12

Click here to load reader

Computer integrated production planning system

Embed Size (px)

DESCRIPTION

Computer In

Citation preview

Page 1: Computer integrated production planning system

COMPUTER INTEGRATED

PRODUCTION PLANNING SYSTEM

ByNIRMAL THOMASM.Tech RoboticsSRM University

Page 2: Computer integrated production planning system

DIFFERENT TYPES OF COMPANIES…..

1.Automobile Companies

2.Mobile Companies

3.Robotics Companies

4.Defence Manufacturing

5.Tools Manufacturing Companies

6.Food manufacturing

7.Cosmetic Companies………….List Goes……to Infinity

Page 3: Computer integrated production planning system

FOR FUNCTIONING OF ALL THESE COMPANIES….

WHO IS IMPORTANT…….?

If they doesn’t exist the Company Doesn’t

Page 4: Computer integrated production planning system

SO WE NEED A CUSTOMER INTEGRATED PRODUCTION METHOD

For that what we need???? We should know the taste of the Customers….

For that customer enquiry is needed

What if the company doesn’t survive….in near future? For that we need market analysis…to know the taste of the market in future

Forecasting

What about the raw materials and Inventory ? We should know which type of raw materials we need to use …

From where it is easily available

Page 5: Computer integrated production planning system

WE SHOULD KNOW ALL THESE BEFORE PRODUCTION

In Production Planning all these process iscombined in one roof called “ProductionPlanning System”…

Production planning should be dynamic innature and always remain in fluid state asplans may have to be changed according tochange in circumstances

Page 6: Computer integrated production planning system

REQUIREMENT OF PRODUCTION PLANNING

It should be based on valid data(data from previous experience, forecasts etc.)

It must be flexible

It must satisfy a set of pre-defined objectives (economy, quality, quantity etc.)

It must be simple and straightforward

It should have a reporting system, so that the right information reaches at right place and at right time

Page 7: Computer integrated production planning system

PRODUCTION PLANNING LEVELS

Master Production Scheduling

Production Planning and Control Systems

Aggregate Planning

Long-Range (Capacity) PlanningLong-Range

(5years)

Medium-Range

(6-18 months)

Short-Range

(weeks)

Very-Short-Range

(hours - days)

Page 8: Computer integrated production planning system

AGGREGATE PLANNING

Planning up to 2 years ahead

Planning for how the demand be met from existing facilities and resource input?

Utilizing the available tools optimally

Page 9: Computer integrated production planning system

AGGREGATE PLANNING

Page 10: Computer integrated production planning system

COMPUTER INTEGRATED PP…

All the Planning Process are computerized

All the functioning of the company can be seen in one window

Modification can be done from any remote corner of the world

Changes will automatically take place in all fields

New software's can control even machines to control the production

Labor force required for planning is reduced

Entire Lifecycle of the product can be monitored

Page 11: Computer integrated production planning system

SOFTWARE'S USED PP..

Examples: Dassult DELMIA, Dassult Solidworks Enovia,Preactor APS,etc……

Product Life cycle Management software's

Page 12: Computer integrated production planning system

THANK YOU…

Text book: CAD CAM BY GROOVER (PAGE 812 - 815)