10
Concrete Roof Rehabilitation Project ASTEC RE-PLY ROOFING SYSTEM Case Study

Astec Concrete Roof Rehabilitation Project

Embed Size (px)

DESCRIPTION

Astec Concrete Roof Rehabilitation Project Overview

Citation preview

Page 1: Astec Concrete Roof Rehabilitation Project

Concrete Roof Rehabilitation Project

ASTEC RE-PLY

ROOFING SYSTEM

Case Study

Page 2: Astec Concrete Roof Rehabilitation Project

After surveying the roof and consulting with the technical staff at ICC, this roof has been determined to be a candidate for :ASTEC RE-PLY ROOF SYSTEM

CONCRETE ROOF REHABILITATION PROJECT

Page 3: Astec Concrete Roof Rehabilitation Project

Because several roof leaks appear to be emanating at the parapets these areas will be addressed with ASTEC Re-Ply waterproof base reinforced with polyester cloth and then finished with ASTEC Re-Ply Finish coat

CONCRETE ROOF REHABILITATION PROJECT

Page 4: Astec Concrete Roof Rehabilitation Project

CONCRETE ROOF REHABILITATION PROJECT

Although this section of asphalt roofing is small, 400 square feet, it also will be waterproofed and reinforced.

Page 5: Astec Concrete Roof Rehabilitation Project

In addition to waterproofing the roof, Astec Re-Ply is highly reflective and will help keep the roof surface cooler, and consequentially the interior of the house as well. Astec Re-Ply is also very resistant to salt spray. With this buildings close proximity to the ocean, salt spray resistance is a necessity.

Astec Re-Ply can be tinted to most colors if desired, and the system carries a ten- year material warranty backed by the manufacturer.

CONCRETE ROOF REHABILITATION PROJECT

Page 6: Astec Concrete Roof Rehabilitation Project

Concrete Roof Before

CONCRETE ROOF REHABILITATION PROJECT

Page 7: Astec Concrete Roof Rehabilitation Project

Concrete Roof

CONCRETE ROOF REHABILITATION PROJECT

Before

Page 8: Astec Concrete Roof Rehabilitation Project

Concrete Roof After

CONCRETE ROOF REHABILITATION PROJECT

Page 9: Astec Concrete Roof Rehabilitation Project

When completed the ASTEC® RE-PLY™ System will provide you with the following benefits and more:

Completely seamless –no areas for water to intrude.

ASTEC® RE-PLY™ is a Cool Roof System. It is white and reflective and will significantly lower heat gain into the building and reduce air conditioning load and energy use, it will eventually pay for itself and then pay a premium in energy savings.

The system is warranted by the manufacturer for material for a full ten years. If the roof is re-coated with just the finish product before the expiration at the original warranty, the warranty is extended for an additional ten years.

CONCRETE ROOF REHABILITATION PROJECT PROJECT

Page 10: Astec Concrete Roof Rehabilitation Project

Some Benefits of the Astec Re-Ply and Ceramic Coating Systems:

Save on annual electricity bills by reducing summer air conditioning costs.Save peak electricity demand costs if you have time-of-use metering.

Reduce roof maintenance and replacement expenses by extending roof life.

Increase indoor comfort in summer by reflecting heat from the roof surface.

Reduce the heat island effect in cities and suburbs.

Reduce air pollution and smog formation.

Reduce roofing waste added to landfills.

Help builders and building managers meet Energy Efficiency Building Standards such as Perl, LEED, etc.