47
www.dataplex-systems.com Chalfont, UK June 8th

Citrix synergy updates 2010

Embed Size (px)

DESCRIPTION

Presentations from our Citrix Synergy event held on 8th June 2010 at Chalfont.

Citation preview

Page 1: Citrix synergy updates 2010

www.dataplex-systems.comChalfont, UK June 8th

Page 2: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Page 3: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Understand more about dataplex

Synergy Updates

XenApp & XenDesktop  AdvancementsAdvancements

How to get business backingg g

Free Lunch?Free Lunch?

Page 4: Citrix synergy updates 2010

www.dataplex-systems.com

Page 5: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

I t d ti d O iIntroduction and OverviewCitrix Synergy Review (Inc XenApp and XenDesktop)

Refreshment BreakCan your desktops be virtualised?

Demonstration – XenDesktop and XenClientAsk the experts discussion

Lunch and networkingLunch and networking

Page 6: Citrix synergy updates 2010

www.dataplex-systems.com

Page 7: Citrix synergy updates 2010

www.dataplex-systems.com

Page 8: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Established in 1996

Impartial ICT Consultancy

Design

Dataplex: Advisory | Professional Services | Service Desk

Nationwide Coverage

Group Turnover 2009 £16MGroup Turnover 009 16M

Delivered virtualised solutions for 14 years with 150+ years experience across our technical pool

Implemented PB’s of consolidated storage from physical SANImplemented PB s of consolidated storage from physical SAN and virtual storage

Secured over 300,000 endpoints with encryption software across public and private sectorsacross public and private sectors

Trusted Brand with partners and clients. Manchester 0845 260 5757

Oxford 0845 260 4747

Page 9: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Reduce Operational E

In a complicated world we simply do what we say:

ExpenseWe enable you to deliver business agility and resilience by the effective use of technology.

Deliver

the effective use of technology.

W d Business Value

Risk 

We ensure you are secure and compliant.

Mitigation & 

Compliance

Increase AgilityWe assist you in delivering a 

competitive edge and value to your stakeholders.

Page 10: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Page 11: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

P f i l IT Advisory Professional Services

Service Desk

Page 12: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

StrategicDefine why an organisation should 

AssessmentDetermine current state and assessundertake a new initiative and what 

impact it has to them commercially

Determine current state and assess against recommended objectives

TechnicalPlan and design against

ImplementationPlan and design against requirements Implement the solution

Service DeskSingle point of contact forSingle point of contact for operational efficiency

Page 13: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Business Continuity & DR Cloud Computing

Storage ArchitectureCollaboration & Messaging

Storage ArchitectureInfrastructure & Server Architecture

Tiered VirtualisationNetworking

Security & Compliance Managementg

Page 14: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

24x7 Service Desk

2nd & 3rd Line Support

Asset & System Management

Hosting & Managed Servicesg g

Vendor ManagementVendor Management

Page 15: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Management

Availability

P li t

Virtualisation

Server Proliant Integrity

Storage

Desktop

Networking

Desktop Security

Datacentre Security

Cloud Security

y

Page 16: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

www.dataplex-systems.com/blog.htm

d t l t /fli k htwww.dataplex-systems.com/flickr.htm

www.dataplex-systems.com/linkedin.htmp y

www.dataplex-systems.com/rss.htm

www.dataplex-systems.com/twitter.htm

www.dataplex-systems.com/youtube.htm

www.dataplex-systems.com/buzz.htm

Page 17: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

The solution Dataplex has created gives us a base for all our data storage requirements and is now

highly available to our secondary location.

Assistant MD, Futaba

the rightexpertise

Dataplex took time with us to

understand our requirements our

Dataplex took time with us to understand our

requirements for simplified management, expertise,

ethos and enthusiasm to excel in this project and deliver above

and beyond our expectations

requirements, our security and infrastructure

environments and the needs of the business going forward.

ICT M C tt T d

requirements for simplified management,

increased uptime and seamless migration. The team had the right expertise,

ethos and enthusiasm to excel in this project.

li bl d

our expectations IT Manager, BetFred

ICT Manager, Cotton Tradersp j

IT Manager, Jewson

Proven to be reliable and consistent with a technical team who's

input we can depend on

From the initial engagement through to project delivery and after sales support, they have never let us down and

demonstrated a very high level of t h i l t input we can depend on

Senior Management, AQAtechnical competence. Operations Manager, SSP

Page 18: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Presentations available from:http://www.dataplex‐systems.com/events.htm

Your feedback is important to us. Included in your packs are feedback forms, 

please take a couple of minutes to complete them and be entered into a draw for 

the chance to win a case of wine.

Page 19: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Page 20: Citrix synergy updates 2010

www.dataplex-systems.com

Page 21: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

“ConsumerisationSmartphonesSmartphones

“Consumerisation is the single H PCH PCis the single biggest trend 

Home PCsHome PCs

affecting t IT” Laptops &Laptops & NetbooksNetbookscorporate IT” Laptops & Laptops & NetbooksNetbooks

Page 22: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

How do I effectivelyi t t Wi d 7?migrate to Windows 7? 

How can I preserve and extendmy existing investments? 

How do I manage costs? 

How do I keep mydata safe and

How do I take advantage of virtualisation?

applications secure?

Should I embrace cloud services?

How do I ensure my applications are available

d b d? cloud services?and can be accessed?

Page 23: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Clean Fresh Build every time – FastSecure – All data is held in the data centre, or can be taken offline and managedmanagedAsset reutilisationF ilit t G IT d b d tiFacilitates GreenIT and carbon reduction schemesSimplify administrationReduced operational costpPerformance.

Page 24: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Cloud Hosted Virtual Desktops(Technologies * x) + (Vendors * y) = Confusion 

Terminal Servers

Application Virtualization

Internal Hosted Virtual Desktops

How do you assess your needs?

Page 25: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Support Efficiency

Licensing Scalability

Capacity Planning Security

R li bilit

p y g

Accountability

P i i i &

Reliability Accountability

Provisioning & Storage

Responsibility

Page 26: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

SummarySummaryNew Servers 3Consolidation Ratio 5:3:1

Consolidation 1640506070 Source Servers

Target Servers

8090

100 Source Servers

Target Servers0

102030

Processor Memory Disk Space Disk IO Network

304050607080Processor Memory Disk Space Disk IO Network

IO

01020

Server Count Rack Units Annual Energy Cost

Industry average for average CPU utilisation 6-8%

Server Count

Rack Units AnnualEnergy Cost

Energy Use (kWh/yr)

Heat Dissipation (BTU/yr)

Processor (%) Memory (%) Disk Space (%)

Source Server 18 19 3097.76 20651.7 70395360 19.6 63.0. 40.3

Target Servers 3 6 1576 80 10512 35845923 26 9 41 6Target Servers 3 6 1576.80 10512 35845923 26.9 41.6

Change -10 -13 -1520.96 -10139.7 -3459440 7.3 -21.3

Change (%) -76.9 -68.4 -49.1 -49.1 -49.1

Page 27: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

D t d kt i t li ti t i t li tiDo not compare desktop virtualisation to server virtualisation, they interact with hardware differentlyNot all desktop brokers are the sameNot all desktop brokers are the sameNot all hypervisors are the sameUsers do not care how many servers you are not running because of this projectUsers want a better experience than they get nowG t d kt i t li ti d ill kGet desktop virtualisation wrong and everyone will know about itGet server virtualisation wrong and only a pocket of peopleGet server virtualisation wrong and only a pocket of people know about it

Desktop Interaction is different to Server Interaction with hardware

Page 28: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

USERS: What they do, How they do it, When they do it

Page 29: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Solution:Solution:Remove the hard wired Remove the hard wired 

dependencies and consider the  dependencies and consider the  layers independentlylayers independently

Page 30: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Page 31: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Fi l ll d k didFirstly not all desktops are candidatesDon’t just ask the question how many users can I get on a box….Guess work is not an optionObjective tests are criticalWork with the user, they need to feel part of the processCombination of technical and business consulting is needed to ensure successgPartially automated and partially manualThere is a big human element to VDI, don’t forget it.

Stakeholder Engagement

Project Initiation

Assess & Analyse Design Review Implement

Project Management

Page 32: Citrix synergy updates 2010

www.dataplex-systems.com

Page 33: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Dissolvable agent reports configs: OS

Applications

CPU, Memory, Disk

Age of machineAge of machine

NICs

Monitorso to s

Printers

Peripherals.

Page 34: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

DissolvableDissolvable agent measures usage: Per user per appPer user, per app

Time in use

CPUCPU

Memory

Disk

Network

Latency

Graphics intensity

Login duration

App load times

Page 35: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

See how well specific machines, p ,users and applications fit in VDI:

Analyze by group Best Fit

Workload statistics

System CPU

User CPU

Memory UseMemory Use

Paging

Disk I/O

Network I/ONetwork I/O

Advanced metrics

User logons

App loading

Network latency

Graphics intensity

Categorize workloadsWorst Fit

Customizable ratings.

Page 36: Citrix synergy updates 2010

www.dataplex-systems.com

Page 37: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Establish Business Requirements and KPIS

Establish executive sponsorshipp p

Understand your operational IT architecture

Understand Business Goals and VisionThe ‘H’ Factor

Understand Business Goals and Vision

Gap Analysis of Current State to Desired State

Understand your users and their pains make them feel involved

User Involvement is key

Sponsorship is criticalUnderstand your users and their pains, make them feel involved

Analyze the assessment

bli h f A hi

Sponsorship is criticalCommunication is 

paramountEstablish your Reference Architecture

Develop Business Case for Virtual Desktop

POC/Pilot

Page 38: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

30 Day POC

Fully Supported/Managedy pp g

Windows 7 or Windows XP

AppSense UEM

H t d/St d A li tiHosted/Streamed Applications

Our Equipment, Your Environment

Mitigated Risk

Thin Clients Available from Wyse or HP

Page 39: Citrix synergy updates 2010

www.dataplex-systems.com

Page 40: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Page 41: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Based upon information about YOURIT OrganisationBased upon information about YOURBased upon information about YOURbusiness model and visionBased upon business information from within the industryBased upon a pedigree of TCO/ROI analysis within the Dataplex Technicalanalysis within the Dataplex Technical Consulting divisionTangible and quantifiable results to ensure your successful POC and assessment get board level sponsorshipsponsorship.

Page 42: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Organisations industry: Public SectorOrganisations industry: Public Sector500 desktops are in the organisation and 300 are being considered for virtualisation with the following mix: ROI Summary:

NPV S i £141 290Virtual Machines: 150 PC (existing or new) and 50 thin clientsDesktop Streaming: 25 PC (existing or new) and 75 thin clientsBlade PCs: 0 PC (existing or new) and 0 thin clients

NPV Savings ‐ £141,290ROI – 68%Payback Period – 12 months

Blade PCs: 0 PC (existing or new) and 0 thin clients

Citrix XenDesktop solution versus the As Is opportunities, projects that implementing the proposed solutions resulted in a TCO savings of £246 659 overimplementing the proposed solutions resulted in a TCO savings of £246,659 over a 3 year period.

To implement the proposed project will require a 3 year cumulative investmentTo implement the proposed project will require a 3 year cumulative investment of £282,184 including:

£247,545 in desktop infrastructure expenses, p p£34,638 in desktop infrastructure maintenance costs.

Page 43: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Data User settings

Business Agility and Continuity

App-V VDI/RDS

• Secure access to resources whether local or remote• Lower Carbon Footprint – contribute to the companies green

initiatives• Extend the life of existing Desktop through VDI

Page 44: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Converged Desktop 

• Increase desktop utilisation, reduce operating costs and improve service levels• Access to ALL applications and desktops at anytime from anywhere

• Flexibility and agility for infrastructure applications management and security• Flexibility and agility for  infrastructure, applications, management and security• Seamless physical, virtual and application management

• Don’t shy away from datacentre licensing – it maybe your new friendX k Li i i l d X A Li• XenDesktop Licensing includes XenApp Licenses

Page 45: Citrix synergy updates 2010

www.dataplex-systems.comwww.dataplex-systems.com

Presentations available from:http://www.dataplex‐systems.com/events.htm

Your feedback is important to us. Included in your packs are feedback forms, 

please take a couple of minutes to complete them and be entered into a draw for 

the chance to win a case of wine.

Page 46: Citrix synergy updates 2010

www.dataplex-systems.com

Page 47: Citrix synergy updates 2010

www.dataplex-systems.com