20

Tumbler assembly

Embed Size (px)

Citation preview

Page 1: Tumbler assembly
Page 2: Tumbler assembly

You may be getting the parts you need from storage bins or by unpacking a new protobot kit. Familiarize yourself with the parts – name, codes, sizes before beginning to build

Page 3: Tumbler assembly

Use a team tray to keep parts organized. This will save you lots of time in all future build and break downs.

Page 4: Tumbler assembly
Page 5: Tumbler assembly
Page 6: Tumbler assembly

New motors do not require clutches but use shaft couplers instead. Don’t forget to use stainless steel screws (not the black ones) to mount motors.

Page 7: Tumbler assembly
Page 8: Tumbler assembly
Page 9: Tumbler assembly
Page 10: Tumbler assembly
Page 11: Tumbler assembly
Page 12: Tumbler assembly

This is a repeat of the previous steps to build a mirror image of the right side you just completed.

Page 13: Tumbler assembly
Page 14: Tumbler assembly

The nut starter tool is especially useful during this part of the assembly

Page 15: Tumbler assembly
Page 16: Tumbler assembly
Page 17: Tumbler assembly
Page 18: Tumbler assembly
Page 19: Tumbler assembly

Now add the battery, cortex and connect the motors. Remember, motor controllers are also required.

Page 20: Tumbler assembly