17
CONFIDENTIAL | 1 Featured Project: Marina Bay Sands Casino Resort, Singapore Connecting teams project-wide Aconex Connected Cost Drive Project Performance Guy Barlow Global Commercial Director Aconex 20 November 2017

Aconex connected cost webinar - drive project performance

  • Upload
    aconex

  • View
    93

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 1

Featured Project:

Marina Bay Sands Casino Resort, Singapore

Connecting teams project-wide

Aconex Connected CostDrive Project Performance

Guy Barlow

Global Commercial Director

Aconex

20 November 2017

Page 2: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 2

Current approaches are flawed, wasteful & not sustainable

“A 1% reduction in costs would save the construction industry approximately $100 billion annually”

•Average project cost overrun is 70%•Prices of construction projects have risen faster than the consumer price index

+70%

Increasing Overruns & Costs

•Share price drop of 12% after a significant negative project event •Infrastructure projects are more exposed to political & economic risks

-12%

Growing Risks

•Only 1% in productivity gains over 20 years

•Reasonable productivity growth could add $1.6T to the industry

+1%

StagnantProductivity

Page 3: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 3

RFIs Change Orders & Variations

Payment ApplicationsTransmittals & Doc Distribution

Checklists & Punch ListsBid & Tender Management

Inefficient & Broken Processes

Disconnected, substandard project controls leave youuncertain and exposed

InformationSilos

Poor/FailingPerformance

CAN’T make informed decisions or take action

➕ =Estimates

Budgets

Actuals

Commit-ments

Schedule

Contracts

Page 4: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 4

Collaboration drives productivity & efficiency

As organisations evolve and collaboration platforms are adopted, there is clear evidence that processes become more efficient.

• Reduced costs• Shorter time• Lower risk

Evolution of the ANZ and Asia region’s airport project network – 173 projects, 3,529 participating organisations and 5.2M mails. This graph demonstrates how RFI processes have improved over a 7 year period.

Page 5: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 5

Are you confident and in control?

5

• Capture all project processes?

• Is information credible?

• At the right level?

• Real-time?

5.4%of projects meet

“best in class” for cost and schedule

Source: “Correcting the Course of Capital Projects”, PwC, 2016

Page 6: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 6

Manage, measure & report on project performance with confidence

•Every project member connected through key processes

•Accessible from anywhere – the office or the field

•Easy to use, intuitive and dynamic

Project-wide Collaboration

1

•Line-of-sight into issues; red flags are raised early•Quickly build customizable reports•Measure performance at the project and portfolio level

Early Warnings & Predictive Insights

3

•Full cost capabilities – budgeting, forecasting, variance, payments, etc.

•Flexible contracts & change management processes

•Planning & scheduling integration

Integrated Cost Controls

2

Page 7: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 7

Owner

GC

Subcontractors

Suppliers

PROJECT-WIDE COLLABORATIONA complete view of cost across the value chain

Page 8: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 8

INTEGRATED PROJECT

CONTROLSPLATFORM

Roy Hill Mine| Newman, Australia| US$10 billion

Schedule Integration

CostManagement

Handover to O&M

Bids &Tenders

ConnectedBIM

Design Document Reviews

Inspections, Quality & Safety

Submittals & Transmittals

Shop Drawing Reviews

Daily Site Reports

Requests For Information

Construction

Process

Platform

Insights & Reporting

Workflow Management

Page 9: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 9Roy Hill Mine| Newman, Australia| US$10 billion

EARLY WARNINGS & PREDICTIVE

INSIGHTS

Monitor & Manage

KPIs

Dynamic & Timely

Reporting

Discover & Action

Key Analytics

Configure & Rollout

Dashboards

Page 10: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 10

10

Page 11: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 11

Every project member on a connected platform with a single view

Project-wide Collaboration

Line-of-sight into issues

Early Warnings & Predictive Insights

Unified project controls for a single view of project performance

Integrated Project Controls

Connected Cost: Measure performance with confidence A modern collaborative project controls solution integrating cost, schedule, contracts & project information portfolio-wide.

Page 12: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 12

✓ Contracts administration

✓ Payment applications✓ Change management✓ Month-end

coordination tools✓ Back-end integrations

Contract Management: Keep projects moving with a single view across all contracts

• Avoid disputes with streamlined subcontractor management

• Minimize month-end chaos

• Focus on strategic activities & productivity

Page 13: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 13

✓ Actuals & commitments✓ Approved &pending contract changes✓ ETC & EAC✓ Variance✓ Percent complete: schedule,

cost, hours

Budgeting & Forecasting: Minimize project delays and cost overruns

• A single view across budget, changes, cost, & schedule

• Forecast accurately with unified processes & captured change

• Avoid duplicate data with ERP integration

Page 14: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 14

✓ Progress tracking at any level of the WBS

✓ View current period, to date, & at completion

✓ Performance metrics, including earned value

Variance Analysis: Measure program performance with confidence

• Early warnings to fix problems before they get out of hand

• Identify red flags at any level of detail

• Configurable variance thresholds

Page 15: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 15

Reporting & dashboards:✓ Actuals, changes, commitments✓ Control accounts✓ Rules of credit✓ Time phased data✓ Variance

Reporting: Gain early visibility for better decision making

• Industry standard reports with user-defined parameters

• Create reports in minutes with the point-and-click builder

• Gain insights across cost, hours, variance, and progress

Page 16: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 16

1. Single source of the truth – reality sets in when it’s time to report out

2. Connect schedule and cost – without it, the true effect of change is impossible

3. Flexible and scalable systems – your projects and business will change over time

4. Effective change management – manage change, from initiation to resolution

5. Informed decision making – get the facts, real-time & take the time

5 Ways to Minimize Complexity

Page 17: Aconex connected cost webinar - drive project performance

CONFIDENTIAL | 17

Featured Project:

Marina Bay Sands Casino Resort, Singapore

Connecting teams project-wide

Thank you.