Agenda

• Life Before Continuous Delivery • Discovering and Implementing Continuous

Delivery • Refining the Flow • Working with Continuous Integration/Delivery • Evolving Continuous Delivery

2

Quick Overview of Engineering at Constant Contact

3

Engineering

• About 15-18 engineering teams each with an average size of 8-12 engineers

• Typical ratio of 1 Quality Engineer per 2-3 Software Engineers

• Teams function as either Feature teams, Platform teams or a combination of both

4

Engineering

• Distribution includes: • Waltham, MA (Head Office) • Tribeca, NY • Battery Park, NY • San Francisco, CA • Boca Raton, FL • Loveland, CO

5

Life Before CD

6

Life Before CD

• Weekly deploys • Build pipelines owned and operated by

Engineering Services • All deploys had to go through a request and

queue process • Progressing through 5 different environments

• Development, Functional, Load, Stage, Production

7

Life Before CD

• Engineers coding large units of work in the Development Environment

• Code was then deployed to the Functional environment

• Testing implemented and executed by the Quality Engineers in the Functional testing Environment

• Integration testing may happen in the Functional or Load Testing Environment

• Once all tested code progressed to the Stage Environment

8

9

Backlog In DevelopmentReady for Dev Ready for

ValidationIn

ValidationReady for

Deploy Deployed

10

Development LoadFunctional Stage Production

30% Stable

80% Stable

90% Stable

99% Stable

99% Stable

Life Before CD

• Visibility on what was being deployed was very general

• We knew work was going out but troubleshooting issues tended to be tricky due to large commits

• Kanban SDLC • Multitasking was a big thing

11

Discovering and Implementing Continuous Delivery

12

The Big Question

13

Howdo we start?

Where

What is everyone else doing?

• We first looked at how other teams had approached CD

14

New York, NY Office

• Pre-emptive CD

15

Waltham, MA Office

• Integrated CD

16

We set goals!

• Development teams own their applications • Build and deploy through to production

• Deliver quality code minimising defects through improved test coverage

• Increase velocity by 20% by the end of 2013, another 50% by the end of 2014

• Direct to production deploys by the end of 2014

17

We formed a CD Team

• Main body of governance for CD • Core development and assistance of integrations • Goto team for anything CD • Consisted of:

• Product Owner • Dev Manager • Architect • QE

• Engineering was utilised form the team adopting CD

18

Planning

• Key to success in implementing CD • Where are you deploying? • What are the steps to a successful deploy? • What are the effects of one event to another? • How will engineers engage with CD? • How will this affect existing product work? • What are the milestones you want to deliver to

a team? • Comes even before thinking of tooling

19

The Approach

• Convert to a single-branch model • Hard version all artefacts (produced and

consumed) • Harden test coverage • Set up the skeleton build jobs

• Simple Checkout -> Build -> Unit Test -> Publish -> Deploy Pipeline

• Deploy to 1 environment only then backfill

20

The Approach

• We didn’t want to manage multiple environments any more just 1 environment!

• Implement the practice of Feature Switches • Coach the Product owners how to write User

Stories

21

Working with Continuous Delivery

22

Technology Stack

• Jenkins • Open Stack (New) • LDAP • Puppet • GitHub • Artifactory (New)

23

Single Branch Model

24

Release

Feature 1

Feature 2

Single Branch Model

25

Release

Feature 1

Feature 2

Build Validation

Single Branch Model

26

Release

Feature 1

Feature 2

Pull Request Validation

Build Validation

Integration Testing

• Whole environment configured to execute Integration testing

• Separate Jenkins Server • Separate OpenStack Group • Owned by the QE team

27

28

Development LoadFunctional Stage Production

CD Deploy Manual Deploy

Manual Deploy

Manual Deploy

Manual Deploy

29

Development LoadFunctional Stage Production

CD Deploy

Backfill

Manual Deploy

Manual Deploy

Manual Deploy

1 OS VM

30

Development LoadFunctional Stage Production

CD Deploy

Backfill

Manual Deploy

Manual Deploy

Backfill

1 OS VM 2 OS VMs

31

Development LoadFunctional Stage Production

CD Deploy

Backfill

Push Button Deploy

Backfill Backfill

30% Stable

80% Stable

90% Stable

99% Stable

99% Stable

1 OS VM 2 OS VMs

4 OS VMs

32

Development LoadFunctional Stage Production

CD Deploy

Backfill

Push Button Deploy

Backfill Backfill

30% Stable

80% Stable

90% Stable

99% Stable

99% Stable

1 OS VM 2 OS VMs

4 OS VMs

6 OS VMs

Refining the Flow

33

Automating Servers

• Ensure that domains are properly configured • Setting up and pulling down instances in a

coordinated fashion • Attaching to the correct environment

34

Monitoring & Alerts

• Jenkins Job health plugin • Healthcheck dashboard • Splunk Logging • Nagios

35

Results of First Deliverable

• We had direct to Load deploys happening with backfill

• Test coverage up • New SDLC with QEs engaging at the beginning

of the flow, not waiting for engineers to complete work

• New way to view the health of the system through monitoring

• Base skeleton workflow that would be used to build new pipelines

36

Discoveries

• There is no main entry point when starting CD • Planning is crucial • Your SDLC will most likely change • Monitoring is key to knowing your progress • Educating the users of the system is also

paramount • Everyone is involved with CD

37

Discoveries

• CD is evolutionary • It will become part of your projects, not a

separate project • It will help your velocity just not right away • Don’t be afraid to innovate

38

Working with CD

39

SDLC

• Scaled Agile Framework • Initially taken from v1.0 • More recently v3.0

• Had to change • Epics -> Features -> Stories (-> Tasks)

40

SDLC

• Needed better tracking of what was happening now

• Velocity increased • A new development programme had to be put

together • Moved from Kanban to Scrum

41

SDLC

• Introduced 3 flows in Jira: • Epic Flow • Feature Flow • Scrum/Story Flow

42

Evolving CD

43

2015

• Examine the gaps and address them • Better integration with GitHub, Jenkins and Jira • Improve reporting and Release Notes • Try and automate the whole process from

changing a Jira Ticket status to building out a whole environment