OUTLINE:
IntroductionFirst Solar backgroundO&M costs – HistoryO&M costs – Present dayO&M costs ‐ Future
©Copyright 2016, First Solar, Inc.
Introduction• Paul Williams, Reliability engineer, CRE, BSEET electronics
• 30+ year experience in quality and reliability at high tech companies in semiconductor, computers and power generation
• Jointed First Solar in 2011 ‐ Originally hired into the O&M group• Began working on upgrading and building new capabilities for O&M’s Excel based cost model• Initiated Reliability Block Diagram (RBD) modeling of components, subsystems and array level
• Energy Availability prediction• Cost of ownership – Maintenance costs
• Transitioned into the systems reliability engineering group 2012• Continue to support the O&M Energy and cost models
• Began working with power plant engineering to optimize systems topologies • Maximizing energy availability• Minimizing the Total Cost of Ownership (TCO)
• Evangelizing and driving the concept of Levelized Cost Of Energy (LCOE)
©Copyright 2016, First Solar, Inc.
First Solar Background• One of the largest thin film solar module manufacturers and suppliers in the world
• >100M modules produced• Over 10 gigawatts installed worldwide• Over 5 gigawatts under O&M Monitoring• First Solar has developed, financed, engineered, constructed, and operating some of the world’s largest PV power plants in existence.
• Utility‐scale generation• Commercial & industrial• Community solar
©Copyright 2016, First Solar, Inc.
OPERATION &MAINTENANCE
PROJECT FINANCE
PROJECT DEVELOPMENT
ENGINEERING & PLANT OPTIMIZATION
GRID INTEGRATION& PLANT CONTROLSYSTEMS
PROCUREMENT & CONSTRUCTION ADVISEMENT
BALANCE OF SYSTEMSTECHNOLOGIES
ADVANCED PV MODULES
The Solar Value Chain
DevelopmentPartner
ConstructionPartner
PROJECT FINANCE
PROJECT DEVELOPMENT
OPERATION &MAINTENANCE
PROJECT ENGINEERINGPROCUREMENT & CONSTRUCTION
SYSTEM ENGINEERING & PLANT OPTIMIZATION
GRID INTEGRATION& PLANT CONTROLSYSTEMS
BALANCE OF SYSTEMSTECHNOLOGIES
ADVANCED PV MODULES
TRAINING AND SERVICES
Delivering The First Solar Advantage through Local Partners
AC Power Block—Configurable Power Generation Unit for developing a First Solar power plant©Copyright 2016, First Solar, Inc.
O&M Costs – History• O&M used an excel based cost model• Relied on consultants to provide failure rate information
• IEEE Goldbook• MIL‐217
• Estimated the repair times based on senior management’s “experience”• Cost information provided from suppliers spare parts lists• Only outputs were labor and parts cost estimates• Could not comprehend any failure distributions other than exponential
©Copyright 2016, First Solar, Inc.
O&M Costs – Present Day• BOS manufacturers do not use consistent methods to report predicted failure rate estimates. Information is typically MTBF based.
• Using Reliability Block Diagram modeling of Components, Subsystems and Array level
• Energy availability prediction• Cost of ownership – Maintenance Costs• Getting suppliers to provide failure data is challenging• Using failure distribution data based on our own field experience• Using Accelerated Life Test (ALT) data for FS developed products
• Working with power plant engineering to optimize systems topologies • Maximizing energy availability• Minimizing the TCO
• Levelized Cost Of Energy (LCOE) starting to appear in Marketing and Sales literature.
©Copyright 2016, First Solar, Inc.
Field failure – Transformer Oil Leaks
Leak failure distributions for 3 transformer suppliers
Leaking was not included in early cost models –Now it’s rate and repair costs are included
Field data drove supplier selection / preference
©Copyright 2016, First Solar, Inc.
Field Data ‐ DC Health Analysis – Failure Breakdown
Note: There are NO power degradation failures
Results from a large >100MW power plant during a regular DC health sweep
Recognition that Module Reliability (degradation) is not all there is to building a solar plant for optimized costs.
©Copyright 2016, First Solar, Inc.
O&M Costs ‐ Future• While important, module degradation is not all there is to building a solar plant for optimized costs. BOS components play a major role as well.
• LCOE and Total Cost of Ownership (TCO) becomes the driving quality metrics on which power plants are evaluated
• FS Initiating an IEC work item proposal to standardize cost modeling inputs for improved prediction accuracy
• Standard defines a complete list of deliverables for equipment suppliers to provide in order to be able to predict and trend the cost of ownership and LCOE models. Based on failure mode and distribution parameters rather than MTBF estimates.
©Copyright 2016, First Solar, Inc.
LCOE
LCOE is the lifecycle cost for investment in an electricity generation power plant.Utility companies and financial institutions value projects on the basis of the lifecycle cost, generally through a measure known as Levelized Cost of Electricity (LCOE)
Development $Construction $O&M Costs $Profit $Taxes $Etc. (cash flow) $
= LCOE ($/kWh)
Understanding how LCOE is impacted by changes in the system allows First Solar to optimize plant designs (and System Solutions) that reduce LCOE most effectively
• Energy yield increase has the highest single impact on LCOE
• $/watt is not the driving metric for investment in utility scale PV projects and PPA’s ($/kWh)
=Net energy to be sold over the life of the investment
kWh
©Copyright 2016, First Solar, Inc.
First Solar AC Power Block
Configurable PV Power Generation Unit for developing fully integrated utility‐scale power plants with the lowest LCOE • First Solar System and Services• First Solar Energy Prediction Model
• Energy Performance Guarantee
©Copyright 2016, First Solar, Inc.