Supporting Coordination & Change Project PillarsAdaptive Management, Innovation Research (and

the role of Outcome Logic Models in both)

Boru DouthwaiteInnovation and Impact Director,

Challenge Program on Water and FoodBasin Leader Meeting

Vientiane, Laos, 19th January 2011

Page 2: 09 l2i adaptivemanagement,innovationresearch

7 PillarsProgrammatic coordination and quality of researchAdaptive managementInnovation researchEnabling changeCommunicationsCapacity buildingMainstreaming gender

Page 3: 09 l2i adaptivemanagement,innovationresearch

Adaptive management is understood as the ability of BDC research to learn from experience and to evolve; to adapt to the environment it finds itself in and to get better.  Adaptive management involves early identification of opportunities, threats and unexpected consequences together with taking appropriate action, including the redrafting of research agendas, and the proper documentation of this learning.  The Project is responsible for putting in place a framework and incentive structure that will allow this cumulative learning and change to take place. 

Adaptive Mmgt – what is expected

Page 4: 09 l2i adaptivemanagement,innovationresearch

Specifically, the Coordination Project is responsible for:• Using data, evidence and analysis to query and

reflect on the logic and assumptions underpinning BDC and project outcome and impact pathways, and to re-direct and re-design research issues in coordination with other projects,  leading to more appropriate pathways with more probability of success

• Carry out regular data-driven SWOT analysis• Conduct regular stakeholder surveys and

consultations to monitor BDC performance and changing next user needs, including regular “reflection workshops”.

Continued

Page 5: 09 l2i adaptivemanagement,innovationresearch

Adaptive management and reflection

Inception Workshop

Adjusted outcome pathways

Page 6: 09 l2i adaptivemanagement,innovationresearch

Innovation Research – what is expected

To be successful at fostering innovation, BDC staff needs to understand how research does and does not trigger innovation processes.  Hence research to understand change processes (innovation research) is carried out in the BDC [i.e., by the C&C Project] to guide action both inside and outside the CPWF.  Innovation research is carried out in two main areas – internal to the BDC, and external.  

Page 7: 09 l2i adaptivemanagement,innovationresearch

Continued

1. Internal -- The BDC and its projects are experiments into putting research into use.  Outcome and impact pathways provide hypotheses that are tested as part of project and BDC monitoring.  The Project coaches other BDC projects on monitoring, and analyzes the data gathered to extract useful principles.2. External – Much can be learned from on-going, successful and unsuccessful innovation processes.  For example, Project 1 on targeting and scaling-out, seeks to determine which agricultural water interventions work where, and why.  Answering this question involves understanding where existing technologies have worked and failed, i.e., research into what drives and constrains innovation.

Page 8: 09 l2i adaptivemanagement,innovationresearch

ContinuedThe role of this C&C Project is to lead the first area and coordinate the second so that the BDC answers the following research questions (an indicative not exhaustive list):• What mechanisms does research trigger, in which

contexts, in efforts to transform research into developmental outcomes?

• How far does a trans-disciplinary, integrated approach contribute to development outcomes?

• When and where does networking, in the form of engagement in multi-stakeholder platforms and other modalities, work to link research to generation of outcomes?

Page 9: 09 l2i adaptivemanagement,innovationresearch

OLMs and M&EOLMs contain the project outcome pathwaysOutcome pathways are causality chains that are tested by during project implementation, with the data coming from monitoring and elsewhereReflection, based on comparing what was expected against what is happening, the is basis of adaptive managementComparing across experience BDC projects’ experience of setting up and adjusting outcome pathways – of trying to put research into use – can yield insight, and doing it is internal innovation research