Are you involved in the development and introduction of hardware technology products to the market? Would you like to understand how to assess a product’s feasibility for moving into development? During this session, Micah Bongberg, the President of Annuvia and his development partners will share their experiences in determining the feasibility of Annuvia’s innovative new “Beacon” product. Learn how they figured out that the product was NOT classified as a medical device, even though it attached to a Class III Automated Electronic Defibrillator (AED). Find out how they navigated a technological “pivot”, after the team discovered an optimal sensing methodology that was more reliable and scalable than originally planned.
Citation preview
Product Realization Group
Webinar SeriesWebinar Series
Product Feasibility
…. Annuvia case study, understanding product readiness
Michael KeerMichael KeerFounder and CEOProduct Realization [email protected]
©Product Realization Group, Inc., 2012 Pg 1
Where does Feasibility Fit?y
Product LifecycleFollows a product from concept to end-of-life
Feasibility is a subset of the product lifecycle, and focuses on understanding the readiness to move a product into development
©Product Realization Group, Inc., 2013 Pg 2
Impact of Feasibility in the
Product LifecycleProduct Lifecycle
©Product Realization Group, Inc., 2013 Pg 3
Importance of Feasibility in the Product Lifecycle
Escalator EffectEscalator Effect
2000
2500$$$$$$$$
1500
2000
$$$$$$
# of Units
500
1000
$$$$$$
#
0NPI Proto I NPI Proto II Pilot Vol. Prod.
Do it right from the start -
Feasibility
©Product Realization Group, Inc., 2012 Pg 4
Do it right from the start The leverage is HUGE!
Speakers
Micah BongbergMicah BongbergIs the President and CEO of Annuvia. Annuvia is one of the leading health, safety, emergency preparedness, and emergency response organizations in the United States.
Michael KeerIs the Founder and CEO of Product Realization Group. The PRG enables rapid and cost effective introduction of products to the market, regulatory compliance, manufacturing, service, and lifecycle
©Product Realization Group, Inc., 2013 Pg 5
compliance, manufacturing, service, and lifecycle support.
Speakers
Mark Brinkerhoff, PEMark Brinkerhoff, PEIs the President of Fusion Design. Fusion provides mechanical development services for medical, industrial, recreational and many other product applications
Walt Maclay Is the President of Voler Systems. Volerprovides electronic design and software services for medical, industrial, aerospace and instrumentation applications
©Product Realization Group, Inc., 2013 Pg 6
and instrumentation applications.
Feasibility Tips y p
Identify risks early (regulatory, technology, manufacturing, etc.)
Evaluate multiple solutions
Use known & easily available ytechnology
©Product Realization Group, Inc., 2013 Pg 7
Feasibility Tips y p
Consider emerging technologies & markets
Weigh evolutionary vs. revolutionary
Choose scalable solutionsTechnologygyManufacturing
©Product Realization Group, Inc., 2013 Pg 8
BEACON PRODUCT FEASIBILITY:CASE STUDY
©Product Realization Group, Inc., 20112
AED Industry Backgroundy g
Sudden Cardiac Arrest (SCA) is the leading cause of death in the United StatesAutomated External Defibrillator (AED) units Automated External Defibrillator (AED) units provide a therapy that can save the majority of victims (+70%)Time is of the essence: Victim loses a 10% chance of survival for every minute that passes
©Product Realization Group, Inc., 2013 Pg 10
Arch Software: What Does it Do?
Maintains records for AED owners, distributors, Maintains records for AED owners, distributors, and manufacturersRegisters units with local EMS or 911 dispatchOversee records by a licensed MDSend AED owners reminders to update equipment
©Product Realization Group, Inc., 2013 Pg 11
The Beacon Product Conceptp
Integrates with ArchIntegrates with ArchTurns our “static” database “dynamic”
Live FeedbackAutomatically “reads” an AED’s statusAccurate AED location/placement dataNotification Instant AED is openedNotification Instant AED is opened
Additional features (remote updates) updates)
Voice to connect rescuer with 911 operatorTemperature monitoring
©Product Realization Group, Inc., 2013 Pg 12
Now What?
T th k t t it hil t ti Toe the market opportunity while testing feasibility
Understand all risks and expenses (to build produce and operate)build, produce, and operate)
Does the market opportunity exceed the Does the market opportunity exceed the costs? How soon will we break even?
©Product Realization Group, Inc., 2013 Pg 13
Is it Feasible?
lRegulatory Environment
TechnologyTechnology
Time-to-Market
Manufacturability
C tCosts
©Product Realization Group, Inc., 2013 Pg 14
Regulatory Environmentg y
What class medical device would it be?What class medical device would it be?AED is class III, most highly regulated
Extra cost of developing a medical device can easily double the costcan easily double the cost
Quality systemRegulatory paperworkRegulatory paperworkFDA filingWaiting for FDA response
©Product Realization Group, Inc., 2013 Pg 15
Determining Regulatory Statusg g y
Getting FDA to give definitive advice Getting FDA to give definitive advice before a product is developed is very difficultdifficultPRG regulatory partner has experience working with FDA staffgWas able to get an email stating the proposed product would not be a medical deviceHuge savings in time and money
©Product Realization Group, Inc., 2013 Pg 16
Technology: Feasibility Approachgy y pp
Define key methods of detectionDefine key methods of detectionDesign a test set upBuild Build Test and submit resultsUpdate test set up per feedbackUpdate test set up per feedbackTestR t f ibilit fi diReport feasibility findingsUpdate Product Requirements
( )©Product Realization Group, Inc., 2013 Pg 17
Document (PRD)
Technology Feasibility
Product RequirementsProduct RequirementsSense a message on LCD displayg p yPhotosensor with LED illumination is simple, low cost detectorWide range in ambient light – dark to full sunCan’t obstruct view of Can t obstruct view of LCD display
Wireless data transmissionLow power consumptionQuickly open and replacedelectronics
Mechanical alignment
©Product Realization Group, Inc., 2013 Pg 18
Technology Feasibility - V1gy y
Built simple circuit & mechanical mock-up to test detection of warning
Tested in direct sunlightTested in full darknessTested in full darkness
2-3 weeks to design, build, and testTest results
Could sense error symbol in all light levelsDifficulty with reflected lightObstructed view of displayObstructed view of display
©Product Realization Group, Inc., 2013 Pg 19
Technology Feasibility - V2gy y
Pivot and design changePivot and design changeCamera chip sends image of LCD display
Easier to handle reflected lightTransmit entire image
Heavily compressed imageLarge amount of data still makes detection easierLarge amount of data still makes detection easier
Technical challengesReflected light / proper illuminationTransmit entire image with low power consumptionWhat type of wireless transmission?
©Product Realization Group, Inc., 2013 Pg 20
Mechanical Feasibility: V1 vs. V2y
LED Method Camera Method
VSVS
©Product Realization Group, Inc., 2013 Pg 21
Technology Feasibility - V2gy y
Built and tested mock-up (2 – 3 weeks)Built and tested mock up (2 3 weeks)Built circuit from development boards (off the shelf)Mechanical fixturing (board and light mount/shroud)
T t ltTest resultsDetection worked in all light conditionsDisplay obstruction satisfactoryp y yDetermined housing could support solution
Cellular service met requirements bestA il bl h AED l t dAvailable where AEDs are locatedSimple installation, no repeaters requiredLow monthly cost
©Product Realization Group, Inc., 2013 Pg 22
Technology Feasibility V2
Integrated Camera System
gy y
Integrated Camera System
©Product Realization Group, Inc., 2013 Pg 23
Product Feasibility
ConclusionsConclusionsRegulatory impactRegulatory impact
Knew what regulatory path was requiredLower cost and lower risk
I t f f ibilit t h i l kImpact of feasibility technical workAvoided designing a product that didn’t workSaved two months and 10% of Dev. CostLowered project risk – remainder of project had little uncertainty
Product Requirements Document completeProduct Requirements Document completeDesign schedule and cost accurately estimatedReady to begin the design
©Product Realization Group, Inc., 2013 Pg 24
y g g
Feasibility Tips (summary): Q&Ay p ( y) Q
Identify risks early (regulatory Identify risks early (regulatory, technology, manufacturing, etc.)Evaluate multiple solutionsEvaluate multiple solutionsUse known & easily available technologyConsider emerging technologies & marketsConsider emerging technologies & marketsWeigh evolutionary vs. revolutionaryChoose scalable solutionsChoose scalable solutions
TechnologyManufacturing
©Product Realization Group, Inc., 2013 Pg 25
Manufacturing
Product Realization Group
Webinar SeriesWebinar Series
Product Feasibility
…. Annuvia case study, understanding product readiness
Michael KeerMichael KeerFounder and CEOProduct Realization [email protected]
©Product Realization Group, Inc., 2012 Pg 26