86
Intergraph Solutions for Rail & Metro Delivering Safer & More Efficient Networks Paul A. Archer Projects Director

12.20 paul archer, atheeb intergraph

Embed Size (px)

DESCRIPTION

GIS

Citation preview

Page 1: 12.20 paul archer, atheeb intergraph

Intergraph Solutions for Rail & Metro

Delivering Safer & More Efficient Networks

Paul A. Archer Projects Director

Page 2: 12.20 paul archer, atheeb intergraph

Presentation Highlights:

1) Customer References & Capabilities

2) Asset Management

3) Safety & Security

4) Land & Property Management

5) Environmental Risk Management

6) Project Monitoring & Awareness

7) Corporate Overview & Wrap-up

Page 3: 12.20 paul archer, atheeb intergraph

Rail Challenges

Having access to relevant,

accurate, and up-to-date

information is critical, but may be

challenging if data is widely

dispersed in disparate systems.

This blocks internal members from

getting timely access to all the

information they need to efficiently

complete their work.

9/16/2014 © 2014 Intergraph Corporation 3

Page 4: 12.20 paul archer, atheeb intergraph

What Intergraph Delivers

9/16/2014 © 2014 Intergraph Corporation 4

Intergraph’s solutions are

fundamental to overcoming

data integration barriers.

We deliver a common and

consistent information

resource that can be applied

to core operational requirements.

Page 5: 12.20 paul archer, atheeb intergraph

A Wealth of Experience & Capabilities

Business

System

Integration

SDI & INSPIRE

Analytics &

Dashboards

Physical

Security

Operational

Efficiency

Corridor

Planning

Building

Management

Photogrammetry

& Map

Production

LiDAR/

Point Clouds

Infrastructure

Management

Electrification,

Comms,

Drainage

Environment Environmental

Risks

Land & Property

Management

Inspection &

Survey

Incident

Management

Demand

Analysis

Infrastructure

Monitoring

9/16/2014 © 2014 Intergraph Corporation 5

Page 6: 12.20 paul archer, atheeb intergraph

Some of Intergraph’s Rail & Transit Customers

9/16/2014 © 2014 Intergraph Corporation 6

Page 7: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 7

London Underground, UK

Intergraph helps

London Underground

maintain and improve

assets used by one

billion passengers

every year.

Page 8: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 8

AlpTransit – Gotthard Base Tunnel

Constructed with

with the aid of

Leica Geosystems,

the world’s longest

rail tunnel will use

Intergraph for security

and incident response.

Image: AlpTransit Gotthard Ltd

Page 9: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 9

New York Metropolitan Transportation Authority, USA

At New York MTA,

Intergraph’s security

platform helps

protect two-thirds of

U.S. rail passengers.

Page 10: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 10

Deutsche Bahn AG, Germany

Deutsche Bahn

manages 60,000

incidents a year on

Europe’s largest and

most traveled

network.

Image- Sebastian Terfloth

Page 11: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 11

LCR London-Channel Tunnel High-Speed Rail Link

Image- LCR

Intergraph helps LCR

manage its processes

for land acquisition,

disposal, and title for

an entirely new high-

speed rail corridor

between central

London and the

Channel Tunnel.

Page 12: 12.20 paul archer, atheeb intergraph

SBB – Swiss Rail

9/16/2014 © 2014 Intergraph Corporation 12

Reliable assets help

Swiss Rail (SBB) run

more trains per

route, per day than

any other national rail

network.

Page 13: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 13

RFI – Italian Rail

Intergraph helps

Italian Rail (RFI)

document, manage,

operate, and

enhance Italy’s

national rail network.

Page 14: 12.20 paul archer, atheeb intergraph

Asset Management

Page 15: 12.20 paul archer, atheeb intergraph

243 km of Track

509 Switches

4728 Power masts

550 Signals

210 CCTV Cameras

Ticket machines

805 Stops

Lighting, barriers,...

Plus.....

Level crossings

1500 underground rooms

430 km bus network

Bus shelters

Etc. Etc....

Page 16: 12.20 paul archer, atheeb intergraph

A Whole-Life Approach

Whole-Life

Asset Management

Systematic and coordinated

activities and practices through

which an organization optimally

manages its assets and their

associated performance, risks,

and expenditures over their life

cycle for the purpose of

delivering its business

objectives.

9/16/2014 © 2014 Intergraph Corporation 16

Source: Publicly Available Specification (PAS) 55-1

Page 17: 12.20 paul archer, atheeb intergraph

Asset Management: Map-based Network

Inventory

Page 18: 12.20 paul archer, atheeb intergraph

Intelligent, Rules-based Design

9/16/2014 © 2014 Intergraph Corporation 18

Page 19: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 19

Display Key Business Information

Page 20: 12.20 paul archer, atheeb intergraph

Asset Management: Enterprise Data

Integration

Reference 2014 paper, “Rail Technical Strategy Europe” , the removal

of physical and procedural bottlenecks maximizes system capacity

and minimizes cost of system operation and maintenance.

Page 21: 12.20 paul archer, atheeb intergraph

Making Enterprise Data Work for You

What can you see in the text?

• How do rail conditions vary?

• What are the sleepers’ condition?

• How do you prioritize tasks?

• How do you coordinate works?

• Where should you invest?

9/16/2014 © 2014 Intergraph Corporation 21

Page 22: 12.20 paul archer, atheeb intergraph

Integrated Analysis: Greater Insight, Efficiency, & Safety

Faults and Works

2007

2008

2009

2010

Faults

Aggregated costs

by track section

Low

Med

High

9/16/2014 © 2014 Intergraph Corporation 22

Page 23: 12.20 paul archer, atheeb intergraph

Asset Management: Enhanced Enterprise

Business Systems and Processes

Integrating information within a Location context.

Location is an essential element for rail management and operation.

Page 24: 12.20 paul archer, atheeb intergraph

Intergraph Linear Referencing Engine

Data

Set #1

Ref

Model

Linear

Datum

Individual

Datasets

Linear Reference

Model Used

Network’s Map or

Diagrammatic

Representation

Intergraph

Dataset

e.g. SAP, TRV, etc.

Business data can now

be rendered dynamically

as a map using the reference

geometry.

9/16/2014 © 2014 Intergraph Corporation 24

Net

Model

Page 25: 12.20 paul archer, atheeb intergraph

Visualizing Works & Asset Management System Data

Maximo work orders

rendered dynamically on a

linear tack diagram

9/16/2014 © 2014 Intergraph Corporation 25

Page 26: 12.20 paul archer, atheeb intergraph

Visualizing Diagnostic Train Data

Wheel Spin :

Adhesion :

1

2

3

Diagnostic train adhesion

data rendered dynamically

on a network diagram

9/16/2014 © 2014 Intergraph Corporation 26

Page 27: 12.20 paul archer, atheeb intergraph

Classic ‘Harry Bec’

Underground Map

Swap Network Representations to Match Use

Route

Diagram

Conventional

True-scale Map

Linear

Diagram

9/16/2014 © 2014 Intergraph Corporation 27

Page 28: 12.20 paul archer, atheeb intergraph

Classic ‘Harry Bec’

Underground Map

Swap Network Representations to Match Use

Route

Diagram

Conventional

True-scale Map

Linear

Diagram

9/16/2014 © 2014 Intergraph Corporation 28

Page 29: 12.20 paul archer, atheeb intergraph

Swap Network Representations to Match Use

9/16/2014 © 2014 Intergraph Corporation 29

Classic ‘Harry Bec’

Underground Map

Swap Network Representations to Match Use

Route

Diagram

Conventional

True-scale Map

Linear

Diagram

Page 30: 12.20 paul archer, atheeb intergraph

Swap Network Representations to Match Use

9/16/2014 © 2014 Intergraph Corporation 30

Swap Network Representations to Match Use

Classic ‘Harry Bec’

Underground Map

Swap Network Representations to Match Use

Route

Diagram

Conventional

True-scale Map

Linear

Diagram

Page 31: 12.20 paul archer, atheeb intergraph

9/16/2014 © 2014 Intergraph Corporation 31

Swap Network Representations to Match Use Swap Network Representations to Match Use

Classic ‘Harry Bec’

Underground Map

Swap Network Representations to Match Use

Route

Diagram

Conventional

True-scale Map

Linear

Diagram

Page 32: 12.20 paul archer, atheeb intergraph

Simple Data Exchange with Third Parties

16/09/2014 ©2014 Intergraph Corporation 32

Page 33: 12.20 paul archer, atheeb intergraph

Asset Management: Asset Inspection

& Survey

Page 34: 12.20 paul archer, atheeb intergraph

Asset Inspection & Survey

Capturing

Real-world Change

A broad set of interfaces and software

platforms

More current, accurate, and complete

records

9/16/2014 © 2014 Intergraph Corporation 34

Page 35: 12.20 paul archer, atheeb intergraph

Automated Survey: imajing

9/16/2014 © 2014 Intergraph Corporation 35

Page 36: 12.20 paul archer, atheeb intergraph

Safety & Security

Page 37: 12.20 paul archer, atheeb intergraph

Access

Control

Biometrics

Phone

& Radio

Integration

Personnel

and Assets

Video

Systems

Radar

Structural

Sensors

Alarm

Systems

Video

Analytics

GIS Maps

& Imagery

Emergency

Plans &

SOPs

Intergraph Security & Incident Response

9/16/2014 © 2014 Intergraph Corporation 37

Incident Response & Security

Page 38: 12.20 paul archer, atheeb intergraph

AlpTransit – Gotthard Base Tunnel

Protecting the

World’s Longest

Rail Tunnel

Continual monitoring of trains and the

tunnel environment

Operators alerted to out-of-state

conditions

Automated SOPs accelerate response

actions

38 9/16/2014 © 2014 Intergraph Corporation

Page 39: 12.20 paul archer, atheeb intergraph

New York MTA Operational Workflow – Security

39

Securing North

America’s Largest

Transportation

Network

2.6 billion passengers annually

Two-thirds of USA’s rail passengers

Intergraph integrated security

framework

9/16/2014 © 2014 Intergraph Corporation

Page 40: 12.20 paul archer, atheeb intergraph

British Transport Police

Delivering A Secure,

Multi-Agency

Information Portal

Rapid access to assets

Authorized users across many

organizations

Sharing mapping, imagery, CAD

designs, video, and more

40 9/16/2014 © 2014 Intergraph Corporation

Page 41: 12.20 paul archer, atheeb intergraph

Edmonton Transit System

Canada’s First

Integrated Operational

Transport Security

System

Situational awareness and dispatch

Integrated with AVLS, CCTV, and

alarm systems

41 9/16/2014 © 2014 Intergraph Corporation

Page 42: 12.20 paul archer, atheeb intergraph

Incident Response Case Study

Efficient Incident

Management

50 50 46 4

Identify &

Mobilize Resources Address Issues Restore Service

50 50 3 4 105 Minutes

150 Minutes

9/16/2014 © 2014 Intergraph Corporation 42

Save lives

Contain infrastructure and environmental damage

Reinstate service faster

Minimize disruption

Page 43: 12.20 paul archer, atheeb intergraph

Land & Property Management

Page 44: 12.20 paul archer, atheeb intergraph

Italian Railways Cadastre

Fully Managed

Property Asset

Management

A comprehensive and integrated

database of all aspects of real estate

assets

A reporting tool that also provides

functional monitoring of operational

processes

Desktop and web interfaces

44 9/16/2014 ©2014 Intergraph Corporation © 2014 Intergraph Corporation

Page 45: 12.20 paul archer, atheeb intergraph

Channel Tunnel Rail Link

“Many land information

systems can provide a

static record of holdings…

But ours manages the

entire business process

in a dynamic way.” LCR

UK’s Largest Compulsory Land

Purchase Project in Recent Years

Safeguards 28.5 km2 of land

Final Scheme : 6.4 km2 area

273 km perimeter

Interaction with 20 jurisdictions and

planning authorities

45 9/16/2014 ©2014 Intergraph Corporation

Page 46: 12.20 paul archer, atheeb intergraph

Environmental Risk Management: Environmental Hazard Mapping & Analysis

Page 47: 12.20 paul archer, atheeb intergraph

Mapping, Monitoring, Analysis, and Incident Response

Managing Environmental Risk

47 9/16/2014 © 2014 Intergraph Corporation

Page 48: 12.20 paul archer, atheeb intergraph

Monitoring with Integrated Response

The Great Ancona

Landslide in Italy

Consolidation was not possible

Combined monitoring and early

warning with Leica Sensor Network

and Intergraph Security Platform

Protects urban areas, main rail

corridor, and national highway

48 9/16/2014 ©2014 Intergraph Corporation

Page 49: 12.20 paul archer, atheeb intergraph

Environmental Hazard Mapping & Analysis

Risk level map

Network

Risk profile

62 9/16/2014 ©2014 Intergraph Corporation

Page 50: 12.20 paul archer, atheeb intergraph

Risk level map

Network

Risk profile

Environmental Hazard Mapping & Analysis

GeoMedia® Smart Client Web interface, showing

map data and example of a form to search and filter

information

Easy-to-use forms enable users to

enter data and associated multimedia

content to feed the risk analysis

50 9/16/2014 ©2014 Intergraph Corporation

Page 51: 12.20 paul archer, atheeb intergraph

Environmental Hazard Mapping & Analysis – SBB

51 9/16/2014 ©2014 Intergraph Corporation

Page 52: 12.20 paul archer, atheeb intergraph

Extreme Weather

Meteorological

Monitoring, Analyzing,

& Alerts

Monitor forecasts to modify operations

Analyze historic data to adapt design

Image: NY MTA. Boat on tracks near Metro-North's Ossining station

52 9/16/2014 ©2014 Intergraph Corporation

Page 53: 12.20 paul archer, atheeb intergraph

Precision 3D Monitoring

Safer Operations with

Earlier Displacement &

Failure Warnings

Monitors rail construction and

tunnelling, third-party construction,

and major assets like tunnels and

bridges

Reduces uncertainty

Extends asset life

Image: AlpTransit Gotthard Ltd

53 9/16/2014 ©2014 Intergraph Corporation

Page 54: 12.20 paul archer, atheeb intergraph

Environmental Risk Management: Noise Modelling

Page 55: 12.20 paul archer, atheeb intergraph

Noise Modelling

Modelling & Mapping

Environmental Noise

Identify areas of heightened noise

Identify mitigation measures in

sensitive areas

Reduce complaints

Plan works

Comply with environmental regulation

55 9/16/2014 ©2014 Intergraph Corporation

Page 56: 12.20 paul archer, atheeb intergraph

Project Monitoring & Awareness

Page 57: 12.20 paul archer, atheeb intergraph

9/16/2014 ©2012 Intergraph Corporation 57

Page 58: 12.20 paul archer, atheeb intergraph

Project Monitoring & Updates

Some considerations:

• Latest Work Status

• GPS enabled Mobile Assets

• Public Awareness

• Financial Controls

• Project Status

• Live Video of Work Sites

• Map based

Page 59: 12.20 paul archer, atheeb intergraph

Rail Construction Project Plans

Eg. Primavera of Microsoft Project Based Information

Page 60: 12.20 paul archer, atheeb intergraph

Financial Information

Costs & Revenues

What?

When?

Who?

Where?

Image: NY MTA. Boat on tracks near Metro-North's Ossining station

60 9/16/2014 ©2014 Intergraph Corporation

Page 61: 12.20 paul archer, atheeb intergraph

Actual Work Being Done

Page 62: 12.20 paul archer, atheeb intergraph

Real Time & Archival Video Monitoring

Image: NY MTA. Boat on tracks near Metro-North's Ossining station

62 9/16/2014 ©2014 Intergraph Corporation

Page 63: 12.20 paul archer, atheeb intergraph

Spatially Integrated Information

Geographically Visualize Key Information

Page 64: 12.20 paul archer, atheeb intergraph

Public Participation & Engagement

Page 65: 12.20 paul archer, atheeb intergraph

Business

Data

Track Monitoring

Environmental /

Seismic

Construction

65

Smart Project Monitoring

Geo-Data

Plans/Status Video

Other

Considerations

Page 66: 12.20 paul archer, atheeb intergraph

SMART RAIL

BETTER

governance SAFE &

efficient

GO

green INTEGRATED &

responsive

Page 67: 12.20 paul archer, atheeb intergraph

Company Overview Hexagon / Intergraph / Atheeb Intergraph

Page 68: 12.20 paul archer, atheeb intergraph

Organization

Page 69: 12.20 paul archer, atheeb intergraph

Hexagon in Brief

• Head offices in Stockholm and London

• Turnover of close to 2.4 billion EUR

• 14 000 employees in over 40 countries

• More than 3 000 employees engaged in R&D

• More than 2 700 active patents in patent portfolio

• Share listed on NASDAQ OMX Stockholm

11% Of net sales

invested in R&D

22% Of employees engaged

in R&D

2 700 Patents & 200 patent

applications/year

13 900 Employees in more

than 40 countries

Page 70: 12.20 paul archer, atheeb intergraph

Who is Hexagon?

70

South America

2%

North America

31%

Western Europe

36%

EMEA excluded

Western Europe

6%

China

14%

Asia-Pacific

11%

Page 71: 12.20 paul archer, atheeb intergraph

Group

Page 72: 12.20 paul archer, atheeb intergraph

Group

Page 73: 12.20 paul archer, atheeb intergraph

Security, Government & Infrastructure

Defense

Intelligence

Utilities

Telecom

Public

Safety

Security

Transport

Gover-

nment

Geospatially-enabled security, military and infrastructure

software & services

SG&I

Page 74: 12.20 paul archer, atheeb intergraph

Atheeb Intergraph Saudi Company (AISC) is the

exclusive Distributor in the Kingdom of Saudi

Arabia for Intergraph.

Atheeb Intergraph was established in 2001 and is a

member of the Atheeb Group with Headquarters

in Riyadh, Kingdom of Saudi Arabia.

Page 75: 12.20 paul archer, atheeb intergraph

Questions?

Page 76: 12.20 paul archer, atheeb intergraph
Page 77: 12.20 paul archer, atheeb intergraph
Page 78: 12.20 paul archer, atheeb intergraph
Page 79: 12.20 paul archer, atheeb intergraph
Page 80: 12.20 paul archer, atheeb intergraph
Page 81: 12.20 paul archer, atheeb intergraph
Page 82: 12.20 paul archer, atheeb intergraph
Page 83: 12.20 paul archer, atheeb intergraph
Page 84: 12.20 paul archer, atheeb intergraph
Page 85: 12.20 paul archer, atheeb intergraph
Page 86: 12.20 paul archer, atheeb intergraph

Questions?