If you can't read please download the document
Upload
simon-lapinski
View
920
Download
7
Embed Size (px)
Citation preview
2. Contents.
3. Site Location. Steel Bridge. Station Bridge. 4. History of sites.
A. Opening of canal in 1801. B. Repairs to Basin 1909. C. Dredging of canal 2000. 5. Details of Station Bridge.
6. Images of Station Bridge. A. View towards Bridge along North Wharf Road. B. View from bridge of Paddington Station side of canal. C. View under bridge of trellis work, bin and bicycle stand.D. View of bridge towards North Wharf Road. E. View from North Wharf Road towards canal. 7. Plan of Station bridge site. Section through study area. 8. Sectional elevation of study area and construction sections. 9. Materials and Plant use. A. Surface materials. B. Drainage. C. Street furniture. D. Signage. E. Planting. F. Lighting. G. Security. 100mm grey granite setts. 750mm x 500mm course light grey reconstituted pavers. 850mm x 450mm sandstone edging. Stainless steel platform of bridge. Slotted drainage channels. Inspection cover. Stainless steel bin. Stainless steel bicycle stand. Grit salt bin. Monolith seating with grey granite riser and Massarandubba timber tread.Directions to Imperial college. Sign post directions for Basin. Alnus spaethii. Lonicera(species unknown)climber. 200mm recessed uplighters within granite edging. 6m Geo range lamp posts. 6m high security camera. 10. Plan of circulation survey. 11. Evening experience. A. View of bridge from North Wharf Road. B. View of trellis work and bicycle stand. C. View from bridge of Paddington station side of bridge. D. View towards bridge along North Wharf Road. E. View of bridge towards North Wharf Road. 12. Details of Steel bridge.
13. Images of Steel bridge. A. View of Northern side of Steel bridge. B. View of Sheldon Square toe path towards Paddington Basin. C. View of Sheldon Square toe path towards Little Venice. D. Panoramic view of the Steel bridge. E. Entrance of Porteus Road Underpass by North side of bridge. 14. Plan of Steel bridge site. Section through study area. 15. Sectional elevation of study area and construction sections. 16. Construction of Granite sett toe path.
Photograph illustrating stages of laying granite setts along Paddington Central toe path. 17. Material and plant use. A. Surface materials. B. Drainage. C. Planting. E. Lighting. F. Seating. G. Signage. Resin boundgravel and sawn granite edging. Pink hoggin islands for trees. Granite setts laid soldiered and fan shaped separated by granite edging. Steel platform of bridge. Black engineering bricks and white concrete copping of retaining wall.150mm drainage channel running along centre of toe path to accept run-off. Platanus x hispanica. Tilia x europaea. Alnus incana. Buxus sempervirens. Viburnum davidi. Pachysandra terminalis. Eleaagnus ebbingei. 6m twin lamp post. 6m lamp post. Timber tread and riser seating with white stone base and galvanised metal centre. Paddington central toe path sign post. 18. Plan of circulation study. 19. Porteus Road Underpass Gateway.
A. View of underpass from Steel bridge. B. Enamel graphics. C. View through underpass. D. Possible installation under croft of A404. 20. Evening experience. A. View from A404 of North side of Steel bridge . B. View from A404 of Sheldon Square side of bridge. C. View of North side of bridge and Porteus Road Underpass. D. View from Steel bridge of Starbucks and Union bar and grill. 21. Bibliography.