CMMISM
04/07/23 Bahill1
Terry BahillTerry BahillSystems and Industrial EngineeringSystems and Industrial Engineering
University of ArizonaUniversity of Arizona
CMMISM
04/07/23 Bahill2
References• M. B. Chrissis, M. Konrad and S. Shrum, CMMI:
Guidelines for Process Integration and Product Improvement, Pearson Education Inc., Boston, 2003.
• D. M. Ahern, A. Clouse and R. Turner, CMMI Distilled: A Practical Guide to Integrated Process Improvement, Addison-Wesley, 2001.
• Some of the slides of this presentation were downloaded from these sites:
• http://www.sei.cmu.edu/sei-home.html• http://www.sei.cmu.edu/cmmi/• They are Copyright 2002 Carnegie Mellon
University, used by permission.
CMMISM
04/07/23 Bahill3
What is CMMI?• The Capability Maturity Model
Integration (CMMI) is a collection of best practices from leading engineering companies.
• It provides a model that you can base your company processes on.
CMMISM
04/07/23 Bahill4
A systemcan be implemented with• software• hardware• bioware• algorithms• organizations• processes
• You can call these types of systems.
CMMISM
04/07/23 Bahill5
What is process?A process is a set of practices performed to achieve a given purpose; it may include tools, methods, materials, and/or people.
CMMISM
04/07/23 Bahill6
Why focus on process? Process provides a constructive, high-leverage focus...• as opposed to a focus on people
- Your work force is as good as it is trained to be.
- Working harder is not the answer.- Working smarter, through process, is the
answer.• as opposed to a focus on technology
- Technology applied without a suitable roadmap will not result in significant payoff.
- Technology provides the most benefit in the context of an appropriate process roadmap.
CMMISM
04/07/23 Bahill7
When creating a processthe most important facets are• illustrating tasks that can be done in parallel• suggesting feedback loops• including a process to improve the process• configuration management
CMMISM
04/07/23 Bahill8
Why use CMMI?CMMI provides guidance for improving your organization’s processes and your ability to manage the development, acquisition, and maintenance of products or services. CMMI places proven approaches into a structure that
- helps your organization examine the effectiveness of your processes
- establishes priorities for improvement- helps you implement these
improvements
CMMISM
04/07/23 Bahill9
2.1.1.1 LTI Process Capability. A multidisciplinary, structured, and integrated development process with a strong emphasis on systems engineering, software engineering and integrated product and process development (IPPD) will be a cornerstone of the program. Capability Maturity Model Integration, Version 1.1, will be used as a guideline and benchmark when evaluating offeror’s systems engineering, software engineering and IPPD maturity and capabilities. Certification by relevant Capability Maturity Models (e.g., SECAM, SE-CMM, IPDCMM, etc.) is not required, except for Software Engineering, however, if such certifications have been obtained, that certification information will be considered during the Government’s evaluation process. … The LTI shall implement software management processes maintained at no less than level 3 of the Capability Maturity Model for Software (SW-CMM).
Objective Force Warrior Solicitation
CMMISM
04/07/23 Bahill10
AreasYour company’s divisions can be evaluated for• Software• Systems• IPPD*
CMMISM
04/07/23 Bahill11
CMM IntegrationSM ProjectThe CMM Integration Project was formed to• build an initial set of integrated models• establish a framework to enable integration
of future models• create an associated set of appraisal and
training productsSource models serving as the starting point for CMMI were• SW-CMM (software), V2.0 Draft C• EIA 632 (engineering) • EIA/IS-731 (systems engineering) • IPD-CMM (integrated product development),
V0.98
CMMISM
04/07/23 Bahill12
CMMI development teamMembership from• industry• U.S. government• Software Engineering Institute
Membership characteristics• average of about 21 years experience• from organizations with solid process improvement credentials
Financing from DoD
CMMISM
04/07/23 Bahill13
Development strategyBase the model content on current industry best practices as represented in widely-accepted source models.
Conduct public reviews of the models.
Conduct pilots of the product suite prior to official product release.
Update the product suite based on feedback from pilots and reviewers.
Release v1.0 of the product suite.
Update the product suite based on feedback from users.
Release v1.1 of the updated product suite.
CMMISM
04/07/23 Bahill14
The Bottom LineProcess improvement should be done to help the business—not for its own sake.
“In God we trust, all others bring data.”
- W. Edwards Deming
CMMISM
04/07/23 Bahill15
Categories of benefitsProcess improvement benefits fall into these general categories:• improved schedule and budget
predictability• improved cycle time• increased productivity• increased customer satisfaction• improved employee morale• increased return on investment• improved quality (as measured by defects)• decreased cost of quality
CMMISM
04/07/23 Bahill16
Results: Boeing Effort Estimation
.
0 %
140%
-140%
....
.
..
. ...
..
. .
. . . .
.. . .
. .
.
.. . . .. .. . . . . .... . . .. .
.. .
. ...
..
. .. .. ...... . .. . ... . .. . .. ..
Without Historical Data With Historical DataVariance between + 20% to - 145% Variance between - 20% to + 20%
(Mostly Level 1 & 2) (Level 3)
Ove
r/U
nd
er P
erce
nta
ge
.
(Based on 120 projects in Boeing Information Systems)
.. . .
.
.. .
...
. .
. ..
.. .
..
.. .. . .. . . . . .. . . . . .. .
... . .. . . . . . .. . . .. . . . .
. . . . .. . . . .. . . . . .. . . . .. . . . . .
. . . . . .. . . . .. . .
. . . . . . . .
. . . . . . . . .
. . . . . .. . . . . .
. . . . . .
Reference: John D. Vu. “Software Process Improvement Journey:From Level 1 to Level 5.” 7th SEPG Conference, San Jose, March 1997.
Improved schedule and budget predictability
CMMISM
04/07/23 Bahill17
Improved cost & cycle time
CMMISM
04/07/23 Bahill18
Increased productivity and quality
Lockheed Martin Naval Electronics & Surveillance Systems (NE&SS) - Radar Systems - Syracuse
CMMISM
04/07/23 Bahill19
Measurable return on investment
Return on software improvement investment was reported to be between 5:1 and 8:1.
(Herbsleb 94)
Process improvement provides measurable return on investment.
CMMISM
04/07/23 Bahill20
Improved program performancePerformance to contract
• Cost at Completion = BudgetIncreases in productivity
• 150% over 5 years• Industry Cost / Schedule Estimation Tool
(COCOMO) projects 20% reduction in effort for 1 level improvement
Decreases in Cost of Nonconformance• 40% down to 10%
Increased customer satisfactionROI 5:1 and greater
Raytheon Missile Systems Software Center
CMMISM
04/07/23 Bahill21
RememberThe CMMI model is not a process. This model shows what to do, Not how to do it or who does it.
CMMISM
04/07/23 Bahill22
SetContext
BuildSponsorship
CharterInfrastructure
CharacterizeCurrent &Desired States
DevelopRecommendations
SetPriorities Develop
Approach
PlanActions
CreateSolution
Pilot/TestSolution
RefineSolution
ImplementSolution
AnalyzeandValidate
ProposeFutureActions
Stimulus for Change
Initiating
Diagnosing
Establishing
Acting
Learning
The IDEALSM Model
SM IDEAL is a service mark of Carnegie Mellon University.
The IDEALmodel mapsto theSIMILARProcess
CMMISM
04/07/23 Bahill23
Using CMMI models with the IDEAL model1Initiating phaseCMMI models can assist an organization in understanding how to build sponsorship and in developing the infrastructure for improvement.
Diagnosing phaseThe Standard CMMI Appraisal Methodology for Process Improvement (SCAMPISM) provides a yardstick for appraising processes based on CMMI.
SM SCAMPI is a service mark of Carnegie Mellon University.
CMMISM
04/07/23 Bahill24
Using CMMI models with the IDEAL model2Establishing phaseCMMI process areas focus the process improvement teams.
Acting phase CMMI models provide guidance for defining or improving processes.
Learning phaseLessons learned are documented and are the basis for revision of an organizational approach.
CMMISM
04/07/23 Bahill25
Process notation schemes1Process notations should represent• What activities are performed in the process?• Who does them?• Why are they done?• When are they done?• How are they done?• What inputs must you have?• What outputs do you produce?• How do you measure performance?
CMMISM
04/07/23 Bahill26
Process notation schemes2Different notation schemes emphasize different aspects of a process and, thus, have different strengths and weaknesses.
Different notations may or may not have the ability to conveniently represent
• sequencing of activities
• timing of activities
• data flow among activities
• hierarchical detail
• entry and exit criteria
• narrative information
CMMISM
04/07/23 Bahill27
Process notation schemes3Other notation scheme attributes
• flexibility
• simplicity
• ease of training and understanding
• availability of tool support
CMMISM
04/07/23 Bahill28
Common process notations• data flow diagrams• flowcharts• decision trees• check lists• task descriptors (narratives)• activity diagrams (UML)• functional flow block diagrams• IDEF0
CMMISM
04/07/23 Bahill29
Simplified notationFlow chart to show activity sequencingsupplemented with activity details as structured narrative
•Decision to •make change
•I•DENTIFY • •P•ROBLEM
•Operator
•SCF
•V•ALIDATE • •P•ROBLEM
•Senior Analyst
•Validated •SCF
•R•OUTE • SCF T•O• •A•FFECTED • G•ROUPS
•OASB Secretariat
•P•ERFORM • T•ECHNICAL • •& C•OST • A•NALYSIS
•AFMC/SSSG
•R•EVIEW • •R•ECOMMENDATIONS
•OASB Secretariat
•D•ETERMINE • •D•ISPOSITION
•Site OARB
•Decision to •make change
•D•ETERMINE • •D•ISPOSITION
•OASB
•Decision to •make change
•E•NTER • SCF-R•ELATED • •I•NFO • •INTO • D•ATABASE
•OASB Secretariat
•O•THER • •S•ITES •
•A•FFECTED • •?
•D•ETERMINE • •D•ISPOSITION
•Each Affected Site
•D•ETERMINE • •D•ISPOSITION
•ITW/AA OAP (ASPC)
•Decision to •make change
•A•SSIGN • P•RIORITY • •FOR • C•HANGE
•Unknown
•M•AKE • S•OFTWARE • •C•HANGE
•Software Engineers
•M•AKE • S•OFTWARE • •C•HANGE
•Software Engineers
•V•ERIFICATION • & •V•ALIDATION
•Certification Board
•Yes
•No
CMMISM
04/07/23 Bahill30
Activity details
Activity 1
Activity 2
Activity 3
Activity Details• What is the purpose of this activity? • Who participates in this activity? • What are the inputs needed to perform the activity? • What are the work products that are generated
by this activity? • How do you know when this activity should begin? • How do you know when the activity has successfully
completed? • What do you do to accomplish this activity?
What are the 3-6 subactivities that you perform to accomplish this activity?
• How do you determine or measure the performance of this activity?
• What activity is performed prior and after this one?
CMMISM
04/07/23 Bahill31
Maturity levels
1
2
3
4
5
Process unpredictable, poorly controlled, and reactive
Process characterized for projects and is often reactive
Process characterized for the organization and is proactive
Process measuredand controlled
Focus on processimprovement
Optimizing
QuantitativelyManaged
Defined
Initial
Managed
Optimizing
Defined
CMMISM
04/07/23 Bahill32
Process areasA process area (PA) is a cluster of related practices in an area that, when performed collectively, satisfy a set of goals considered important for making significant improvement in that area.
Practices are actions to be performed to achieve the goals of a process area.
All CMMI process areas are common to both continuous and staged representations.
A process area is NOT a process description.
CMMISM
04/07/23 Bahill33
Organizational Innovation and DeploymentCausal Analysis and Resolution5 Optimizing
4 Quantitatively Managed
3 Defined
2 Managed
ContinuousProcess Improvement
QuantitativeManagement
ProcessStandardization
BasicProjectManagement
Organizational Process PerformanceQuantitative Project Management
Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganizational Process FocusOrganizational Process DefinitionOrganizational Training Integrated Project Management for IPPDRisk ManagementIntegrated TeamingIntegrated Supplier ManagementDecision Analysis and ResolutionOrganizational Environment for Integration
Requirements Management Project PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management
QualityProductivity
Risk,Rework
1 Initial
Process AreasLevel Focus
CMMISM
04/07/23 Bahill34
CMMI Model Process Areas
CMMISM
04/07/23 Bahill35
CMMI applied to your lifeHigh SchoolCollege B.S.Graduate School M.S.Buy a carGet marriedHave childrenDid you plan the process?Did you discover and manage requirements?Did you use a formal analysis process for
important decisions?Does your family work as a team?Do you try to improve your personal
processes?*
CMMISM
04/07/23 Bahill36
Level 2 process areas1Project Planning The purpose of PP is to establish and maintain plans that define project activities.
Project Monitoring and Control The purpose of PMC is to provide understanding of the project’s progress so that appropriate corrective actions can be taken when the project’s performance deviates significantly from the plan.
Requirements Management The purpose of REQM is to manage the requirements of the project’s products and product components and to identify inconsistencies between those requirements and the project’s plans and work products.
CMMISM
04/07/23 Bahill37
Level 2 process areas2Supplier Agreement Management The purpose of SAM is
to manage the acquisition of products and services from suppliers for which there exists a formal agreement.
Measurement and Analysis The purpose of MA is to develop and sustain a measurement capability that is used to support management information needs.
Process and Product Quality Assurance The purpose of PPQA is to provide staff and management with objective insight into the processes and associated work products.
Configuration Management The purpose of CM is to establish and maintain the integrity of the work products using configuration identification, configuration control, configuration status accounting, and configuration audits.
CMMISM
04/07/23 Bahill38
Level 3 process areas1Requirements Development The purpose of RD is to
produce and analyze customer, product, and product component requirements.
Technical Solution The purpose of TS is to develop, design, and implement solutions to requirements.
Product Integration The purpose of PI is to assemble the product from the product components, ensure that the product, as integrated, functions properly, and deliver the product.
Verification The purpose of VER is to assure that the selected work products meet their specified requirements.
Validation The purpose of VAL is to demonstrate that a product or product component fulfills its intended use when placed in its intended environment.
CMMISM
04/07/23 Bahill39
Level 3 process areas2Integrated Project Management The purpose of IPM is to
establish and manage the project and the involvement of the relevant stakeholders according to an integrated and defined process that is tailored from the organization’s set of standard processes.
Integrated Teaming The purpose of IT is to form and sustain an integrated team for the development of work products.
Decision Analysis and Resolution The purpose of DAR is to analyze possible decisions using a formal evaluation process that evaluates identified alternatives against established criteria.
Risk Management The purpose of RSKM is to identify potential problems before they occur, so that risk-handling activities may be planned and invoked as needed across the life cycle to mitigate adverse impacts on achieving objectives.
CMMISM
04/07/23 Bahill40
Level 3 process areas3Organizational Process Focus The purpose of OPF is to
plan and implement organizational process improvement based on a through understanding of current strengths and weakness of the organization’s processes.
Organizational Process Definition The purpose of OPD is to establish and maintain a usable set of organizational process assets.
Organizational Training The purpose of OT is to develop the skills and knowledge of people so they can perform their roles effectively and efficiently.
Organizational Environment for Integration The purpose of OEI is to provide an integrated product and process development infrastructure and manage people for integration.
CMMISM
04/07/23 Bahill41
Level 4 process areasOrganizational Process Performance The purpose of
OPP is to establish and maintain a quantitative understanding of the performance of the organization’s set of standard processes, and to provide the process performance data, baselines, and models to quantitatively manage the organization’s projects.
Quantitative Project Management The purpose of QPM is to quantitatively manage the project’s defined processes to achieve the project’s established quality and process performance objectives.
CMMISM
04/07/23 Bahill42
Level 5 process areasOrganizational Innovation and Deployment The
purpose of OID is to select and deploy incremental and innovative improvements that measurably improve the organization’s processes and technologies.
Causal Analysis and Resolution The purpose of CAR is to identify causes of defects and other problems and take action to prevent them from occurring in the future.
CMMISM
04/07/23 Bahill43
HomeworkGo through the list of CMMI process areas and
state whether or not you think that I used that process in designing and managing this course, SIE-454/554A.
Give examples of what I did do and examples of what I could have done.
CMMISM
04/07/23 Bahill44
Specific Goals (SG)A specific goal applies to a process area and addresses the unique characteristics that describe what must be implemented to satisfy the process area.
Example from the DAR process area:
SG 1 Evaluate Alternatives.
CMMISM
04/07/23 Bahill45
Specific Practices (SP)A specific practice is an activity that is considered important in achieving the associated specific goal.
Practices are the major building blocks in establishing the process maturity of an organization.
CMMISM
04/07/23 Bahill46
SpecificPracticeNumber
DARSpecific Practice Name
Example
1.1 Decide if formal evaluation process is warranted
When to do a trade study
1.2 Establish Evaluation Criteria
What is in a good trade study
1.3 Identify Alternative Solutions
1.4 Select Evaluation Methods
1.5 Evaluate Alternatives
1.6 Select Preferred Solutions
CMMISM
04/07/23 Bahill47
The Decision Analysis and Resolution (DAR) Process
SelectEvaluationMethods
EvaluateAlternatives
PreferredSolutions
SelectSolutions
EstablishEvaluation
Criteria
EvaluationCriteria
IdentifyAlternativeSolutions
ProposedAlternatives
SelectionProblem
Decide ifFormal
EvaluationProcess isWarranted
ProblemStatement S
Manage the DARprocess
Recommendations
FormalEvaluations
These tasks are drawnserially, but they are notperformed in a serialmanner. Rather it is aniterative process withmany unshown feedbackloops.
Decision toNot Proceed
ExpertReview
Put in PAL
PresentResults toDecision
Maker
CMMISM
04/07/23 Bahill48
Generic Goals (GG)Achievement of a generic goal in a process area signifies improved control in planning and implementing the processes associated with that process area.
• Generic goals are called “generic” because the same goal statement appears in multiple process areas.
• Each process area has only one generic goal at each level.
CMMISM
04/07/23 Bahill49
Level 2 generic goalThe generic goal for all maturity level 2 process areas is: GG 2: The xxx process is institutionalized as a managed process.
A managed process is a performed process that is planned and executed in accordance with policy; employs skilled people having adequate resources to produce controlled outputs; involves relevant stakeholders; is monitored, controlled, and reviewed; and is evaluated for adherence to its process description.
CMMISM
04/07/23 Bahill50
Generic Practices (GP)Generic practices are activities that ensure that the processes associated with the process area will be effective, repeatable, and lasting.
Generic practices contribute to the achievement of the generic goal when applied to a particular process area.
CMMISM
04/07/23 Bahill51
Generic Practices Under GG 21
Generic practices for all maturity level 2 process areas:
GP 2.1: Establish an Organizational Policy
Establish and maintain an organizational policy for planning and performing the xxx process.
GP 2.2: Plan the Process
Establish and maintain the plan for performing the xxx process.
CMMISM
04/07/23 Bahill52
Generic Practices Under GG 22GP 2.3: Provide ResourcesProvide adequate resources for performing the xxx process, developing the work products, and providing the services of the process.GP 2.4: Assign ResponsibilityAssign responsibility and authority for performing the process, developing the work products, and providing the services of the xxx process.GP 2.5: Train People Train the people performing or supporting the xxx process as needed.
CMMISM
04/07/23 Bahill53
Generic Practices Under GG 23 GP 2.6: Manage ConfigurationsPlace designated work products of the xxx process under appropriate levels of configuration management.GP 2.7: Identify and Involve Relevant StakeholdersIdentify and involve the relevant stakeholders of the xxx process as planned.GP 2.8: Monitor and Control the ProcessMonitor and control the xxx process against the plan for performing the process and take appropriate corrective action.
CMMISM
04/07/23 Bahill54
Generic Practices Under GG 25
GP 2.9: Objectively Evaluate AdherenceObjectively evaluate adherence of the xxx process against its process description, standards, and procedures, and address non-compliance. GP 2.10: Review Status with Higher Level ManagementReview the activities, status, and results of the xxx process with higher level management and resolve issues.
CMMISM
04/07/23 Bahill55
Product Development ProcessDeployment-Improvement
DeployRaytheon standard
processes guide our business
Following R6 methods, we use CMMI metrics to guide
improvements to our processes and their deployment
MeasureCMMI measures the “goodness” of our processes and the
effectiveness of deployment
ISO
ISO wants us to plan, control and improve our processes