Green, Speedy,LOW - COST,

DURABLE,R.C.B.,

HOUSING

Page 2: Presentation

www.AffordableConstruc

tion.in

Ganesh Kamat B.E. (Civil), M.S. (U.S.A.)

Pioneers in R.C.B., Planning & Design.

Licensed Structural Engineer,42 yrs. Exp.

Mobile: 98 20 86 77 55

E-mail: [email protected]

Ganesh N. Kamat
Page 3: Presentation

Approval Procedure Cycle.

Do you want cycle in every 20 years ?

Approval

Repair

BuildRedevelopment

Page 4: Presentation

Approval Procedure = Monopoly + Power - Transparency

Page 5: Presentation

We can Reduce Approval Procedure by Simple Bye-laws Power to Architect On line Procedure Sustainable Construction for at least 100 years maintenance free & Green Building for M.o.E.F. Approvals.

Page 6: Presentation

More People DieDue to more food

Than Less Food

Page 7: Presentation

More Buildings

Collapse

Due to Self Load

Page 8: Presentation

Although we have high strength concrete & steel then why are the beams, columns, slabs, of our Buildings NOT comparably of smaller size than (1:2:4:) M15 in olden days? & steel quantities reduced?

Page 9: Presentation

Are we designing Buildings to take care mostly of self load ??As of now about 90% self load takes care of only about 10% live load.Can the self load be reduced by hollow, light weight members?

Page 10: Presentation

R.C.C. Life…..50yrs.

R.C.B. Life........100yrs

Stone Load bearingBldg. Life………1000yrs

Page 11: Presentation

Need forGreen, Load Bearing ,

Affordable , SpeedyDurable for 100 yearConstruction Method

Page 12: Presentation

Good Construction

Needs Knowledge &

Honesty

Page 13: Presentation

Green Load bearing Houses Must Be Attractive Economical Eco Friendly Proven Simple Speedy Sturdy Sustainable

Page 14: Presentation

While Planning the Building it is more Appropriate To Work Out Which is the Most Suitable Construction Method and Plan as per the Technology. R.C.C., STEEL, PRECAST , RIB SLAB. Aluminum-ShutteringR.C.B. (Reinforced Concrete Block Masonry.)

Page 15: Presentation

Affordable Due To Optimum Planning Detailed Designing Detailing of each Joint Appropriate Technology

Page 16: Presentation

PLANNING

More common walls Least number of notches Least wall area / Floor area ratio Complete detailing for each member Minimum number of staircase Least common passages Least foot print & loading

Page 17: Presentation
Page 18: Presentation
Page 19: Presentation
Page 20: Presentation
Page 21: Presentation
Page 22: Presentation
Page 23: Presentation

10% More Carpet Area. So Most Affordable

LESS OFFSET, MORE COMMON WALLS

Page 24: Presentation

1.5 BHK in 3 Lacks Beauty with Economy

Page 25: Presentation
Page 26: Presentation

TOTAL COST WITH FINISHING For R.C.C. …….. Rs. 1000/- per Sqft.

For Aluminum Form ..Rs. 1200/- per Sqft. For R.C.B . ………Rs. 700/- per Sqft.

Page 27: Presentation

1) R.C.C. type of construction was taught by British & we are following Beam & Column type of construction for the last hundred years or so in India. 2) R. C. C. building needs repairs within 15 years of construction.Not that anything is wrong with R. C. C. but there is more scope to use inferior material & workmanship in R.C.C.& hence need for early repair. 

Page 28: Presentation

3) Our Forts, Old buildings, V. T. Station, Municipal Bldg., Palaces, Towers are generally constructed by Stone Masonry load bearing method & have stood since hundreds of years without any major repair work. 4) The same load bearing technology has been further developed in U.S.A. which is Speedy, Sturdy, Simple, Durable, Eco-Friendly which also saves 30% in construction cost & is called R.C.B./ Reinforced Masonry/ C.M.U. 

Page 29: Presentation

By Reinforced Concrete Block Masonry R.C.B.

Method of Construction

Green Affordable Structures

Advantages(Economy, Speed & Simplicity)Architectural Features

Earthquake, Wind & Fire resistance

Conclusion

Presentation on Green Load Bearing Housing

Page 30: Presentation

Method Of Construction

Page 31: Presentation

Concrete block 8” X 8” X 16”

Ultimate strength = 40,000 Kg/block

Page 32: Presentation

As Air is freely available and Hollow Concrete Block is 50% hollow, if a structure is built by R.C.B. the cost of construction is slashed down.

Page 33: Presentation

Staggered Joints In Block Masonry

Page 34: Presentation

R.C.B. Work Under Progress

Page 35: Presentation

13 Block Layer + Slab=15 Days.

Page 36: Presentation

R.C.B. Pointing From Outside

Page 37: Presentation

In India 300 buildings have been designed by R.C.B. method in the past 30 years by us.

In the world millions of buildings have been built by this established & proven American technology in the past 90 years.

Page 38: Presentation

R.C.B. Users BMC Bhojwani Const.

MHADA Unity Const. P.W.D. Vipassana Govt. of Gujarat Lodha Kamat Hotel (i) Ltd. Excon Royal Hotel Arch. Bhatnagar Ganaka Hotel Arch. Kudalkar Poddar Developer Arch. Premnath. Panoramic Universal African Countries

Page 39: Presentation

R.C.B. Structures

Page 40: Presentation

Architect Bhatnagar’s Bungalow, Malad,

Page 41: Presentation

No Beam, Column & Offset in Bungalow

Page 42: Presentation

6 Storey Building At Mahim For Unity Construction

Page 43: Presentation

Budget Motel at Igatpuri – Under Construction

Page 44: Presentation
Page 45: Presentation

RCB Column

Page 46: Presentation

Interior Pointing

Page 47: Presentation

Method Of Pointing

Page 48: Presentation
Page 49: Presentation

BMC School At Goregaon, Mumbai

Page 50: Presentation

No Beam, No Column only RCB

Page 51: Presentation

Vertical Reinforcement At Corner

Page 52: Presentation

Door-Window Frame before casting Slab

Page 53: Presentation
Page 54: Presentation

Advantages

Speed,

Simplicity

Sustainability,

Economy

Page 55: Presentation

Eco - Friendly As it SAVES,100% Bricks,50% Steel & Shuttering,40% Concrete,25% Utility Bill.

Page 56: Presentation

96 Houses For Policemen, Jogeshwari

Page 57: Presentation

R.C.B. Pointing From Outside

Page 58: Presentation

Vipasanna Meditation Hall, Igatpuri

Page 59: Presentation

Plan

For

65 feet

Meditation

Hall

Page 60: Presentation

R.C.B. WALL & SLAB

Page 61: Presentation

150 Earthquake Proof Homes, Gujrat

Page 62: Presentation

Foundation Work

Page 63: Presentation
Page 64: Presentation

Foundation For R.C.B. Work

Page 65: Presentation

Runner Beam

Vertical Steel.

Horizontal Steel.

Wall Footing

Page 66: Presentation

MASONARY JOINTS

Page 67: Presentation

MASONRY HORIZONTAL REINFORCEMENT

Page 68: Presentation

HOUSING & SLUM PROJECTS 6 Bldg. Quarters for Policemen of SRPF,

Goregaon, Mumbai For P.W.D. 16 Bldg at Vinoba Bhave Nagar transit camp,

kurla, Mumbai For MHADA. 5 Bldg. For Pancharatna Soc. Complex at Neral,

Maharashtra. Transit Bldg. For Unity Construction at

Sitaladevi Temple Rd. Mahim Mumbai. 150- Earthquake Proof House for Gujarat Govt.

at Morvi (World Bank Project.) Transit Bldg. For Bhojwani Builders at Khar,

Mumbai. Housing Complex for Lodha at Shirdi

Page 69: Presentation

RIBBLOCK

RIB

Page 70: Presentation
Page 71: Presentation

Concealed Wiring in Slab

Page 72: Presentation
Page 73: Presentation

RIB SLAB BOTTOM

RIB

BLOCKS

Page 74: Presentation

SHOPPING MALL AT AFRICA

Page 75: Presentation

THE GREAT PYRAMID AT EGYPT

Page 76: Presentation

PROPOSED RCB PYRAMID PRAYER –HALL AT AFRICA

Page 77: Presentation

COMMERCIAL & SCHOOL PROJECT School & Dispensary for B.M.C at Film City

road, Goregaon (E) Mumbai. Meditation Hall for Vipassana at Igatpuri ,

Maharashtra Old man colony at Badlapur Fire Station at Illinois, U.S.A. The Eldorado Theatre at Tucson U.S.A. Shopping Centre at Tucson U.S.A. Shopping Centre (100000 Sq.Ft.)at Africa. R.C.B. Pyramid Prayer Hall at Africa.

Page 78: Presentation

BUNGALOW PROJECT 

Triplex Bungalow at Malvani Church, Malad (W) Mumbai.

Six Bungalow at Kalyanpur Colony, Lonavala.

Bungalow for Arch. Bhatnagar at Chickni Murud

Bungalow for Mr. Rohidas Koli at Malvani, Malad Mumbai.

Bungalow for Assi. Teachers for Vipassana, Igatpuri

Bungalow for Bhatnagar, Bordi. Bunglow for Vipasanna at Titwala Bunglow for architect Premnath at

Vasai 500 – (4 BHK) Bunglow at Africa.

Page 79: Presentation

Architectural Features

Page 80: Presentation

Arch Masonry Bungalow

Page 81: Presentation

Royal Hotel Building, Arizona. USA

Page 82: Presentation

R.C.B. Hotel, Tuscan, Arizona, USA

Page 83: Presentation

Bungalow At Lonavala

Page 84: Presentation

Beauty With Simplicity

Page 85: Presentation

Bungalow at Arizona U.S.A.

Page 86: Presentation

Slum House At Malad

Page 87: Presentation

Typical Compound Wall

Page 88: Presentation

HOTEL PROJECTS Hotel Granada Inn at Tucson Arizona, U.S.A. Hotel Granada Inn at EI Paso, Texas U.S.A. Hotel - The Chaparral at Siera Vista, Arizona

U.S.A Hotel Maharaaja Inn at Lonavala Maharashtra,

India. Ganaka Motel - NH3 - Near Manas Resort,

Igatpuri, India. Kamat Hotel at Nashik Lotus Suit at Chandigarh 4 Star Resort at Durgapur

Page 89: Presentation

First R.C.B. Hotel Building In India, 1977

Page 90: Presentation

Proposed 3 Star Hotel At Nasik For Kamat Hotel

Page 91: Presentation

4 Star Resort At Durgapur

Page 92: Presentation

Completed Masonry Building

Page 93: Presentation

Shear Wall Structures Are

Also Earthquake, Wind & Fire Resistance

Page 94: Presentation

Joint Failure in R.C.C.

Page 95: Presentation
Page 96: Presentation
Page 97: Presentation

Simple water Penetration Test.Slab must NOT

Leak After Casting

Page 98: Presentation

Simple Cement Test.

Make Cement RotiIf Roti Hardens in

One Hour Cement is OK

Page 99: Presentation

Need forLow Strength

Cement for Plaster, Masonry, P.C.C/ Flooring, Waterproofing,

Ceiling, Drainage, Plumbing work

Page 100: Presentation
Page 101: Presentation

Fire Resistance Due To Horizontal Projection

Page 102: Presentation

Decorative Block Masonry

Page 103: Presentation

Elevation From Decorative Block Masonry

Page 104: Presentation

R.C.B. Decorative Blocks

Page 105: Presentation

Decorative Block

Masonry

Page 106: Presentation

Decorative Jali Block

Page 107: Presentation
Page 108: Presentation

Brick Wall ~ Block Wall

Page 109: Presentation

9’’ Brick Wall Costs:-15 Brick xRs.5/Brick = Rs.75/Sq. Ft.

7.5” Block Wall = Rs. 40/ block So SAVING = Rs. 35/ Sq. Ft.

Also SAVING in Time,Mortar Joint, Plaster, Labor,

Environment, Shuttering,

Column, Beam, Supervision.

Page 110: Presentation

Economy

RCC RCB Savings

Reinforcement 3.5 Kg / SF XRs 55 / Kg

1.2 Kg / SF XRs 55 / Kg Rs 126.50

Rs 192.50 Rs 66

Cement 0.6 Bag/SF XRs 310 / Bag

0.25 Bag/SF XRs 310 / Bag

Rs 108.50 Rs 186 Rs 77.50

Sand , Mettle, Brick, Plaster, Labour.

Rs 300 Rs 235 Rs 65

Finishing & Fees Rs 321 Rs 321 ----------

(Save up to Rs. 300 / SF of slab area)

Total Rs 1000 Rs 700 Rs 300

Note : By Optimized Plan get 10% more Carpet Area.

Page 111: Presentation

Advantages of R.C.B. Method. Economy : As steel, cement, formwork, concrete & Labor

required is almost half & due to simplicity of construction & speed, minimum saving is Rs. 300/- per sq. ft. Also by optimum planning for R.C.B. get up to 10% more carpet Area.

Speed: No heavy equipment needed on site, less formwork, less steel so construction is simple, speedier & hence economical.

Fire Resistant : Due to concrete block & 3.5" cover to steel, rusting is minimized & such buildings are fire resistant too.

Page 112: Presentation

Durable: Concrete blocks are attractive, durable and have excellent thermal, acoustic properties. No repair like R.C.C. is needed in every fifteen years.

Earthquake: Load bearing concrete blocks can be designed to be wind, earthquake resistant too. Up to 22 Storied.

Warranty: R.C.B. Method assured warrantee against heavy rain, flood, fire, storm, earth quake & all other natural calamities for at least 50 years.

Architecture: Ancient type of architectural elevation is also possible by R.C.B type of construction. Also R.C.B. is Environmental friendly too.

Page 113: Presentation

R.C.B. is Useful For

1) Retaining Wall2) Bridge Abutment3) Bridge Pier4) Highway Culverts

Page 114: Presentation

CONCLUSION Considering Durability, Speed, Simplicity, 30% Saving & 10% more Carpet Area. This Eco Friendly R.C.B. Construction is Particularly Suited For,

Housing, Slum Project, Transit Camp, Schools & Hospital, Hotel & Bungalow, Industrial Projects, Retaining Wall, Culverts etc.

Page 115: Presentation

REMARKS 1) For Affordability Architects/Engineers/Clients need to take a lot of efforts in Planning, Design, Detailing, & technology.2) The Architect / Engineer /Client must learn about Planning for the Technology first.3) Affordable structure is always green.4) Affordable does not mean cheap construction.5) By Optimum Planning we get 10% more Carpet Area.(Bonus to the Builders)

Page 116: Presentation

www.AffordableConstruc

tion.in

Ganesh Kamat B.E. (Civil) M.S. (U.S.A.)

Pioneers in R.C.B., Planning & Design.

Licensed Structural Engineer ,42 yrs. Exp.

Mobile: 98 20 86 77 55

E-mail: [email protected]

Ganesh N. Kamat
Page 117: Presentation