14
1

CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

1

Page 2: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

Process driven Product Lifecycle Management

Şerban FlorinCENIT SRLIaşi, România

FROM INNOVATIVE

IDEAS TO PERFECT

PRODUCTS

Page 3: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

33

04/10/2023 © CENIT

Process Driven PLM

Goal: Linking engineering and business administration via process driven data and activity management

Main benefits Leaner and faster

business processes

Reduced cycle times

Reduced

manufacturing costs

Page 4: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

44

© CENIT

PROCESS DRIVEN PLM

MechatronicEngineering

Process & ProjectManagement

Visualization

Collaboration

DocumentManagement

Product StructureManagement

Process Driven PLM at a glance

04/10/2023

Page 5: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

55

Foster cross-team development

and collaboration

Common use of

standards

Early access to

production information

Process security in all

teams

Shorter development cycles

1. Mechatronical Development

Accurate procedures without detours

© CENIT04/10/2023

Page 6: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

66

Make engineering processes more secure, leaner, quicker and less cost-

intensive Control costs throughout the entire

process Standardize business processes Foster global collaboration Improve competitiveness Flexible solution with small

implementation effort

2. Process & Project Management

Just give it a short shrift

Details - © CENIT04/10/2023

Page 7: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

77

Reliable assessment instead of

abstract speculation

Everything at a glance within

intelligent interactive 3D documents

Higher process security from the

start

Increased process speed and

quality

Reduce costs by reducing

complexity

3.Visualization

Catch on faster

© CENIT04/10/2023

Page 8: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

88

Secure decisions by significantly improved product transparency during the entire product development process

Reduction of product development costs by variant creation with increased use of frequently used components

Optimal internal and external collaboration at any time

Clarity through user-friendly visualization

Ease of use through industry-specific adjustments

4. Product Structure ManagementTo have the entire product lifecycle under control

© CENIT04/10/2023

Page 9: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

99

Collaboration within the worldwide network

Collaboration beyond company boundaries

Collaboration of independent partners

Full speed processes

Transparence and secure collaboration

5. Collaboration

Easy distributed product development

© CENIT04/10/2023

Page 10: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

1010

In the beginning there is … the document Ideal platform for the control of document-

driven business processes

Dynamic process-driven document

management Easy changes Gain of quality and time Optimized PLM process from the start

6. Document Management

Everything always correct – errors excluded

Details - © CENIT04/10/2023

Page 11: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

1111

© CENIT

PROCESS DRIVEN PLM

MechatronicEngineering

Process & ProjectManagement

Visualization

Collaboration

DocumentManagement

Product StructureManagement

Process Driven PLM at a glance

04/10/2023

Page 12: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

1212

04/10/2023 © CENIT

Good to know about development in SAP

SAP = System Analysis and Program Development

• Basis concept = 1 common database and various modules

ABAP = Advanced Business Application ProgrammingHigh level Programming language

• Fully Object Oriented,

• Lends itself very nicely to all recent methodologies, like Agile development, Patterns usage etc,

• Easy to learn

• Enables effective, rock solid application

development in the SAP environment

• embedded relational database access

Page 13: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

1313

04/10/2023 © CENIT

Good to know about development in SAP

Web Dynpro = SAP Web based GUI development

• Powerful frameworks available

• Platform independent GUI‘s made easy

• Uniform metamodel for all types of UI.

• Full integration to SAP backend technology

• Supports mobile Applications

Page 14: CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM

1414

© CENIT

CENIT SRLCalea Chişinăului 104-106bis700180 Iaşi

Phone: +40 332 430 574Fax: +40 332 430 572

Thank you for your attention

Please visit our homepage: www.cenit.ro

Feedback

For our next

Meeting we look forward for your

04/10/2023