June 7, 2022 Vermelding onderdeel organisatie 1 Chapter 17: Review ct5308 Breakwaters and Closure Dams H.J. Verhagen Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering Emergency closure at Westkapelle 1944 (photo: National Geographic

17: Review

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: 17: Review

April 10, 2023

Vermelding onderdeel organisatie

1

Chapter 17: Review

ct5308 Breakwaters and Closure Dams

H.J. Verhagen

Faculty of Civil Engineering and GeosciencesSection Hydraulic Engineering

Emergency closure at Westkapelle1944 (photo: National Geographic

Page 2: 17: Review

April 10, 2023 2

advantages and disadvantagesrubble mound monolithic • simple construction

• withstand unequal settlement• large ratio between initial

damage and collapse• many guidelines available• dependence on the availability

of adequate quarry• large quantity of material

required in deep water• large space required• difficult to use as quay wall

• short construction time on location

• can function as quay wall• economical use of material in

deeper water• sensitivity to poor foundation

conditions• uncertainty about wave loads in

breaking waves• complete and sudden failure

when overloaded• reflection against vertical wall• limited support for the designer

from guidelines and literature

Page 3: 17: Review

April 10, 2023 3

Quarry stone or concrete ??

Page 4: 17: Review

April 10, 2023 4

which design formula ???

3

33 cos sinrN gH

W

3

3 cotr

D

g HW

K

0.2

0.18 0.5

50

0.2

0.13

50

6.2 (plunging breakers)

1.0 cot (surging breakers)

sc

n

Psc

n

H SP

d N

H SP

d N

Page 5: 17: Review

April 10, 2023 5

SLS and ULS

Page 6: 17: Review

April 10, 2023 6

Closure dams: special conditions

• subdivision of the basin in order to reduce storage area

• subdivision because of two entrances• a closure with two or more entrances

Page 7: 17: Review

April 10, 2023 7

two ways to reduce the area of a basin

Page 8: 17: Review

April 10, 2023 8

a basin with two entrances

Page 9: 17: Review

April 10, 2023 9

an estuary with two channels

Page 10: 17: Review

April 10, 2023 10

The gap is not (yet) in equilibrium• stabilise the bottom of

the gap as soon as possible

• avoid erosion of gullies in the storage area

Page 11: 17: Review

April 10, 2023 11

closure dike breach Ouderkerk aan den IJssel (1953)

Page 12: 17: Review

April 10, 2023 12

closure alignments