlenecks– Treat all individual systems-
as ONE• Mechanical, Power, IT ,
Security as a complete system
Data Center Space- is the “Plant for IT”
4OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
What does the OSIsoft product address (in other words what’s the bottom line)
In the U.S. Environmental Protection Agency ENERGY STAR ProgramsReport to Congress on Server and
Data Center Energy Efficiency Public Law 109-431 Issued August 2, 2007
The following conclusion was stated…… “greater energy-efficiency gains may be realized by optimizing the
operation and efficiency of the data center as a holistic system (e.g., holistic system (e.g., through real-time, facility - level energy monitoring and through real-time, facility - level energy monitoring and
management systems)….”management systems)….”
The OSIsoft PI platform is an easy to use infrastructure that allows the collection of data in real-time from any source (IT, BMS, Facilities,
networks, etc.) to be retrieved, correlated, analyzed, and visualized to be used to improve energy utilization within the datacenter.
5OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Customers outcomes.. “Your Data Your Decisions”
• Operating Expense Reduction• Capacity Planning• Risk Mitigation• Deployment Optimization• Power Monitoring & Management • Green Initiative• Carbon Efficiency• Contractor Management (SLA)• Virtualization success metrics• Operations & IT Convergence• LEED’s baselining and tracking
6OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Power Distribution Model
Measurement ID Description
M1 Utility Provider Total Power Load Measurement
M2Power Load for Non-critical systems (lighting, offices, etc.)
M3Power Load for HVAC and Other Mechanical Systems
M4Total Power Load for Devices and Other Critical Systems
M5 Cooling Tower Load
M6 Chiller, Air Handler Load
M7 CRAC Unit Load
M8 UPS Load Measurements
M9 Pole, Circuit and Rack Loads
M10 Individual Device LoadSNMP
Interface
ALC RDBMS Interface
7OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
• Calculations based on actual experience
• Indicators
• Display real-time and historic
Measurement to Value
• How are these performing to provised levels?
• What is the capacity? To actual?
• Slow response times drive down productivity.
• Network failure (router or switch) drives transaction Rate to zero.
• .CPU per KW used “ Useful work
• What is our ability to handle a failure at peak loads?
BUSINESS RULES MEASUREMENTS
• IT – Network
• Device performance
• NetFlow• IP SLA
– Servers– Applications
• Power– PDU
• AMP/WATT– UPS Batteries
• Float Voltage• Temperature
– Smart Power Strips
• Mechanical– Chillers
• Set points• Efficiencies
– CRAC• Humidity• Temperature
– Air Handlers• Service hours• Efficiency
KPI
8OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Monitoring with Cisco ISR and PIThe new opportunity:• Leverage the reliability and security of the Cisco ISR with
integrated PI server to monitor both Operational and IT performance– Improved deployment and integration with a single
device– Improved security
• Meet compliance requirements– Improved operations
• No loss of data• More visibility• Better decision making
9OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
`
OSIsoft/Cisco Architecture
Devices/Data sources
RtWebParts Windows Server 2003
Windows SharePoint Services
Microsoft SQL Server 2000
TrustedConnections
PI RtPortal
`
Internet Explorer
Smart Client ProcessBook
DataLink
ActiveView
Thin Client RtWebParts
Check in & out documents from SharePoint
10OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
``
ENTERPRISE
Data Center
Smart Connectors
MFG Sites
Division HQ’s
BusinessSystems
PortalServers
ApplicationServers
Remote PI System
PI Analytics
Smart Connectors
Remote PI System
`
`
`
PI Analytics
Smart Connectors
`
`
Division Level PI System`
`
`
`
`
Management & HA
PI Analytics
Smart Connectors
Data Access
Enterprise PI System
`
`
`
Enterprise architecture of PI- Visualization
11OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Value Now, Value Over Time
Va
lue
and
Effo
rt
InitialSoftware
Investment
{Incremental effort yields sustainable gains
Effort
Target(time, value)
Condition Based Maintenance
Time
Va
lue
with
PI
Branch Circuit MonitoringCapacity PlanningBCS Historian VirtualizationHeating & Cooling StudiesEnvironmental ComplianceEnergy Management
12OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Live DemoLive DemoChristian LuckockChristian Luckock
13OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
The ROI
• Efficiency– Increased utilization of DC resources– Increased worker productivity- Useful work
• CPU per KW comparison– Condition Based Maintenance (CBM)
• Operational Intelligence– Increased environmental understanding– Proactive vs. Reactive – Facility Design Improvement
14OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
50%
20%
30 to 33%
15OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
What does one MW cost for 1 year?
• 24 Hours x 365 Days = 8,670 hours in a year• 1 Mega Watt (MW) = 1,000 kilowatts (kW)• At $0.10 per kW Hour gives the simple formula:
8,670 x 1,000 x $0.10 = $876,000The Cost of 1 MW of power at $0.10 per kWH for one year equals $876,000.
• At $0.063 per kW Hour gives the simple formula:8,670 x 1,000 x $0.063 = $546,210
The Cost of 1 MW of power at $0.063 per kWH for one year equals $546,210.
16OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Very Simplified Math
• If DC has 1MW capacity (facilities and IT)• If rate $.063 per kWh (national average)• Total yearly electric cost is $546,200• Yearly cost reaching the IT (30%) is $165,546• Potential savings per 1 MW???• Today represents a typical efficiency of 3 using the
proposed PUE metric• Goal is too reach PUE of 2 within 3 years• If no IT improvements the savings would be
>$200K per 1 MW of DC
17OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
What is the impact of efficiency on the energy cost of an asset at different efficiency levels?
Loss@ $0.10UsageFactorEfficiencyMW
438,000876,00050%2.0050%1
292,000730,00050%1.6760%1
187,714625,71450%1.4270%1
108,500547,50050%1.2580%1
48,667486,66750%1.1190%1
$0$438,00050%1.00100%1
• 1 MW for 1 Year @ $0.10 = $876,000 energy bill
18OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Microsoft on OSIsoft as a vendor
“We are using the OSIsoft PI System to monitor all the critical points within our data centers, and in turn are laying the foundation for a high-availability, global Live infrastructure...”
“The return on investment is tremendous. We are enabling innovation through increased collaboration, social networking and commerce—leading to breakthroughs in software plus services. We are setting industry standards with increased utilization of facility resources, real time business continuity, and green computing technologies. As we continue to expand our Live services, the combination of OSIsoft and Microsoft technologies are bringing new levels of performance and reliability to our world-class data centers.”
19OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential
Outcomes by Customers using PI in the data center and facilities
• 2 % return of power savings for their global Data Center- Microsoft Data Microsoft Data Center OperationsCenter Operations
• Reduced FTE’s by eliminating manual entry of data enabling real-time reporting - IBM RESO groupIBM RESO group
• Visibility within IT, Facilities, and Public Works for one version of the truth has reduced down-time through rapid troubleshooting and diagnosis- US Army, Ft US Army, Ft CarsonCarson
• An 8% reduction in IT server energy consumption while maintaining a high service level- Weill Medical College of Cornell UniversityWeill Medical College of Cornell University
• PI became an essential tool to help us take the right decision and contributes to achieve our goal of a reduction of 2% in energy usage annually- Cascades Cascades PaperPaper
• The overall impact of the system is that Eastman Kodak was able, “with confidence,” to shut down one of the two power plants, leading to savings in the millions of dollars and payback in 24 months.-Eastman Kodak Company-Eastman Kodak Company