STRUCTURAL HEALTH MONITO PAPER STRUCTURAL HEALTH MONITO HIGH SPEED RAILWAY VIADU 1 DIRECTORATE FOR ARCHITECTURE, STRUCTURES AND INSTRUMENTATION DIRECTORATE GENERAL FOR TRANSPORT INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN SHMII-5. International Conference on SHM of Intelligent 1 CONSULTING AND ENGINEERING Cancún, 14th December 2011 ORING OF JUSTO CARRETERO PÉREZ ORING OF UCTS JUSTO CARRETERO PÉREZ CIVIL ENGINEER HEAD OF INSTRUMENTATION AND HEAD OF INSTRUMENTATION AND TESTS DIVISION STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT t Infrastucture

111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

Embed Size (px)

DESCRIPTION

Monitorización Dinámica de viaductos Singulares de Alta Velocidad, Arroyo del Valle y Arroyo de las Piedras.

Citation preview

Page 1: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

STRUCTURAL HEALTH MONITO

PAPERSTRUCTURAL HEALTH MONITO

HIGH SPEED RAILWAY VIADU

1

DIRECTORATE FOR ARCHITECTURE, STRUCTURES AND INSTRUMENTATION

DIRECTORATE GENERAL FOR TRANSPORT

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

1 CONSULTING AND ENGINEERING

Cancún, 14th December 2011

ORING OF

JUSTO CARRETERO PÉREZ

ORING OF UCTS

JUSTO CARRETERO PÉREZ

CIVIL ENGINEERHEAD OF INSTRUMENTATION ANDHEAD OF INSTRUMENTATION AND

TESTS DIVISION

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 2: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

INDEX

1. INTRODUCTION.2. DEFINITION OF MONITOR2. DEFINITION OF MONITOR3. DEVELOPED ACTIVITIES4 MAGNITUDES TO BE ME4. MAGNITUDES TO BE ME5. MONITORING CHALLENG

SPEED VIADUCTS:- ARROYO DE LAS PIEDR- ARROYO DEL VALLE (L

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

2

RINGRING.S.

ASURED AND FREQUENCYASURED AND FREQUENCYGE – OUTSTANDING HIGH

RAS (HIGHEST)LONGEST)

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 3: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

CURRENT STATE OF RAILWAY V

1. INTRODUCTION

- LOADS THAT ARE FAVORA

MAXIMUM SPEED (IMPACT REMAXIMUM SPEED (IMPACT - RE

- NEW DESIGN CHALLENGE

HEIGHTS FOR LARGER RAILW

STRAIN GAUGES, ETC).

- MAINTENANCE PERSPECTIVE

SUITABILITY OF DESIGN LOADSSUITABILITY OF DESIGN LOADS

THEIR INFLUENCE ON DURA

NECESSARY TO CHECK THE TINECESSARY TO CHECK THE TIDYNAMIC STRENGTH CHARACT

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

3

VIADUCTS IN HIGH-SPEED LINES:

ABLE FOR DYNAMIC EFFECTS AT

ESONANCE FATIGUE)ESONANCE - FATIGUE).

ES, WITH EXTENDED SPANS AND

WAY VIADUCTS (EXCESSIVE MOTION,

E. IT IS NECESSARY TO CHECK THE

S AGAINST FATIGUE PROBLEMS ANDS AGAINST FATIGUE PROBLEMS AND

ABILITY AND AGEING. IT’S ALSO

IME EVOLUTION OF STATIC AND/ORIME EVOLUTION OF STATIC AND/OR

TERISTICS.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 4: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

1 INTRODUCTION (CONTINUED)1. INTRODUCTION (CONTINUED)

(OUTSTANDING ITEMS IN VIADU(

- EXISTENCE OF NATIONAL

STANDARDS THAT ARENSTANDARDS THAT AREN

EXPERIMENTAL TESTS.

- REQUEST TO COMPARE ‘

‘PRACTISE AND REAL BEHAVIO

ENHANCE UNDERSTANDING

DESIGNS

- IT IS GENERALLY CONSIDERE

THE REAL BEHAVIOUR OF STOU O S

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

4

UCTS ON HIGH-SPEED LINES))

OR INTERNATIONAL COMPULSORY

N’T SUPPORTED BY ENOUGHN T SUPPORTED BY ENOUGH

‘THEORY AND REGULATION’ WITH

OUR’, THE RESULT OF WHICH WOULD

AND OPTIMISATION OF FUTURE

ED TO BE “NECESSARY” TO KNOW

TRUCTURESUC U S

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 5: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

1 INTRODUCTION (CONTINUED)1. INTRODUCTION (CONTINUED)

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

5

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 6: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

1 INTRODUCTION (CONTINUED)1. INTRODUCTION (CONTINUED)

WHERE IS THAT NEED LEADING

- IMPLEMENTATION OF A SYS

AND/OR FUNCTIONAL CHARAC

BEHAVIOUR OF STRUCTURES.OU O S UC U S

- MEASUREMENT OF RELATEDMEASUREMENT OF RELATED

THEIR EVOLUTION THROUGH T

- NEW IDEA OF “MONITORINGFIELD TO RAILWAY AUSCULTFIELD TO RAILWAY AUSCULT

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

6

G US?

STEM SURVEILLING ALL STRENGTH

CTERISTICS INVOLVED IN THE REAL

D VARIABLES IN ORDER TO MONITORD VARIABLES IN ORDER TO MONITOR

TIME

G” VIADUCTS AS AN ADDITIONALTATIONTATION

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 7: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

1 INTRODUCTION (CONTINUED)1. INTRODUCTION (CONTINUED)

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

7

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 8: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

2 DEFINITION OF MONITORI2. DEFINITION OF MONITORI

“MONITORING” IMPLIES (Con

-MEASURING PHYSICAL MA

MONITORING IMPLIES (Con

-USING SUITABLE ELECTRON-CONTINUOUS RECORDI(COMPATIBLE WITH SPECIF

- -VISUALISATION, SURVEILL-ACTION PROTOCOL

INITIALLY IT IS ADVISABLETHOROUGHLY IN THE OFFIC

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

8

INGING

ntinuous auscultation):

AGNITUDES

ntinuous auscultation):

NIC DEVICESNG IN TERMS OF TIMEFIC TEST CAMPAIGNS -PC-).

LANCE, … ANALYSIS.

TO: OBSERVE, RECORD, ANALYSECE AND “THEN” DECIDE.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 9: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

22. DEFINITION OF MONITORING (CON

“ACTIVE CONTROL” IMPLIE

- GO BEYOND MONITORING

ACTIVE CONTROL IMPLIE

- REAL TIME ANALYSIS- TAKE ACTION AND EVEN I- PREVIOUS KNOWLEDGE

“SAFETY CONTROL” IMPLIES“SAFETY CONTROL” IMPLIES

- A DIFFICULT INTERMEDIA- MINIMUM KNOWLEDGE T- A COMPULSORY PROTOCA COMPULSORY PROTOC

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

9

NTINUED)

ES:ES:

INFLUENCE RESULTS

SS:

ATE CASE.

TO SET LIMITSCOL ON ALARM TREATMENT.COL ON ALARM TREATMENT.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 10: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

2. DEFINITION OF MONITORING (CON

“ESSENTIAL QUESTIONS FORMONITORING”:MONITORING :

- DURATION OF (BASIC) MO- WHERE AND WHAT TO ME- WITH WHICH FREQUENCY- WHAT DO WE WANT TO SA- HOW DO WE WANT TO SE

THE ANSWER TO THESE QUE

TYPE OF SENSOR AND COAND CONTROL SOFTWARAND COMMUNICATION SYS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

10

NTINUED)

R

ONITORINGEASURE?Y (Static/Dynamic)?AVE (DATA VOLUME)?

EE RESULTS?

ESTIONS INDICATES HOW:

NNECTION, TYPE OF RECORDINGE, LOCAL NETWORK TOPOLOGYSTEM, ETC.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 11: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

2. DEFINITION OF MONITORING (CON

“KEY POINTS”:

(

KEY POINTS :

TALKING TO THE RIGH- TALKING TO THE RIGHKNOWS WHAT WE AR

WRITING THE IN- WRITING THE IN(SCHEME, LOCATION,SENSORS )SENSORS, ...)- DEFINING ACTION PRLIMITS ARE EXCEEDELIMITS ARE EXCEEDE- AVOID INSTRUMENTANALYSED.

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

11

NTINUED))

HT SPEAKER (“THE ONE WHOHT SPEAKER (“THE ONE WHOE AFTER / THE THEORIST”.)NSTRUMENTATION PROJECTNSTRUMENTATION PROJECTMAGNITUDES, STATIC/DYNAMIC

ROTOCOLS IN CASE THE SETDD:

TING MORE THAN CAN BE

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 12: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

22. DEFINITION OF MONITORING (CON

NOWADAYS MONITORING REQUIRENOWADAYS, MONITORING REQUIRE

ELECTRONIC TRANSDUCERS IN T

THAT THROUGH THE USE OFTHAT THROUGH THE USE OF

MAGNITUDES CAPTURED WILL BE

THAT ARE AUTOMATICALLY STORETHAT ARE AUTOMATICALLY STORE

ONCE THE INSTRUMENTATION HAONCE THE INSTRUMENTATION HA

AND STORED IN A CENTRAL COM

AND CONTROLLED WITH THE RELAND CONTROLLED WITH THE REL

TO THE OFFICE THROUGH THE A

(TELEPHONE FIBER OPTICS SATE(TELEPHONE, FIBER OPTICS, SATE

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

12

NTINUED)

ES THE INSTALLATION OF DETECTORS ORES THE INSTALLATION OF DETECTORS OR

HE STRUCTURE’S TARGETED POINTS, SO

SUITABLE EQUIPMENT THE PHYSICALSUITABLE EQUIPMENT, THE PHYSICAL

TRANSFORMED INTO ELECTRIC SIGNALS

ED AND CONDITIONEDED AND CONDITIONED.

AS BEEN DONE, SIGNALS ARE DIGITALISEDAS BEEN DONE, SIGNALS ARE DIGITALISED

MPUTER, WHERE THEY ARE PRETREATED

LEVANT SOFTWARE FINALLY DATA IS SENTLEVANT SOFTWARE. FINALLY, DATA IS SENT

APPROPRIATE COMMUNICATIONS SYSTEM

ELLITE)ELLITE).

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 13: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

2 DEFINITION OF MONITORING (CON2. DEFINITION OF MONITORING (CON

Scheme of Distribution

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

13

NTINUED)NTINUED)

n Network in Arroyo de las Piedras Viaduct

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 14: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

3 DEVELOPED ACTIVITIES3. DEVELOPED ACTIVITIES

VIADUCT MVIADUCT M

Preliminary InitialStudy Initial

Inspection M

Instrumentation Calibration and operation testsp

REPORT RELEASE

DATABASE APRESENTA

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

14

MONITORINGMONITORING

MONITORING Project

DATA ANALYSIS

DATA RECORD ANDAND

TRANSMISSION

RESULTSAND

CONCLUSIONSAND WEB TATION

CONCLUSIONS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 15: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

4. MAGNITUDES TO BE MEASUR

AFTER CARRYING OUT THE DETAILED

FREQUENCY

THE PRIOR VISIT TO ASSESS THE DIF

(AUXILIARY ELEMENTS: ACCE(

CHARACTERISTIC MAGNITUDES TO

QUANTITY, QUALITY AND FREQUENCQ , Q Q

DEVICES IS STUDIED (LOCAL NETW

SYSTEM USED FOR DATA TRANSMISSYSTEM USED FOR DATA TRANSMIS

WILL BE INCLUDED IN THE MONITORIN

EACH MAGNITUDE MUST BE PERFE

MEASUREMENT RANGE, ACCURACY

SENSORS WILL DEPEND ON THIS

RESPONSE, AND THE DATA SAMPLE F

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

15

RED AND

D ANALYSIS OF EACH VIADUCT, AS WELL AS

FFERENT INSTRUMENTATION POSSIBILITIES

SSES, CRANES, CLIMBERS); THE, , );

BE MEASURED ARE SET IN TERMS OF

CY. THE CONNECTION METHOD BETWEEN

WORK) AND ALSO THE COMMUNICATION

SION (EXTERNAL NETWORK). ALL OF THISSION (EXTERNAL NETWORK). ALL OF THIS

NG PROJECT.

ECTLY DEFINED IN TERMS OF LOCATION,

Y AND MAIN FREQUENCY. THE CHOICE OF

S, THE ANALYSIS OF ITS FREQUENCY

FREQUENCY.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 16: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

4. MAGNITUDES TO BE MEASURED AND

THE FREQUENCY RESPONSE CA

ACCURACY TOGETHER, BECAUS

THE MEASUREMENTS WON’T BE

FOR ALREADY BUILT RMAGNITUDES TO BE MEASU

MOTION IN FOUNDATIONS AND P MOTION IN FOUNDATIONS AND P

BOTH PERPENDICULAR AXES W

MEASURING TILT WE CAN CALCU

OF MEASUREMENT CAN BE CON

TERM AND DURING TRAIN CIRCUL

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

16

D FREQUENCY (continued)

AN BE AS IMPORTANT AS RANGE AND

SE IF THE RESPONSE ISN’T SUFFICIENT

ACCURATE.

RAILWAY VIADUCTS, THE MAINURED ARE THE FOLLOWING:

PIER HEADS MEASURING TILT AGAINSTPIER HEADS. MEASURING TILT AGAINST

WITHIN THE HORIZONTAL PLANE. BY

ULATE ANY DISPLACEMENTS. THIS KIND

NTINUOUSLY RECORDED ON THE LONG

LATION (IF THE SENSOR ALLOWS IT).

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 17: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

44. MAGNITUDES TO BE MEASURED AND F

RELATIVE DISPLACEMENTS PIER /

o MEASURING DIRECT RELATIVE DIS

THE PIER HEADS OR ABUTMENTS.

o MEASURING DISPLACEMENTS BEo SU G S C S

BETWEEN DECK AND ABUTMENTS

THESE MEASUREMENTS ALLOW U

STRUCTURE’S GLOBAL DISPLASTRUCTURE S GLOBAL DISPLA

CONTINUOUS DISCREET DYNAMI

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

17

FREQUENCY (continued)

ABUTMENT – DECK.

SPLACEMENTS BETWEEN THE DECK AND

ETWEEN DECK JOINTS, AND IN JOINTSC JO S, JO S

S.

US TO HAVE A GOOD CONTROL OVER THE

ACEMENTS AND ALSO TO KEEP AACEMENTS AND ALSO TO KEEP A

IC RECORD.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 18: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

4

ACCELERATIONS CAUSED BY CE

4. MAGNITUDES TO BE MEASURED AND F

ACCELERATIONS CAUSED BY CE

VERTICAL ACCELERATION: VERTICAL ACCELERATION:

THE QUINTESSENTIAL DYNAMIC M

TO CARRY OUT A SPECTRAL STTO CARRY OUT A SPECTRAL ST

TRAINS. THE RESULTS OF THIS ST

ABSOLUTE VALUES FOR ACCELERABSOLUTE VALUES FOR ACCELER

DECK MICROSTRAINS (STRESS):

STRAIN GAUGES ARE MAINLY INST

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

18

NTRIFUGAL FORCE AND BREAKING

FREQUENCY (continued)

NTRIFUGAL FORCE AND BREAKING.

MEASUREMENTS THAT MAKE IT POSSIBLE

TUDY ON THE VIBRATIONS CAUSED BYTUDY ON THE VIBRATIONS CAUSED BY

TUDY WILL REVEAL: MAIN FREQUENCIES,

RATION AND DAMPING VALUESRATION, AND DAMPING VALUES.

TALLED FOR DYNAMIC RECORDINGS.

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 19: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

4. MAGNITUDES TO BE MEASURED AND F

WIND SPEED (GUSTS).

SENSORS ARE PLACED ON PIERSENSORS ARE PLACED ON PIER

DECK. THEY MEASURE IN A C

EXTRACTING EXCLUSIVELY STEXTRACTING EXCLUSIVELY ST

MINIMUM, AVERAGE, ETC), OR EV

TEMPERATURE MEASUREMENTS

SENSORS ARE PLACED ON DIST

ORDER TO STUDY THE DIFFERE

AND EXPOSURES.

GLOBAL MEASURES OF TEMPERA

SPEED RECORDED ON A SEPARSPEED RECORDED ON A SEPAR

LEVEL.

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

19

FREQUENCY (cont.)

RS AT DIFFERENT HEIGHTS AND ON THERS AT DIFFERENT HEIGHTS AND ON THE

CONTINUOUS DISCREET DYNAMIC WAY,

TATISTICAL PARAMETERS (MAXIMUMTATISTICAL PARAMETERS (MAXIMUM,

VEN ON SPECIFIC EVENTS.

ON DECK OR PIERS.

TRIBUTED POINTS IN EACH BRIDGE IN

NCES BETWEEN DIFFERENT SURFACES

ATURES, HUMIDITY, PRESSURE AND WIND

RATE SYSTEM PLACED AT THE DECK’SRATE SYSTEM PLACED AT THE DECK’S

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 20: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

4. MAGNITUDES TO BE MEASURED AND F

PRESENTATION OF STATISTICAL D

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

20

FREQUENCY (continued)

DATA ON WEBSITE

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 21: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

4. MAGNITUDES TO BE MEASURED AND F

FREQUENCY IS VERY IMPORTAN

OBTAINED. THERE ARE GENERA

RECORDING DATA:

> CONTINUOUS STATIC RECORDIN

RECORDED EVERY 10 MIN)

> QUASIDYNAMIC OR CONTINUO

MEASURED IN A DYNAMIC WAY (

PERIOD FOR THE STATISTICAL ANA

DURING LONG PERIODS (FILES RAN

> DISCREET DYNAMIC (OR DIFFERE

MAXIMUM SAMPLE SPEED, BY R

LASTING A FEW SECONDS).

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

21

FREQUENCY (continued)

NT DUE TO THE LARGE DATA VOLUME

ALLY THREE WAYS OF GATHERING AND

G (1 DATUM/SECOND, STATISTICAL DATA

OUS DISCREET DYNAMIC RECORDING,

(UP TO 500 DATA/SECOND) WITH A SET

ALYSIS (EVERY MINUTE), AND RECORDED

NGING FROM 1 HOUR TO 1 DAY).

ENTIAL). ALL DATA IS RECORDED AT THE

REQUEST OR FOR AN EVENT (A FILE

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 22: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5. MONITORING CHALLENGE INVIADUCTS ARROYO DELVIADUCTS – ARROYO DEL

• Continuous structure divided in 27 sec• Continuous structure divided in 27 sec

The work’s total length is 1.755,00 m.

• The span between pier 14 and 15 is 13• The span between pier 14 and 15 is 13

of an ogival arch with a 132 m span an

Th t t l b f t ll d i t i• The total number of controlled points is

obtained.

- Displacements on founda- Relative displacements oA l ti d b- Accelerations caused by c

- Vertical accelerations- Wind speed (gusts)Wind speed (gusts)- Train speed- Temperatures

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

22

N HIGH-SPEEDL VALLEL VALLE

ctions with 52 50+25×66 00+52 50 m spansctions with 52,50+25×66,00+52,50 m spans.

32 m; the support in between has the shape32 m; the support in between has the shape

nd 50,4 m deflection.

65 f hi h 260 i t l h l bs 65, from which 260 virtual channels can be

ations and pier heads 22n pier/abutment – deck 8

t if l f d b ki 3centrifugal force and breaking 3129945

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 23: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5. MONITORING HIGH-SPEED VVALLE (continued)

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

23

VIADUCT IN ARROYO DEL

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 24: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5. MONITORING HIGH-SPEED VIN ARROYO DEL VALLE (cont

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

24

VIADUCT tinued)

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 25: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5. MONITORING CHALLENGE INVIADUCTS ARROYO DE LVIADUCTS - ARROYO DE L

• Continuous structure divided in 20 seContinuous structure divided in 20 se

spans. Total length: 1.208,90 m.

• The pier’s height ranges from 10 toThe pier s height ranges from 10 to

• The total number of controlled points is

obtained.obtained.- Displacements on foun

- Relative displacement- Relative displacement- Accelerations caused- Vertical accelerations- Wind speed (gusts)- Strains- Train speed- Temperatures

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

25

N HIGH-SPEEDAS PIEDRASAS PIEDRAS

ctions with 50.40+17×63.50+44.00+35.00 mctions with 50.40 17 63.50 44.00 35.00 m

92 m92 m.

s 81, from which 324 virtual channels can be

ndations and pier heads 20

ts on pier/abutment – deck 8ts on pier/abutment – deck 8by centrifugal force and breaking 2

10974

21

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 26: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5. MONITORING HIGH-SPEED VLAS PIEDRAS (continued)

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

26

VIADUCT IN ARROYO DE

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 27: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5. MONITORING HIGH-SPEED VLAS PIEDRAS (continued)

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

27

VIADUCT IN ARROYO DE

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 28: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

INSTRUMENTATION PR

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

28

SPEED VIADUCTSSPEED VIADUCTS

ROJECT

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 29: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

RECORDINGS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

29

SPEED VIADUCTSSPEED VIADUCTS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 30: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

RECORDINGS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

30

SPEED VIADUCTSSPEED VIADUCTS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 31: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

RECORDINGS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

31

SPEED VIADUCTSSPEED VIADUCTS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 32: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

RECORDINGS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

32

SPEED VIADUCTSSPEED VIADUCTS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 33: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

RECORDINGS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

33

SPEED VIADUCTSSPEED VIADUCTS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 34: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

5 MONITORING CHALLENGE HIGH5. MONITORING CHALLENGE – HIGH-

ANALYSIS

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

34

SPEED VIADUCTSSPEED VIADUCTS

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 35: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

35

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture

Page 36: 111214 ineco justo_cp_monitoreo_cancunshmii5-eng_v1

INECO. DIRECCIÓN DE ARQUITECTURA, ESTRUCTURAS E IN

SHMII-5. International Conference on SHM of Intelligent

36

STRUMENTACIÓN SHM OF HIGH SPEED RAILWAY VIADUCT

t Infrastucture