The comarison implementation SAP HANA system
model:
1. Traditional - The organization buys
2. Cloud Computing - The organization outsource
Implementation of the new software - even very favorable for the development of the company is always associated with high costs .
Fact 1:
Traditional model
● The need to purchase certified hardware
● Investments related to implementation
and maintenance of work equipment
● Expenditure on operating systems such
SLES or RHEL
Modele wdrożenia SAP HANA - wyzwania
Data Center Model
● Rent environment - SAP certified
hardware appliance for SAP HANA
● Scalable architecture
● Operating systems side Polcom
● Services in the equipment side Polcom
● Starting production servers , test development● The size of each overwritten data - 50 - 150 GB● The size of systems and data - approx. 10 TB● The types of databases SAP ERP , PI, SM● Taking into account a certain number of users and generated by
the document● Taking into account the perspective of a 5-year
Assumptions project
Assumptions project – documents and users
The number of reports per year
Frequency of report of a specific type
Types of documents and
reports
Very often
Every day
1 / week
1 / month
1 / quarter
1 / year
65
55
10
80
30
40
20 000
500
1000
50 000
120
40
Users of the system – 1000
Traditional model costs
Sample configuration of equipment
certified for 3 servers in klustrze ( test
developer , production ) :
● Processors: Intel Xeon E7-8880 v3
● Memory: 512 GB DDR4 RAM
● LAN 4x10Gb FC 2x8Gb
● Surface storage ( 10TB )
OPEX – 5 lat
321 230, 00 EURO
CAPEX +
● A team of specialists
● Office space
● Electricity costs and maintenance for
equipment and air-conditioning
● Service hardware , support acts , licenses
SLES or RHEL
● Migration and the launch
● Backup
About 173 800,00 EURO
Costs in Polcom Data Center
OPEX
Hire a certified SAP HANA environment of these parameters for
servers
Costs for 5 years period = 360 140, 00 EURO
● production● developer● test
Per month = 5 950, 00 EURO
Changing the center of gravity of project funding
CAPEX + OPEX
OPEX
Traditional model Polcom Data Center model
360 140, 00 EURO
Polcom Data Center vs traditional model
Polcom Data Center Traditional model
500 030,00 EURO
Analysing the costs of implementing SAP HANA in traditional
model and in Polcom Data Center , OPEX is approx. 60 % of the
total CAPEX and OPEX implementation in the traditional model .
This means saving of 40 %
Period
5 years
● On average, 40% lower cost of implementation and maintenance● Costs include all elements of fixed costs and additional costs● scalable architecture● speed of implementation● Support specialists , continuous supervision architecture