What is a Meter?

Meter is a definition of how to collect metering data. Once associated with an asset or location, it stores the readings for this asset/location.

Meter can be used by multiple assets/locations. One asset/location can have more than one meter.

Meter is not equal to physical metering device and cannot be used to manage it. For this purpose you need to create an asset.

Page 3: Meters in IBM Maximo Asset Management

Use of Meters

The purpose of meters is to control the meter-based Preventive Maintenance and Condition Monitoring. Meters can record: Mileage or number of cycles. This can trigger

Preventive Maintenance (regulation, calibration, overhaul) e.g. every 10000 miles.

Condition Monitoring. This information is used for generating inspection Work Orders before the actual failure occurs.

Energy, fuel consumption – to compare the effectiveness of the assets or locations.

Asset productivity e.g. number of pieces manufactured.

Page 4: Meters in IBM Maximo Asset Management

Meter Types

Maximo has three meter types: Continuous meter – usually presents the mileage of the

device e.g. number of hours worked. New reading must be greater than (or equal) to the previous one. Maximo automatically calculates the daily average. This value is used to determine the next Preventive Maintenance date.

Gauge meters – presenting current condition of the device e.g. temperature. Readings are not dependent on the previous values and can repeat: 73, 68, 77, 73…

Characteristic value – the reading can be only one of the predefined text values e.g. number of broken fibers in the line: „<5”, „5-10”, „>10”.

Page 5: Meters in IBM Maximo Asset Management

Applications using Meters

Item MasterAssetsLocationsCondition MonitoringMaster PMPreventive MaintenanceWork Order Tracking (indirectly)

Page 6: Meters in IBM Maximo Asset Management

Meters Application

From Go To menu choose: Assets

Meters

Page 7: Meters in IBM Maximo Asset Management

Checking where the Meter is used

The tab Where Used in Meters application let you check where this meter is used: For which assets, locations, items, PMs, and Condition Monitoring measurement points.

Page 8: Meters in IBM Maximo Asset Management

Creating a Meter

When creating a meter you must define its type first: Continuous Meter (CONTINUOUS)

This meter type requires additional parameter: Reading Type Cumulative value (ACTUAL) Incremental value (DELTA)

Can have unit of measure defined e.g. km Gauge Meter (GAUGE)

Can have unit of measure defined e.g. ºC Characteristic Meter (CHARACTERISTIC)

Must have alphanumeric domain assigned

Page 9: Meters in IBM Maximo Asset Management

Meters Grouping

If multiple assets/locations use many meters, then instead of adding them one by one, you can group the meters and add just one meter group to the asset/location.

Meter groups are also used for adding meters to rotating items in Item Master application. All rotating assets created from this item will inherit all the meters from this meter group.

Meter Groups are defined in the application of the same name (located in Assets module)

Page 10: Meters in IBM Maximo Asset Management

Adding Meters to Asset/Location

Meter can be added to the asset/location on the Meters tab in respective application Click New Row button to add one meter Enter information in Meter Group field to add

multiple meters

When defining a meter, you can enter its last reading and reading date.

Page 11: Meters in IBM Maximo Asset Management

Adding Meters cont.

For continuous meters additional information must be entered: Average Method

All readings (ALL) – Maximo calculates the daily average based on all readings

Static value (STATIC), you have to enter the Average Units/Day information manually, Maximo will not calculate the daily average

Last n Readings (SLIDING-READINGS), you have to enter in the field Sliding Window Size how many readings will be included in average calculation.

Reading from last n Days (SLIDING-DAYS), you have to enter in the field Sliding Window Size how many days will be included in average calculation.

Page 12: Meters in IBM Maximo Asset Management

Adding Meters cont.

Another mandatory parameter for continuous meter is Reading Type: Cumulative value (ACTUAL) Incremental value (DELTA) This attribute is defined already at the meter level,

but you can change it for specific asset/locationUsually this type of a meter has a maximal

value which can be displayed e.g. 99999 and after that the meter starts again 0. You enter this maximal value in Rollover field.

Page 13: Meters in IBM Maximo Asset Management

Entering Meter Readings

Meter reading for an asset/location can be entered in respective application using an action Enter Meter Readings

Page 14: Meters in IBM Maximo Asset Management

Entering Meter Readings cont.

The value of the checkbox Delta? is determined based on the content of Reading Type field: Reading Type=DELTA Delta?=Yes Reading Type=ACTUAL Delta?=No

You can check/uncheck Delta? to temporarily overwrite the Reading Type setting and for example for ACTUAL meter enter the incremental value instead of cumulative one.

Page 15: Meters in IBM Maximo Asset Management

Entering Meter Readings cont.

When the Rollover? flag is set, that means the CONTINUOUS meter has reached its maximal value.

This causes the next value to be lower than previous one.

The cumulative value will be equal to: Rollover + (Rollover - previous reading) + new reading Example: last reading = 98500, Rollover = 99999, new

reading = 925. New total value = 99999+(99999-98500)+925=102423

NOTE: Rollover? flag is active only for meters, which have a value in Rollover field.

Page 16: Meters in IBM Maximo Asset Management

Entering Meter Readings cont.

Meter readings can be entered in Work Order Tracking application too. But only for WO’s associated with an asset/location.

NOTE: this meter reading will be visible in Manage Meter Reading History window but is has no visible information about Work Order number which prevents user to check at which mileage this work has been done.

Page 17: Meters in IBM Maximo Asset Management

Copying the Meter Readings

Assets are usually organized in vertical structures: Engine is part of a truck and they both have the same

mileage meters. It is expected that both: engine and truck will

have separate history of meter readings, because the engine can be moved between vehicles.

At the same time, meter reading from the truck should be copied over to the engine’s meter.

Page 18: Meters in IBM Maximo Asset Management

Copying the Meter Readings cont.

Maximo allows for copying meter readings between parent asset and children, but also the reading from the location can be copied over to the assets in this location (in both cases the delta values are copied to the meters with the same name).

This mechanism can be enabled/disabled by choosing appropriate value in the Accept Rolldown From field: From parent asset (ASSET) From location (LOCATION) Do not copy the readings from other objects (NONE)

Page 19: Meters in IBM Maximo Asset Management

Reviewing Readings

The meter readings can be reviewed in the Manage Meter Reading History window in Assets/Locations application.

You can also modify the reading in the fields: Modified Delta and Modified Reading (depending on the flag Enter as Delta?)

Any change in the historical values will update cumulative value in all consecutive readings, also the daily average will be updated.

NOTE: existing meter readings cannot be deleted.

Page 20: Meters in IBM Maximo Asset Management

History of Continuous Meter Readings

Action Reset/Replace Meters contains interesting statistics about continuous meter: mileage since last repair, overhaul and inspection.

This calculation is based on the type of the Work Order type, which is configured in Organizations application, Work Order Options/Work Type.

Page 21: Meters in IBM Maximo Asset Management

Replacing Meters

Meters must be sometimes replaced due to failures or calibration.

New device will have (usually) the reading equal to 0, which is lower than previous reading (for CONTINUOUS meters).

To report that meter was replaced, you must trigger the Reset/Replace Meter action and enter initial meter reading.

Page 22: Meters in IBM Maximo Asset Management

Fuel Consumption Registration

In order to collect fuel consumption information, the meter with the same name e.g. DIESEL must be assigned to non-rotating item (fuel) and the asset (truck).

Each issue transaction of the item (fuel) for the asset having meter: DIESEL will increase the assets meter reading and add same number of gallons/liters.

Page 23: Meters in IBM Maximo Asset Management

Condition Monitoring Application

From Go To menu choose: Assets

Condition Monitoring

Page 24: Meters in IBM Maximo Asset Management

Condition Monitoring Application cont.

This application is used to define the measurement points which are associated with gauge or characteristic meters.

Each measurement point has its upper and lower thresholds.

Once the threshold is reached, Maximo will generate a Work Order (usually of type INSPECTION) for the related asset/location. The purpose of this Work Order is to check what is wrong and identify an issue which can be fixed before the real failure occurs.

Page 25: Meters in IBM Maximo Asset Management

Condition Monitoring Application cont.

NOTE: In order to generate Work Orders automatically the cron task MeasurePointWoGenCronTask must be enabled.

Because the readings can change rapidly, it is likely that large number of information will be entered in Maximo.

Usually this requires an integration with measurement equipment (to avoid manual input).

Page 26: Meters in IBM Maximo Asset Management

Defining Measurement Point

To define a measurement point an asset (or location) and a meter must be selected first.

Depending on the meter type, additional information should be entered defining the activities which will be triggered when the threshold is reached (see next slides).

Page 27: Meters in IBM Maximo Asset Management

Defining Measurement Point cont.

Gauge meter Upper Limits and Lower Limits sections must be filled

out. Each section has two values: warning and action. Warning value has no functionality–it must be configured separately e.g. an escalation generating email notification. Action value will generate a Work Order which will be defined based on the information from either PM or Job Plan (only one of the values can be entered).

Page 28: Meters in IBM Maximo Asset Management

Defining Measurement Point cont.

Characteristic meter For each value a PM or Job Plan should be defined, which

will be used to generate the Work Orders.

Page 29: Meters in IBM Maximo Asset Management

History of Work Orders

In Condition Monitoring application in section History you can check the list of Work Orders generated for this measurement point.

Page 30: Meters in IBM Maximo Asset Management

Using Meters in Work Orders

At the task level in a Work Order you can define Observations, which can be connected with measurement points defined in Condition Monitoring application. This is helpful for inspections to answer the questions like: Visible leaks: No, Minor, Major Trees require cutting: Yes, No

Page 31: Meters in IBM Maximo Asset Management

Using Meters in Preventive Maintenance

You define the meter-based PM on the Frequency tab in Preventive Maintenance application.

Frequency field must be filled in.You can additionally provide the number of

units before the threshold is reached to generate the WO (Generate WO Ahead By)

Page 32: Meters in IBM Maximo Asset Management

Using Meters in PM cont.

Daily average is presented in the field Average Units/Day. When you divide Frequency by this value, you will get number of days between WO’s, next WO date is visible in Estimated Next Due Date.

Page 33: Meters in IBM Maximo Asset Management

If you want to learn more about Maximo…

Please read my book: IBM Maximo Asset Management.

The Consultant’s Guide

Page 34: Meters in IBM Maximo Asset Management

Legal information

All product and company names mentioned in this publication may be trademarks or registered trademarks of their respective owners.