BURJ DUBAIworld’s tallest building

Certified by : Council on Tall Buildings and Urban Habitat ( CTBUH) Location : 1 Sheikh Mohammed bin Rashid Boulevard, Dubai United Arab Emiratesproject manager : Greg SangConstruction started : 6th January 2004Completed : 30th December 2009Opening : 4th January 2010Cost : USD$ 1.5 billionArchitectural style : Neo-futurismWebsite : www.burjkhalifa.ae

Page 3: Presentation on burj khalifa
Page 4: Presentation on burj khalifa

Height and technical details

Architectural : 828m [2717 ft ]Tip : 829.8m [2722 ft ]Roof : 828m [2717 ft ]Top floor : 584.5m [1918 ft ]Observatory : 555.7m [1823 ft ]Floor count : 154 usable floors, 9 maintenance levels, 46 spire levels, and 2 below ground parking levels.Floor area : 3,09,473m [3,331,100 sq ft]Lifts/ elevators : 57 [ 55 single deck and 2 double deck]

Page 5: Presentation on burj khalifa
Page 6: Presentation on burj khalifa

DESIGN AND CONSTRUCTION Architect : Adrian Smith Developer : Emaar propertiesStructural engineer : Bill BakerMain contractors : Samsung Engineering and Construction Company,Besix and Arabtec. construction project manager Turner construction Grocon, Planning Middle East Foundation, Lift contractor Otis

Page 7: Presentation on burj khalifa

objectives World’s tallest structure that includes residential space World’s highest observation deck ( 148th floor) World’s highest outdoor observation deck ( 124th floor) World’s highest installation of aluminium and glass

façade World’s highest night club (144th floor) World’s highest restaurant (122th floor) World’s highest new year display of fireworks Tallest skyscraper Building with most floors :163 World’s longest travel distance elevators Building with world’s highest occupied floor Highest vertical concrete pumping

Page 8: Presentation on burj khalifa
Page 9: Presentation on burj khalifa

Night club

Page 10: Presentation on burj khalifa

Restaurant

Page 11: Presentation on burj khalifa
Page 12: Presentation on burj khalifa

Budget In March 2009 , Mohammed Ali Alabbar , chairman of the project’s developer ,Emaar Properties ,said office space pricing at BurjKhalifa reached US$4000 per sq.ft and the Armani Residences ,also in Burj Khalifa soldFor US$3500 per sq.ft . He estimated the total cost for the projectto be about US$1.5 billion

Page 13: Presentation on burj khalifa

period of construction

January 2004 : Excavation commences

February 2004 : Piling starts21 September 2004 : Emaar contractors

began constructionMarch 2005 : Structure of Burj

Khalifa starts rising.June 2006 : Level 50 is reached February 2007 : passes the Sears

Tower as the building with the most floors.13th May 2007 : Reached 130th floors

Page 14: Presentation on burj khalifa

1st September 2008 : Height tops 688m,surpassing

the previous record holder Warsaw Radio Mast ,

Poland.1st October 2009 : Exterior of the building completed.4th January 2010 : Burj Khalifa’s official

launch ceremony and it opened.4th january 2010 : Burj Dubai was renamed

as Burj Khalifa in the honour of president of UAE and

the ruler of Abu Dhabi , Sheik Khalifa bin Zayed al

Nahyan10th March 2010 : Certifies Burj Khalifa as world’s Tallest

Building.

Page 15: Presentation on burj khalifa
Page 16: Presentation on burj khalifa

RESOURCES The primary structure is reinforced concrete .

Super high pressure trailer concrete pump .

Used 330,000m cube,55000 tones of steel rebar.

22 million man-hours .

3 tower cranes were used during the construction of upper most

levels ,each capable of lifting 25 tonne load.

The remaining structure is constructed of lighter steel .

A high density , low permeability concrete was used in the foundation

A cathodic protection system is used to minimize any detrimental effects

from corrosive chemicals in local ground water.

It is highly compartmentalised with air –conditioned floors

Page 17: Presentation on burj khalifa

Construction method and technology The Burj Dubai Tower utilizes the latest advancements in construction techniques and material technology. The walls are formed using Doka’s SKE 100 automatic

self climbing formwork system. The cranes have been specially modified to be able to

lift the extreme lengths of cable required. High speed ,high capacity construction hoists were

used to transport the workers and materials to the working place.

An extensive program of wind tunnel tests and other studies were under taken by the wind tunnel consultant.

A specialized GPS monitoring system has been developed to monitor the verticality of the structure.

Page 18: Presentation on burj khalifa

Celebrating new year