Case StudyBenefits of Transitioning from Manual Kanban to eKanban
Major Medical Device Manufacturer
July 2011
Building the Business Case for Change – How They Did It
Manual Kanban vs. eKanban Process Assessment
1. Created a flowchart (process map) of current state manual kanban processes.
2. Conducted interviews with process subject matter experts (SME’s) and staff to validate the current-state process map and gather estimates of current performance characteristics.
3. Analyzed the quantitative process performance metrics (i.e. Time, Cost, Resource Utilization, Service Level, etc.) required to support the manual kanban process
4. Identified, categorized and prioritized process/systems improvement opportunities enabled by transition to eKanban.
5. Designed the future-state eKanban process and performed comparative analysis to current state.
6. Established business case, presented findings and recommendations to management, gained buy-in and support, implemented eKanban, audited new current-state and adjusted to achieve optimal performance.
1. DrawFlowchart
2. Interview SMEs & Capture Metrics
3. Analyze Performance
4. Capture Improvement Opportunities
5. Design Future-state & Compare
6. Build Business Case, Obtain Buy-in, Transition
RapidProcess
Assessment
Summarization of Benefits –Directly attributable to transition from manual kanban to eKanban
People Process System
Resource time reduced by 92% Process time reduced by 92% Implementation of closed-loop, electronic pull-based replenishment system
Resource cost reduced by 93% Queue Time Eliminated Extensive use of barcodetechnology
Headcount reduced by 50% -reassigned to other areas
Service level increased by 57% Business rules and automated alerts linked to specific workflows
Significant improvement in buyer and supplier collaboration
Process simplified and automated. Went from 24 steps to 13 steps.
Real-time updates on all material replenishment transactions
Transition from reactive to proactive management
Transition from open to closed-loop material replenishment processes
Complete audit trails on all material replenishment transactions
Single version of the truth on all material replenishment transactions
Stock-outs eliminated Rapid deployment (90 days w/ERP Integration) and sub one year ROI
100% adoption by end-users & suppliers
Inventory trending down - $1M+ reduction in first six months
Low TCO
3
4
Manual Kanban
Process Analysis
• Staffing Assumptions– 12 FTE Buyers, Burden Rate $28.00/Hr.
– 6 FTE Material Handlers, Burden Rate $15.00/Hr.
• Process Observations– Average Manual Kanban Releases = ~400/Week
– Kanban releases are 100% manual
– Email, fax & phone are the primary means of communication with suppliers
– Kanban card prep./management is labor intensive
– Manual kanban process is open-loop
– Limited capability to collaborate with suppliers
– Multiple failure modes throughout process
– Limited to no capability to track, measure and report on supplier performance
– Reactive vs. proactive management system
5
Manual Kanban Process Observations
Manual Kanban Process Flow – Complex and Error Prone!
6
Complex Process Steps
1. Process Trigger: KRS Set-up & Management
2. Buyer establishes part classification „K‟, „R‟, „D‟
3. Buyer calculates bin size
4. Buyer creates Kanban Release Sheet „KRS‟
5. Buyer forwards „KRS‟ to WH Material Handler
6. Material Handler sets up bin “consumption and
signal”
7. Material Handler pull parts from consumption bin
8. Decision: Bin Empty
9. Material Handler Switches Consumption and Signal
bin
10. Decision: 2 Bin or ROP
11. Material Handler Faxes to Buyer
12. Material Handler Places original „KRS‟ in Pending
Confirmation Bin
13. Material Handler checks for received confirmation fax
14. Supplier Reply in 24 Hrs.?
15. Check due date & qty.
16. Material Handler attaches copy to „KRS‟ and places
in Buyer alert bin
17. Material Handler files faxed copy in date slot of date
sorter and „KRS‟ in consumption bin
18. Material Handler monitors date sorter
19. Decision: Part arrives on due date?
20. Decision: Parts critical for line?
21. Decision: Parts Qty. and Dock date correct?
22. Material Handler transfers actual qty. and dock date
to „KRS‟
23. Material Handler sends all completed fax copies to
Purchasing Support for entry into Supplier
performance database
24. Process End
Manual Kanban Process KPIs –Per Manual Kanban Transaction
7
Key Performance Metrics
Process Time per Execution 18.39
Duration 49.36
Service Level 43%
Takt 5.63
Arrival Rate Per Minute 0.2
Arrival Rate per Wk 400.00
Resource Cost 7.25$
Hours Per Work Period 7.5
Work Periods Per Day 1
Days Per Week 5
Time Units Minutes
Time / Cost Per Manual Kanban Execution
- Releases / Week
8
Manual Kanban Resource Time & Cost Analysis –Per Manual Kanban Transaction
Resources
Resource
Process
Time
Resource
Time
Resource
Cost
Buyer 12.25 12.25 5.72$
Material Handler 6.14 6.14 1.53$
Total 18.39 7.25$
Time Units are in Minutes
Probability-Weighted Statistics
Resource Time & Cost
Per Manual Kanban Transaction
9
Planning Period 250.00 Days
Time in Planning Period 112,500.00 Mins
Demand Node Number of Items
KRS Set-up & Management 20,000.00
Resource Productivity Factor Available FTE's Available Time Required Time Cost
Buyer 0.75 12.00 1,350,000.00 Mins 237,777.78 Mins 110,962.96$
Material Handler 0.75 6.00 675,000.00 Mins 163,651.11 Mins 40,912.78$
Total 2,025,000.00 Mins 401,428.89 Mins 151,875.74$
KRS Process - Pre Ultriva Annual Resource Time & Cost Analysis
Annual Resource Time & Cost
Analysis to Support Manual Kanban
Manual Kanban Resource Time & Cost Analysis –Annualized (250 Production Days / 20,000 Manual Kanban Releases
Manual Kanban VA/NVA Analysis
10
Process Key:White = VA TasksRed = NVA TasksYellow = Failure Modes & Proposed Solutions
Manual Kanban Failure Modes & eKanban Solutions
KRS Failure Modes eKanban Solutions
~1 – 3% of the time the Material Handler would forget to fax kanban release to Supplier. This routinely resulted in stock-outs situations.
Ultriva’s Collaborative Electronic Kanban (CEK) solution supports a closed-loop, pull-based material replenishment process. Electronic material replenishment signals are automatically sent to supplier on scan of empty bin.
~3% of the time the Material Handler would forget to fax ROP sheet to Buyer. Routinely resulted in stock-outs.
CEK handles both blanket and discrete POs. For blanket POs, electronic material replenishment signals are automatically sent to suppliers on scan of empty bin. For discrete POs, Buyers are automatically notified to release a manual PO on scan of empty bin.
• Material Handler did not check to ensure due date and qty. were correct on kanban card.• Material Handler did not update supplier confirmation info to on kanban release sheet.
Supplier specific ‘Business Rules’ w/ automated Buyer & Supplier alerts established for each material replenishment loop. Order qty./due date/receive qty./etc. confirmed on scan of barcode label. Supplier performance metrics updated with each scan.
Material Handler did not notify Buyer of need to create new PO for discrete orders.
Automated notification to Buyer whenever an Item reaches its ROP to release discrete PO.
11
KRS Failure Modes eKanban Solution
Suppliers claimed they did not receive the kanban release fax.
Automatic alerting to both Buyer & Supplier when Supplier does not acknowledge and satisfy each electronic replenishment signal within pre-determined time frames.
Material Handler did not update kanban release sheet with actual qty./dock date impacting KPI tracking/reporting on supplier performance.
Automated updates to CEK when receiving scans barcode label. Associated supplier KPIs automatically updated.
Unable to determine if part qty./dock date correct.
Order qty., due date, actual received qty. and receive date automatically validated upon scan of barcode label. Associated supplier KPIs automatically updated.
12
Manual Kanban Failure Modes & eKanban Solutions
13
Collaborative Electronic Kanban
Process Analysis
• Staffing Assumptions– 12 FTE Buyers, Burden Rate $28.00/Hr.
– 6 FTE Material Handlers, Burden Rate $15.00/Hr.
• Process Observations– Average Manual Kanban Releases = ~400/Week
– Kanban releases are 100% electronic
– Electronic signals are the primary means of communicating demand to suppliers
– One-time set-up of electronic kanban loops. System monitors and suggests resizing based on actual consumption patterns
– All material replenishment processes are closed-loop
– Real-time updates on material status based on barcode scans
– Significant reduction in overhead support requirements
– Actionable business intelligence on supplier performance
14
Collaborative Electronic Kanban Process Highlights
Collaborative Electronic Kanban Process Flow –Simplified & Automated
15
Simplified & Automated Process
1. Process Trigger: Release Electronic
Kanban Signal
2. Material Handler Scans Kanban Card
3. Email automatically sent to
Supplier/Buyer
4. Decision: P.O. Needed?
5. Decision: Supplier accepts within 24
hrs?
6. Order in Process at Supplier
7. Supplier Prints Kanban Label(s) &
Ships Part(s)
8. Decision: Goods Ship On-Time?
9. Decision: Goods In-Transit?
10. Receiving Scans Barcode Label to
Receive Goods
11. Decision: Are Goods Dock to Stock?
12. PointMan Automatically Updated to
Show Goods On-Hand
13. Process End
Key Performance Metrics
Process Time per Execution 1.50
Duration 1.75
Highest Utilization 2%
Service Level 100%
Takt 6.92
Arrival Rate 0.1
Arrival Rate per Wk 325.00
Resource Cost Per Execution 0.53$
Yield 100%
Hours Per Work Period 7.5
Work Periods Per Day 1
Days Per Week 5
Time Units Minutes
16
Time / Cost Per KRS Execution
Collaborative Electronic Kanban Process KPIs –Per Manual Kanban Transaction
Resources
Resource
Process
Time
Resource
Time
Resource
Cost
Material Handler 0.25 0.25 0.06$
Material Handler Scans Kanban Card0.25 0.25 0.06$
Buyer 1.00 1.00 0.47$
Buyer Adds P.O. 1.00 1.00 0.47$
Receiving Clerk 0.25 0.25 -$
Receiving Scans Barcode Label to Receive Goods0.25 0.25 -$
Total 1.50 0.53$
Time Units are in Minutes
Probability-Weighted Statistics
17
Collaborative Electronic Kanban –Process & Resource Time & Cost Analysis Per eKanban Transaction
Resource Time & Cost
Per eKanban Transaction
18
Collaborative Electronic Kanban –Annualized (250 Production Days / 20,000 eKanban Releases)
Planning Period 250.00 Days
Time in Planning Period 112,500.00 Mins
Demand Node Number of Items
Release Electronic Kanban Singal 16,250.00
Resource Productivity Factor Available FTE's Available Time Required Time Cost
Material Handler 0.75 6.00 675,000.00 Mins 5,416.67 Mins 1,354.17$
Buyer 0.75 12.00 1,350,000.00 Mins 21,666.67 Mins 10,111.11$
Receiving Clerk 1.00 1.00 112,500.00 Mins 4,021.88 Mins -$
Total 2,137,500.00 Mins 31,105.21 Mins 11,465.28$
Electronic Kanban - Post Ultriva Annual Resource Time & Cost Analysis
Annual Resource Time & Cost
Analysis to Support eKanban
Manual Kanban vs. Collaboratively Electronic Kanban –Process KPI Comparison Report
19
KRS Pre Ultriva vs. Electronic Kanban Post Ultriva Process KPI Comparison Report
Profile Current State Future State
Map Type Transactional Transactional
Bottleneck
Buyer creates
Kanban
Release
Sheet ‘KRS’
Buyer Adds
P.O.
Arrival Rates Differ 0.18 0.14
Hours Per Work Period 7.5 7.5
Work Periods Per Day 1 1
Days Per Week 5 5
Activity Nodes 34.00 13.00
Start Nodes 1.00 1.00
End Nodes 4.00 2.00
Paths 34.00 4.00
Performance Current State Future State Difference % Difference
Process Time 18.39 1.50 (16.89) -92%
Required Resource Time 18.39 1.50 (16.89) -92%
Total Queue Time 24.81 0.00 (24.81) -100%
Cycle Time 43.19 1.50 (41.70) -97%
Duration 49.36 1.75 (47.61) -96%
Utilization 89% 2% -87% -87%
Service Level 43% 100% 57% 57%
Minimum WIP 7.68 0.22 (7.46) -97%
Cost -$ -$ -$ -
Resource Costs 7.25$ 0.53$ (6.72)$ -93%
User Property Costs -$ -$ -$ -
Total of All Costs 7.25$ 0.53$ (6.72)$ -93%
Rolled Throughput Yield 100% 100% 0% 0%
Time Units are in Minutes
Improvement
20
Planning Period 250.00 Days
Time in Planning Period 112,500.00 Mins
Demand Node Number of Items
KRS Set-up & Management 20,000.00
Resource Productivity Factor Available FTE's Available Time Required Time Cost
Buyer 0.75 12.00 1,350,000.00 Mins 237,777.78 Mins 110,962.96$
Material Handler 0.75 6.00 675,000.00 Mins 163,651.11 Mins 40,912.78$
Total 2,025,000.00 Mins 401,428.89 Mins 151,875.74$
KRS Process - Pre Ultriva Annual Resource Time & Cost Analysis
Planning Period 250.00 Days
Time in Planning Period 112,500.00 Mins
Demand Node Number of Items
Release Electronic Kanban Singal 16,250.00
Resource Productivity Factor Available FTE's Available Time Required Time Cost
Material Handler 0.75 6.00 675,000.00 Mins 5,416.67 Mins 1,354.17$
Buyer 0.75 12.00 1,350,000.00 Mins 21,666.67 Mins 10,111.11$
Receiving Clerk 1.00 1.00 112,500.00 Mins 4,021.88 Mins -$
Total 2,137,500.00 Mins 31,105.21 Mins 11,465.28$
Electronic Kanban - Post Ultriva Annual Resource Time & Cost Analysis
Manual Kanban vs. Collaborative Electronic Kanban –Annualized Time & Cost Comparison Report
• $140K in labor savings• Three FTE resources freed-up
• Eliminated stock-outs• Improved OTD
• Reduced inventory
Key Contact Information
21
Frank Kapper
Director of Sales
Ultriva Inc.
1601 South De Anza Blvd, Ste. 260
Cupertino, CA 95014
Ph: (408) 828-8454