Atrium Renovation Area July 6, 2010

Brickyard Bubble

Embed Size (px)

Citation preview

Page 1: Brickyard Bubble

Atrium Renovation Area July 6, 2010

Page 2: Brickyard Bubble

Bird’s Eye View of Brickyard Bubble July 6, 2010

Page 3: Brickyard Bubble

The Bubble will be 50x80 ft. July 6, 2010

Page 4: Brickyard Bubble

Frame for Brickyard Bubble July 6, 2010

Page 5: Brickyard Bubble

The Bubble will be to the left of D.H. Library July 6, 2010

Page 6: Brickyard Bubble

Bubble will be Located Between Harrelson and Atrium July 6, 2010

Page 7: Brickyard Bubble

Crews will Lay Utility Wire Under Bricks July 6, 2010

Page 8: Brickyard Bubble

Outside Seating will Remain in Place July 6, 2010

Page 9: Brickyard Bubble

Outside Seating Area and D.H. Hill July 6, 2010

Page 10: Brickyard Bubble

Wall Dividing Construction Area and Temporary Serving Area July 6, 2010

Page 11: Brickyard Bubble

Temporary Home of Li’l Dinos and Chick-fil-A July 6, 2010

Page 12: Brickyard Bubble

Temporary Serving Area July 6, 2010

Page 13: Brickyard Bubble

New Seating Area Open Fall 2011 July 6, 2010

Page 14: Brickyard Bubble

Moving Along as Scheduled July 6, 2010

Page 15: Brickyard Bubble

Bare Floors and Walls July 6, 2010

Page 16: Brickyard Bubble

The 50x80 ft. Bubble Takes Shape July 13, 2010

Page 17: Brickyard Bubble

Monday Marked the First Day of Assembly July 13, 2010

Page 18: Brickyard Bubble

A View of the Bubble Including Harrelson July 6, 2010

Page 19: Brickyard Bubble

Looking Through towards East Campus July 6, 2010

Page 20: Brickyard Bubble

Overlooking the Top of the Bubble July 13, 2010

Page 21: Brickyard Bubble

The Bubble Takes Up Limited Space in the Brickyard July 13, 2010