© Novell, Inc. All rights reserved.2
Session Overview
Barriers to Platform Adoption
PlateSpin Migrate
Accelerate ROI
PlateSpin in Action - Essent®
© Novell, Inc. All rights reserved.3
Who cares?
© Novell, Inc. All rights reserved.4
Server Migration in the Real World
• “The PlateSpin solution from Novell saved Essent about €2 million for the data centre consolidation project alone”
– Marco Spoel, Project Manager, IT Infrastructure, Essent
• "Using PlateSpin we were able to complete 61 migrations within the targeted migration windows, saving an average of 4 hours migration time per server.“
– Joris Haverkort, Product Manager at Atos Origin Netherlands
• "The ability to perform the migrations remotely and over the WAN with no need to be physically in contact with the source and target servers saved us weeks if not months of work.“
– Neil Brindley, Senior Windows Systems Engineer, Midrange Services, AXA Tech Asia Pacific
© Novell, Inc. All rights reserved.5
Barriers to Platform Adoption:
© Novell, Inc. All rights reserved.6
Manual Rip and Replace
How do I get this stuff Up and Running?
© Novell, Inc. All rights reserved.7
Tools: Bare Metal Restore
• Multiple Steps– Image Capture -> Image Deploy -> System Configuration -> Pray…
• Error Prone• NOT Cross Platform• Downtime throughout the process• Labor Intensive
© Novell, Inc. All rights reserved.8
Tools: Pre-Staging + Replication
• Multiple Steps– Configure Identical OS Target -> Data Replication – System State Copy ->
Pray -> Cutover
• Software licensing complexity and cost• Replication complexity and cost• Labor Intensive
© Novell, Inc. All rights reserved.9
Tools: “Free” Migration tool
• Extra Manual steps– SysPrep
• Lack of Network Optimization• Single Platform Support• Minimal Error Logging
© Novell, Inc. All rights reserved.10
Finally a Better Way PlateSpin Migrate
© Novell, Inc. All rights reserved.11
Decouple workloadfrom host
infrastructure
Live peer-to-peer workload migration
With PlateSpin Migrate, you can automatically migrate server workloads over the network.
Migration testing Sync-up prior to cut-over
PlateSpin® Migrate
PhysicalServers
VirtualHosts
BladeServers
ImageArchives
Workload Decoupledfrom Hardware
© Novell, Inc. All rights reserved.12
PlateSpin Migrate – Accelerate ROI
© Novell, Inc. All rights reserved.13
Automated Peer to Peer with PlateSpin Migrate
• Direct Peer to Peer• Hypervisor agnostic, migrate to ESX, Hyper-V, Xen• Hardware agnostic, migrate to bare metal• Multi-OS support• Migrate over LAN or WAN• Fully Automated Solution
etc...
© Novell, Inc. All rights reserved.14
Accelerating Adoption with PlateSpin Migrate
Challenges Manual rebuild process5-7 hrs per server (depending on application)Which workloads/applications go where?Single core onto Multi-core? CPU bottle necks, I/O contention, Memory?
Solution 100% automated Live migrations45 min. to 1 ½ hr migration timePeer to Peer across the networkUp to 20 migrations per Migrate server
Server Migration project are time consuming.
© Novell, Inc. All rights reserved.15
Migration Project Cost vs Novell ROI
200 Server RefreshMigration time:
7 hours per server avg.
200 x 7 = 1400 hours
175 days
8 man months!
x $80hr = $112,000
200 Server Refresh w/NovellMigration Time: 3 hours per server avg.200 x 3 = 600 hours3 Concurrent migrations = 200 hours
25 days 1 month!x $80hr = $16,000
License Cost approx. = $40,000 Total Project Cost = $40k + $16k
ROI/Delta = $56,000
Customer Success Case StudyEssent
© Novell, Inc. All rights reserved.17
The Customer
– The leader in the Dutch energy market
– Turnover of EUR 6.4 billion in 2006
– Annual IT budget of EUR 130 million
– 12,000 employees and 800+ IT staff
– 700 servers and growing 100 per year
– A mix of virtual and physical moves
– Moving from HP to IBM hardware
Case Study
© Novell, Inc. All rights reserved.18
Case Study
The Challenge
– Mandate to shrink 3 datacenters into one
– Wanted to standardize IT infrastructure
– Focus on minimizing risk
© Novell, Inc. All rights reserved.19
Case Study
The Solution
– Looked at VMware Converter initially – no P2P, V2P
– PlateSpin Recon to monitor the existing estate for new hardware planning and consolidation
– PlateSpin Migrate for 260 migrations (P2P and P2V) across sites
New Site
© Novell, Inc. All rights reserved.20
Case Study
• “If we hadn’t gone with PlateSpin, it would have taken a team of 25 half a year to build all the applications in the new data center, an estimated cost of over EUR 3 million.
• With PlateSpin, we were able to migrate all of our servers in one month with a team of less than eight people.
• The PlateSpin solution brings a high return of investment. In retrospect, after seeing the time and cost savings, we would have been willing to pay a lot more for the PlateSpin solution.”
Marco Spoel, Project Manager, IT Infrastructure, Essent
Helpful Hints and Best Practices
© Novell, Inc. All rights reserved.22
Solution OverviewLarge Scale Migration
Goals• Move the maximum number of workloads in the
minimum amount of time• Eliminate/Reduce testing and configuration of migrated
workloads• Ensure migrated workloads contain the most recent
data• Reduce Migration Impact on Users, Servers and
Networks
© Novell, Inc. All rights reserved.23
Solution OverviewDatacenter Move/Hardware Migration
Problems• Slow/Latent/Expensive/Busy Network connections• Small Outage Windows, weekends, 24 hours or less…• Data skew, between production workloads and migrated
workloads• Configuration and testing of migrated workloads adds
hours to each migration.• Moving To disimilar hardware archetectures, AMD to
Intel, Paxville to Dunnington XEON processors etc.• Many different operating systems within the datacenter,
that require many different migration tools
© Novell, Inc. All rights reserved.24
Solution OverviewDatacenter Move/Hardware Migration
Advantages• Optimization for WAN migrations (latent/slow/throttled)
and support for staged migrations• Live Transfer and Server Sync technology reduce
production downtime, and WAN bandwidth requirements.
• Data consistency is ensured between Source and target workloads with Server Sync.
• Automation of common post migration configuration and testing tasks
• Agnostic Operating System and Hardware Platform support
© Novell, Inc. All rights reserved.25
6 Keys to Speed
1. Install PlateSpin Migrate in Advance
2. Know your Network
3. Discover Source Workloads in Advance
4. Use Our Advanced Features (PS Analyzer)
5. Don’t Forget Domain Group Policies
6. Use Windows Services Control
© Novell, Inc. All rights reserved.26
In this diagram,
ArchitectureLocal Hardware Migration
PlateSpin MigrateServer
TargetBladeServers
SourcePhysicalServers
Building A(10.140.x.x)
PlateSpin MigrateServerTarget
RackServers Source
PhysicalServers
Building B(10.160.x.x)
PlateSpin MigrateServer
Source PhysicalServers
TargetPhysicalServers
Satellite A(10.10.120.x)
CorporateHeadquarters(10.10.x.x)
SourcePhysicalServers
TargetVirtualServers
TargetBladeServers
© Novell, Inc. All rights reserved.27
In this diagram,
ArchitectureRemote Datacenter Consolidation
PlateSpin MigrateServers
SourcePhysicalServers
Building B(10.160.x.x)
PlateSpin MigrateServer
CorporateHeadquarters(10.10.x.x)
TargetVirtualServers
TargetBladeServers
SourcePhysicalServers
© Novell, Inc. All rights reserved.28
In this diagram,
ArchitectureStaged Datacenter Migrations
TargetRackServers
SourcePhysicalServers
Satellite Site(10.160.x.x)
PlateSpin MigrateServers
CorporateHeadquarters(10.10.x.x) Target
BladeServers
PlateSpinImage
Servers
© Novell, Inc. All rights reserved.29
In this diagram,
ArchitectureStaged Datacenter Migrations
SourcePhysicalServers
Satellite Site(10.160.x.x)
PlateSpin MigrateServers
CorporateHeadquarters(10.10.x.x) Target
BladeServers
PlateSpinImage
Servers
SourcePhysicalServers
© Novell, Inc. All rights reserved.30
SecondaryDatacenter
Communication path
Primary Datacenter
Data Path
Comm
unication p
ath
Data Path
Direct Migrations
© Novell, Inc. All rights reserved.31
SecondaryDatacenter
Primary Datacenter
Image Repository Shipped to Secondary Datacenter
Incremental Replication
Data P
ath
Data Path
Staged Migrations
Thank you!
Jason Dea – [email protected]
Questions?
Unpublished Work of Novell, Inc. All Rights Reserved.This work is an unpublished work and contains confidential, proprietary, and trade secret information of Novell, Inc. Access to this work is restricted to Novell employees who have a need to know to perform tasks within the scope of their assignments. No part of this work may be practiced, performed, copied, distributed, revised, modified, translated, abridged, condensed, expanded, collected, or adapted without the prior written consent of Novell, Inc. Any use or exploitation of this work without authorization could subject the perpetrator to criminal and civil liability.
General DisclaimerThis document is not to be construed as a promise by any participating company to develop, deliver, or market a product. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. Novell, Inc. makes no representations or warranties with respect to the contents of this document, and specifically disclaims any express or implied warranties of merchantability or fitness for any particular purpose. The development, release, and timing of features or functionality described for Novell products remains at the sole discretion of Novell. Further, Novell, Inc. reserves the right to revise this document and to make changes to its content, at any time, without obligation to notify any person or entity of such revisions or changes. All Novell marks referenced in this presentation are trademarks or registered trademarks of Novell, Inc. in the United States and other countries. All third-party trademarks are the property of their respective owners.