×
Log in
Upload File
Most Popular
Art & Photos
Automotive
Business
Career
Design
Education
Hi-Tech
+ Browse for More
The top documents tagged [technical design report]
Documents
May 2009KM3NeT1 What is KM3NeT ? Future cubic-kilometre scale neutrino telescope in the Mediterranean Sea Exceeds Northern- hemisphere telescopes by factor
213 views
Documents
Dr. Hartmut Eickhoff, GSI 1 Heavy Ion Cancer Therapy The Heidelberg Ion Therapy Facility (HIT) H. Eickhoff GSI, Darmstadt, Germany
237 views
Documents
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners This structure has concluded its function
215 views
Documents
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Why/what is the ILC? The GDE The baseline design and R&D efforts The path to the RDR Detectors
213 views
Documents
Wen-Te Liao@ Magurele 11. 03. 2011 Nuclear Coherent Population Transfer with X-Ray Laser Pulses 11. 03. 2011. @ Bucharest-Magurele 1 Nuclear Coherent Population
215 views
Documents
CROSSGRID WP41 Valencia Testbed Site: IFIC (Instituto de Física Corpuscular) CSIC-Valencia ICMoL (Instituto de Ciencia Molecular) UV-Valencia Javier Sánchez
214 views
Documents
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005
216 views
Documents
Distributed Computing Beyond The Grid Alexei Klimentov Brookhaven National Laboratory Grid2012 Conference. Dubna 5 th International Conference "Distributed
220 views
Documents
Introduction to CMSSW Framework Concepts Simulation & Reconstruction Liz Sexton-Kennedy January 10, 2008
225 views
Documents
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting 22-23 March 2012 All changes made to the CFS 2007 Reference Design during
216 views
Documents
R. Coniglione INFN-LNS TEV PA Paris 19-23 July 2010 KM3NeT: a project for an underwater cubic kilometre neutrino telescope R. Coniglione INFN-LNS for KM3NeT
218 views
Documents
Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4 PANDA 3 Magnet design and integration of detectors Milestones Status Outlook
215 views
Next >