8
ProjecTracker SM Draw the roof Drive your business

Calculations

  • Upload
    rcsi

  • View
    135

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Calculations

ProjecTrackerSM

Draw the roof Drive your business

Page 2: Calculations

CALCULATIONS

Page 3: Calculations

1

2

3

Calculations

1

2

Catch Data from RCSi Estimator

Select “yes” or “no” for ProjecTrackerSM to Create an “Economy Bid” - calculations are based on your company’s“economy bid” default preferences (an option for the homeowner whose primary concern is price).

3 Edit applicable drop down menus in Company Standard Materials or “Leave Standard”. Click “Submit”.

Page 4: Calculations

Calculations

1 After clicking “Submit”, ProjecTrackerSM will generate calculations for the roofing job with your company’s materials.

2 Select the orange material titles to view estimate calculations.

1

2

Page 5: Calculations

1

If there was an error made in your original roof drawing in RCSi Estimator, you may re-catch data and overwrite existing data to erase your previously stored data.

Calculations

1 If the client requests a new proposal that requires you to change specifications/ showcase different materials while using the existing drawing data, then you select “Catch Data” and “Create New Number”. A new client subset number (CF# 25000.01) will help you accurately track proposals for your client. • For example, selecting CDX vs. OSB; 15# vs. 30# ASTM Felt Paper; different materials/ material groups.

2

23

3 Make selection and select “Submit”.

Page 6: Calculations

1

2

Calculations

It is always best to edit your roof drawing in RCSi Estimator and send the data to the server. If computer with RCSi Estimator is unavailable, this is a secondary option. First, select “CLIENTS” tab and select “Add Optional Client Data” and create a new subset #.

Select “Edit Raw Data” as a secondary option to editing the roof drawing in RCSi Estimator. *Only use if RCSi Estimator is unavailable. Select “Submit Changes”.

3

4

Select “Edit Surfaces” and select radio button for areas you would like to edit the surfaces on.

1

Select “Edit Skylights” and edit any applicable skylights.

2

3

Select “Edit Chimneys” and edit any applicable chimneys.

4

Page 7: Calculations

1

2

Calculations

Select orange text to print estimate calculations for a specific material. The material cost breakdown includes labor, materials, dump fees, profit, etc.

2

Select “Print Calculations”.

3 Select “File”, “Print”.

13

Page 8: Calculations

1

2

Calculations

1

Select “View/Download Raw Data.

3 Select orange button to “Download Records to Excel”. Select “Open” or “Save”.

3

Select “View” button ( ) to view raw data (surfaces, skylights, and chimneys). Select “Print” or “Close”.

2