129

Cambicci Associates Portfolio

Embed Size (px)

DESCRIPTION

Our work for 20 years

Citation preview

Page 1: Cambicci Associates Portfolio
Page 2: Cambicci Associates Portfolio

Cambicci+Associates

page 2

This page was intentionally left blank

Page 3: Cambicci Associates Portfolio

Company profile 2012

page 3 out of 129

CCCooonnnttteeennntttsss Short presentation

Portfolio

Organisation

Qualifications

Curriculum Vitae

Contact

Cambicci+associates consulting engineers co Mechanical Electrical Plumbing Energy & Industrial Studies; security; lighting design; photovoltaics; renewable energy; energy inspections;

engineer & management services; supervisions; licensing; certifications

Page 4: Cambicci Associates Portfolio

Cambicci+Associates

page 4

This page was intentionally left blank

Page 5: Cambicci Associates Portfolio

Company profile 2012

page 5 out of 129

SSShhhooorrrttt ppprrreeessseeennntttaaatttiiiooonnn

The M.E.P. (mechanical, electrical and plumbing) studies office with the title Cambicci+Associates was founded in February 2007 by Gerasimos Kampitsis (Yerasimo Cambicci), Mechanical Engineer of the Aristotle University of Thessaloniki, following his work experience in electromechanical design and supervision since February 1992. Furthermore the office was manned with electrical and mechanical en-gineers aiming at the technologically sufficient and on time preparation of m.e.p. studies and supervisions. A consulting and engineering services company was legally constituted in 2012. The scope of our office in its current form is: • The elaboration of m.e.p. installations studies, for all types of projects (buildings, urban design and infrastructure). • Renewable energy systems design • Nearly zero energy buildings design • Energy feasibility inspections and evaluation of buildings • Obtaining permits and licences for buildings and installations • Lighting Studies • Supervision for all of the above subjects. • Consulting Services as a Project Manager

Page 6: Cambicci Associates Portfolio

Cambicci+Associates

page 6

Our services are provided either by choice, or via competition in the premises of either the “Design & Construct System” or the Greek S.D.I.T. system(collaborations of the public and private sector). The engineering studies that are elaborated pertain to buildings to be constructed or renovations and extensions of existing ones. The mechanical electrical & plumbing studies, referred as mep studies (or building services or electrical mechanical studies) are an im-portant component of the whole of the technical studies necessary for the completion of all projects, and they can be divided into the fol-lowing categories: Mechanical Electrical & Plumbing Studies Buildings

• Water Supply (pipe networks of potable water, hot-cold water supply networks and recirculation networks, production of hot water, solar panel systems(classical or of “void” type), storage tanks and pumping systems.

• Irrigation (irrigation with pop-up sprinklers, underground irrigation) • Rainwater Draining (using typical gravity networks, siphonic systems, under ground pumping systems.) • Sewage (sewage pipe networks, sewage pumping systems, water-oil seperators, fat-collectors, gasoline-collectors) • Heating-Airconditioning (Typical heating systems with a boiler, single pipe systems, two-pipe and four-pipe systems, underfloor

heating and floor cooling systems, central air-conditioning systems with air/water heatpumps or water/water cooling towers, air handling units, fan-coil networks, central and local split unit systems, VAV systems, geothermal systems, seawater het pumps, ex-haust and airing systems)

• Expense allocation for a central heating system • Gas fueled systems (natural gas(low and high pressure)and LPG networks) • Lifting systems (lifts, elevators, rolling stairs, traffic studies) • Swimming pools (public and private, open or closed type) • Medium Voltage private substation (medium voltage panels, power transformers, γlow voltage panels, main and auxiliary input

electrical generators, central and local U.P.S. systems, central safety lighting systems) • Heavy current electrical installation systems(lighting, plugging, in-rush current, electrical distribution in TN-C, TN-Sand IT systems) • Lightning Protection(Faraday cage and Franklin design systems, special grounding systems) • Light current electrical installation systems (phone-date networks, sound and pa installations, central R-TV-SAT, central clock sys-

tems, conference systems, translation systems, real time transmittion systems, hotel management systems, building management systems, remote control systems, control rooms systems)

• Antitheft protection (alarm, Access Control, C.C.T.V., vehicle stoppage systems, peripheral plot and building protection) • Fire safety (alarm, fire detection, security lighting ang signs, CO2, FM-200, Dry powder, Inergen, Argonite, water droplet automatic

fire suppression systems, fire hose networks, sprinklers systems, foam systems, freezing systems, mobile fire stoppage devices)

Page 7: Cambicci Associates Portfolio

Company profile 2012

page 7 out of 129

• Pneumatic tube systems • Central vacuum

Specifically for Greek Public Sector works (and for the private sector if required): • Elaboration of studies of all stages (preliminary, final, and construction) • Formulation of technical reports and specifications reports for the materials used in the study • Formulation of a general and specific obligations report for all parties involved in the project • Formulation of Cost analysis reports • •

Furthermore, in shopping malls and retail markets: • Formulation of a report of the renter’s obligations • Monitoring the observance of the renter’s obligations • Optical sign systems • Sound systems • Video Wall systems • •

Furthermore in Hotels: • Hotel room management systems • SPA, Jacuzzi, Sauna, Thalasotherapie systems • •

Furthermore in Hospitals: • Medical Gas networks (Oxygen, Nitrogen Protoxide, Vacuum, High and Low pressure air, sleeping gas exhaust) • Special electrical installations for operating theaters and intensive care units (conductive floors, earthing systems, isolation moni-

toring device for earthing systems, IT networks) • Medical equipment studies (Operating theaters, Intensive care units, Recovery units, Central Sterilization systems, linear accelera-

tor studies, special medical examination devices studies) • Steam networks • •

Furthermore in car parking buildings: • Exhaust networks for underground parking areas • Carbon monoxide detection systems • Management and electric signage systems for parking areas • Automatic management systems for parking areas (without a driver)

Page 8: Cambicci Associates Portfolio

Cambicci+Associates

page 8

Furthermore in industrial buildings: • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Piping Design Installations for gases & petroil sites • Antiexplosive installations • Industrial fluid and gases networks (pressurized air, petrol, oil, lubricants etc.) • Exhaust networks for spaces and machinery • Industrial equipment studies • Steam networks

M.E.P. infrastructure studies

Road Works • Highway and general road lighting works, overpass and intersection works • Electric signage • Special tunnel lighting of every form (drill, cut & cover) and underpass lighting • Lighting of all types of works • Tunnel exhaust installations • Electrical supply networks, of low medium and high voltage • Fire detection systems and tunnel fire safety • Tunnel monitoring networks (safety networks, height excess detection, emergency phones, safety lighting) • Tunnel servicing buildings • Central control stations for road works – control rooms • Sewage and garbage processing works • Primary, secondary and post secondary processing of liquid waste from sewage treatment facilities • Landfills and waste transportation centers • Solid waste processing units • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Central control installation networks • Pump stations • Hydraulic networks for the transportation of water from pumbing stations • Pumbstation electrical installations

Page 9: Cambicci Associates Portfolio

Company profile 2012

page 9 out of 129

Renewable resources studies • Solar panel systems for hot water production • Photovoltaic systems • Photovoltaic parks • Wind energy • Smal hydroelectric works • Systems integrating co-production of energy •

Licencing • Of industrial buildings & Installations • Private parking areas • Private filling stations(liquid or gas fuel) • •

Lighting design • Interior lighting • Lighting of public or private outdoor areas • Buildings beautification lighting • Monument lighting • Lighting of picturesque landscapes • Urban lighting plans

Safety studies • Risk analysis • Safety procedures and protocolls • Safety devices and measures • Passive safety devices and measures •

Supervisions • Technical supervision (technical specifications and obligations observance monitoring, material inspection, monitoring of the con-

struction, testing and adjustments) • Technical and fiscal supervision (technical supervision and auditing of accounts, validation of new prices, fiscal auditing of certifica-

tions) • M.E.P. installations certification

Page 10: Cambicci Associates Portfolio

Cambicci+Associates

page 10

Energy feasibility studies • Green building studies • Evaluation reconstruction and upgrade studies for existing buildings • Studies according to the Greek Regulation for the energetic evaluation of buildings • Evaluation of the energy requirements for heating systems • Thermography of buildings

Management and consulting services • Licensing coordination and control • Organizing competitions for the assignment of studies • M.E.P. studies managment • Organizing competitions for foster constuctors • Screening of candidates, objection managment • Project construction control • Timetable observance • Management of the obligations that are not in the initial agreement • Temporary and final undertaking of a project

Page 11: Cambicci Associates Portfolio

Company profile 2012

page 11 out of 129

Our offices are in Pylaia, Thessaloniki and we undertake projects in the whole of Greece and the neighboring countries. Outside of Thes-saloniki we have offices-contact points in Athens, Thessalia & Thrace. The office is fully equipped in personnel and technological equipment for the elaboration of mep projects. In our organogram there is an administration division, an engineering studies division, a services division, a cost analysis division, a quality control division and a secre-tarial services division. The electronical equipment of our offices, regarding computer based devices and software, is based on the princi-ple of optimal available and reliable technology and includes a sufficient number of work spaces, computers, a network Server, and high quality software. There is software for the electromechanical design, software regarding Legislation and scientific literature (International and Greek) and software for the cost analysis of Public Sector Projects.

Page 12: Cambicci Associates Portfolio

Cambicci+Associates

page 12

This page was intentionally left blank

Page 13: Cambicci Associates Portfolio

Company profile 2012

page 13 out of 129

PPPooorrrtttfffooollliiiooo

Page 14: Cambicci Associates Portfolio

Cambicci+Associates

page 14

Our office associates and personell have successfully taken part in a sufficient number of projects in Greece and other countries and are notably experienced in the fields that our office specializes in. In this process all engineers in our office have been part of small or bigger groups for the elaboration of simple or complicated works in a variety of areas in Greece and abroad. For the completion of our projects we have the capacity to obtain all necessary Permits and certifications. Our customers can be multinationals or smaller companies, technical firms, investment groups, private entrepreneurs and the Greek Pub-lic sector in all its legal forms and ehelons. Hereupon, some typical projects our office and engineers have been part of, are cited:

Category of projects pages Category of projects pages

Services 15 to 24 Housing 77 to 84

Culture 25 to 30 Urban 85 to 90

Hotels 31 to 40 Industry, Oil & Gas Installations 91 to 98

Education 41 to 46 Infrastructure 99 to 104

Health 47 to 52 Energy 105 to 110

Shoping malls & retail stores 53 to 68 Security 111 to 114

Recreation 69 to 72 Project management 115

Sports 73 to 76

Page 15: Cambicci Associates Portfolio

Company profile 2012

page 15 out of 129

SSSeeerrrvvviiiccceeesss

Page 16: Cambicci Associates Portfolio

Cambicci+Associates

page 16

Bank o f Greece Bu i ld ing in Thessa lon ik i , G reece

Project owner

Bank of Greece SA

Project design parties

Construction manager

Decathlon SA, D.Papazoglou

Architectural study & construction supervision

P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis

Structural study and construction supervision

Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos

Mep study and construction supervision

Y. Cambicci (*) BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos

Study period: 2004-2006

Construction details

General contractor: DOMOTECHNIKI SA

Construction period: 2007-2009

Construction status: in operation

Short description of project-services

The project subject is the design and supervi-sion for the construction of the new building of Money Circulation and Vaults of the National Bank of Greece in Thessaloniki

metrics

Buildings surface: 5.500m2

Plot size: 35.000m2

Budget: 5.000.000 €

(*) co-designer 33% for planning & construction supervision

Page 17: Cambicci Associates Portfolio

Company profile 2012

page 17 out of 129

Of f i ce Bu i ld ing Renovat ion in A thens , Greece

Project owner

Henkel Hellas SA

Project design parties

Construction manager

A.Drazinou-N.Prounias

Architectural study

Tsigarida Architects

Structural study

Mep study

Cambicci+Assoc iates

Study period: 2008

Construction details

General contractor: ΤΕΚΜΑ SA

Construction period: 2009

Construction status: in operation

Short description of project-services

The project scope was the transformation of the existing office building into a modern mul-tinational corporation office building in Greece, with a hairdressing Academy, an auditorium and an underground closed parking.

Google

metrics

Buildings surface: 8.500m2

Plot size: 4.100m2

Mep budget: 1.100.000 €

Page 18: Cambicci Associates Portfolio

Cambicci+Associates

page 18

Po l i ce Admin i s t ra t ion Bu i ld ing in Kozan i , Greece

Project owner

MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT

Project design parties

Project management

KED SA

Architectural study

406 Studies group, Vasileios Pappas

Structural study

I.Mavrakis and Associates SA

Mep construction study

Cambicci+Assoc iates

Study period: 2008-2009

Construction details

General contractor: ANDREADIS ZISIADIS SA

Construction period: 2009-2011

Construction status: in operation

Short description of project-services

The project scope was the construction study, for the auction of the new office building con-struction and underground parking area for the accommodation of the peripheral Police divi-sions of Western Macedonia prefecture, in

Greece. Google

metrics

Buildings surface: 5.200m2

Plot size: 4.000m2

Mep budget: 2.000.000 €

Page 19: Cambicci Associates Portfolio

Company profile 2012

page 19 out of 129

Manda l ide io Endowment a t N ik i s Avenue , Thessa lon ik i , G reece

Project owner

Company for the exploitation of AUTh real estate

Project design parties

Project management

AUTh Technical Department

Architectural study

NIMAND Architects

Structural study

Ioannis Poulios

Mep study

Cambicci+Assoc iates

Study period: 2009

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

The project scope is the transformation of the existing building in Nikis Avenue in Thessaloni-ki into a Multiple Purpose Hall of the Aritoteleion Univercity of Thessaloniki (A.U.Th.) at Thessaloniki seafront.

Google

metrics

Buildings surface: 1.600m2

Plot size: 260m2

Mep budget: 800.000 €

Page 20: Cambicci Associates Portfolio

Cambicci+Associates

page 20

Of f i ce bu i ld ing in Thessa lon ik i

Project owner

Grigorios Karidas limited

Project design parties

Project management

Architectural study

Panetsos Panagiotis

Structural study

G&G Penelis Consulting Engineers SA

Mep study

Cambicci+Assoc iates

Study period: 2007

Construction details

General contractor: ARCON Constructions

Construction period: 2008-2009

Construction status: in operation

Short description of project-services

The project scope is the transformation of the existing building in Dragoumi Street in Thes-saloniki into a modern office building.

Google

metrics

Buildings surface: 1.100m2

Plot size: 300m2

Mep budget: 500.000 €

Page 21: Cambicci Associates Portfolio

Company profile 2012

page 21 out of 129

MAKEDONIA In t .A i rpor t Termina l i n Thessa lon ik i , G reece

Project owner

OPPE Thessaloniki 97 – EYDE of Northern Greece Airports

Project design parties

Project management

OPPE Thessaloniki 97

Architectural study

Polis SA, G.Papakostas, J.Vlahos

Structural study

Concept Consultant-Engineers limited

Mep study

Y. Cambicci (*)

Study period: 1997-2006

Construction details

General contractor: ZINON ATHANASIADIS SA DOMOTECHNIKI SA – ANASTILOTIKI SA ANDREADIS ZISIADIS SA

Construction period: 1997-2008

Construction status: in operation

Short description of project-services

Renovation of existing building and new ex-pansions for a new Makedonia Airport Terminal

in Thessaloniki Greece Google

metrics

Buildings surface: 46.000m2

Plot size: 160.000m2

Mep budget: 40.000.000 €

(*) co-designer 25-50% (depending of the phase)

Page 22: Cambicci Associates Portfolio

Cambicci+Associates

page 22

Nat iona l Bank and Cu l tu ra l Center in Nor thern Greece

Project owner

National Bank of Greece SA

Project design parties

Project management

Andreadis-Zisiadis SA

Architectural study

Polis SA, G.Papakostas, J.Vlahos

Structural study

Concept Consultant-Engineers limited

Mep study

Cambicci+Assoc iates

Study period: 2006

Construction details

General contractor: ANDREADIS ZISIADIS SA

Construction period: 2007-2008

Construction status: in operation

Short description of project-services

Expansion of an existing building.

Google

metrics

Buildings surface: 3.600m2

Plot size: 800m2

Mep budget: 800.000 €

Page 23: Cambicci Associates Portfolio

Company profile 2012

page 23 out of 129

Town Ha l l o f Py la ia

Project owner

Municipality of Pylaia

Project design parties

Architectural study

K.Antoniou,E.Kastro,E.Disli,N.Barbari

Structural study

K.Anastasiadis, P.Panetsos

Mep study

Y. Cambicci (*)

Mep study advisor

Dr K.Pattas AUTh Proffessor

Study period: 1994-1996

Construction details

General contractor:

Construction period: 1997-2000

Construction status: in operation

Short description of project-services

Office building with 2 underground parking levels in Pylaia, Thessaloniki.

Google

metrics

Buildings surface: 2.700m2

Plot size: 900m2

Mep budget: 1.000.000 €

(*) co-designer 33% for planning

Page 24: Cambicci Associates Portfolio

Cambicci+Associates

page 24

Of f i ce bu i ld ing in Thessa lon ik i

Project owner

Αsea Βrown Βoveri (ABB) ΑΕ

Project design parties

Architectural study

N.Ktenas

Structural study

OMETE & ASSOCIATES SA

Mep study

Y. Cambicci (*)

Mep construction supervisor

Thomas Kolivopoulos

Study period: 1998-2000

Construction details

General contractor: ERGO3

Construction period: 2002-2004

Construction status: in operation

Short description of project-services

New ABB offices & whole sales building in North Greece

Google

metrics

Buildings surface: 4.000m2

Plot size: 6.200m2

Mep budget: 1.100.000 €

(*) co-designer 33% for planning

Page 25: Cambicci Associates Portfolio

Company profile 2012

page 25 out of 129

CCCuuullltttuuurrreee

Page 26: Cambicci Associates Portfolio

Cambicci+Associates

page 26

P lovd iv Opera Renovat ion in Bu lgar ia

Project owner

Oblast Plovdiv

Project design parties

Project management

ΑΚΤΟΡ BULGARIA SA

Architectural study

ΜΜΤ SΑ

Structural study

Concept Ltd

Mep study

Cambicci+Assoc iates

Study period: 2007

Construction details

Gen. contr: AKTOR SA & AKTOP BULGARIA SA

Construction period: 2008-ongoing

Construction status: under construction

Short description of project-services

The project scope was the full renovation of the existing historical building and it’s trans-formation to a modern Opera House, the for-mation of a Cultural Centre, the addition of a commercial building and an automated under-ground car parking area.

Google

metrics

Buildings surface: 14.000m2

Plot size: 8.000m2

Mep budget: 4.000.000 €

Page 27: Cambicci Associates Portfolio

Company profile 2012

page 27 out of 129

Thermi Mun ic ipa l Aud i to r ium, Thessa lon ik i Greece

Project owner

Municipality of Thermi

Project design parties

Project management

Thermi Municipal TD

Architectural study

ΜΜΤ SA

Structural study

ΜΜΤ SA

Mep study

Cambicci+Assoc iates

Study period: 2009-2010

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

Project scope is the construction study and the formulation of auction documents for the con-struction of a new conservatoire in the munici-pality of Thermi, Thessaloniki.

Google

metrics

Buildings surface: 1.600m2

Plot size: 1.700m2

Mep budget: 800.000 €

Page 28: Cambicci Associates Portfolio

Cambicci+Associates

page 28

Cu l tura l Cent re a t Tagarades , Thessa lon ik i , G reece

Project owner

Municipality of Thermi

Project design parties

Project management

Thermi Municipal TD

Architectural study

ΜΜΤ SA

Structural study

ΜΜΤ SA

Mep study

Cambicci+Assoc iates

Study period: 2009-2010

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

The project scope is the Study of a new Cultur-al Center with Theatre in the municipality of Thermi, Thessaloniki.

Google

metrics

Buildings surface: 4.800m2 Plot size: 4.600m2

Mep budget: 1.000.000 €

Page 29: Cambicci Associates Portfolio

Company profile 2012

page 29 out of 129

Michan iona Cu l tu ra l Cent re in Thessa lon ik i , G reece

Project owner

Municipality of Michaniona

Project design parties

Architectural study

E.Disli, X.Kiros, A.Xaritopoulos, Th.Theodoridis

Structural study

Concept Engineers Ltd

Mep study

Cambicci+Assoc iates

Mep study associate

G. Klepkos

Study period: 2010

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

The project scope is the construction study and the compilation of auction documents for the construction of the cultural center in the mu-nicipality of Michaniona, Thessaloniki.

Google

metrics

Buildings surface: 1.200m2

Plot size: 4.000m2

Mep budget: 900.000 €

Page 30: Cambicci Associates Portfolio

Cambicci+Associates

page 30

Vyzant ine Museum o f Ver ia , G reece

Project owner

Ministry of Culture

Project design parties

Project management

ΑΡΧΙΤΕX SA

Architectural study

G.Anifantis-S.Anifantis, Κ.Asamopoulos,E.Skaltsa,D.Kontargiris,

Α.Lampakis

Structural study

S.Kounadis, L.Kounadis, M.Zarkadoula & Associates

Mep study

Y. Cambicci (*)

Study period: 1998-2000

Construction details

General contractor: ARXITEX SA

Construction period: 2001-2003

Construction status: in operation

Short description of project-services

Reconstruction and building expansion of an existing old factory building (mill) in Veria.

Google

metrics

Buildings surface: 2.500m2

Plot size: 2.400m2

Mep budget: 1.300.000 €

(*) co-designer 30% for planning

Page 31: Cambicci Associates Portfolio

Company profile 2012

page 31 out of 129

Macedon ic Museum o f Modern Ar t i n Thessa lon ik i , G reece

Project owner

Macedonian Museum of Contemporary Art

Project design parties

Project management

ΑΡΧΙΤΕΤ ΑΤΕ

Architectural study

K.Antoniou-E.Kastro

Structural study

DELCO, N.Deligiannidis

Mep study

Y. Cambicci (*)

Study period: 1998-2000

Construction details

General contractor: ΑRΧΙΤΕΧ SΑ

Construction period: 2001-2003

Construction status: in operation

Short description of project-services

Renovation and expansion of a museum for modern art in Thessaloniki.

Google

metrics

Buildings surface: 4.400m2

Plot size: 4.150m2

Mep budget: 1.600.000 €

(*) co-designer 33% for planning

Page 32: Cambicci Associates Portfolio

Cambicci+Associates

page 32

Cu l tura l Cent re o f the Labour Cent re o f Komot in i

Project owner

Labor Center of Komotini

Project design parties

Project management

S.Agathakis & F.Stratos

Architectural study

G.Mademlis, Telis Vasiliadis

Mep study

Y. Cambicci (*)

Acoustical study

N.Mparkas-D.Keramidas

Study period: 2001

Construction details

General contractor: AGATHAKIS-STRATOS

Construction period: 2002-2003

Construction status: in operation

Short description of project-services

Renovation of an existing Theater in Komotini Greece.

Google

metrics

Buildings surface: 800m2

Plot size: 1.300m2

Mep budget: 400.000 €

(*) co-designer 33% for planning

Page 33: Cambicci Associates Portfolio

Company profile 2012

page 33 out of 129

HHHooottteeelllsss

Page 34: Cambicci Associates Portfolio

Cambicci+Associates

page 34

Restaurants AMMOS-ASTERIAS and Bousou las a t San i Resor t in Ha lk id ik i

Project owner

SANI SA

Project design parties

Architectural study

NIMAND Architects

Structural study

Mep study

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor: SANI SA

Construction period: 2012

Construction status: in operation

Σύντομη περιγραφή έργου-υπηρεσιών

Renovation of 2 beach-bars & restaurants at Sani resort in Halkidiki Greece.

Google

Μετρητικά στοιχεία

Buildings surface: 500m2

Plot size: m2

Mep budget: €

Page 35: Cambicci Associates Portfolio

Company profile 2012

page 35 out of 129

Open Theat re and mu l t i - func t ion a rea a t the San i Resor t in Ha lk id ik i

Project owner

SANI SA

Project design parties

Architectural study

NIMAND Architects

Structural study

Mep study

Cambicci+Assoc iates

Lighting design

G-Lights

Study period: 2010

Construction details

General contractor: SANI SA

Construction period: 2010

Construction status: in operation

Short description of project-services

The project scope was the construction of a new outdoor function area with a sheltered stage, auxiliary areas and adequate opticoacoustic equipment for the organization of cultural events in the SANI RESORT area

Google

metrics

Buildings surface: 2.500m2

Plot size: m2

Mep budget: 500.000 €

Page 36: Cambicci Associates Portfolio

Cambicci+Associates

page 36

Hote l renovat ion & expans ion in Ha lk id ik i , G reece

Project owner

Eisaei SA

Project design parties

Project management

ΜΜΤ SA

Architectural study

NIMAND SA – MMT SA

Structural study

ΜΜΤ SA

Mep study

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor: SYNTHESIS SΑ

Construction period: 2009-ongoing

Construction status: under construction

Short description of project-services

The project scope was the extension, recon-struction, and upgrade of a 300-bed existing hotel in Ouranoupolis, Halkidiki, Greece.

Google

metrics

Buildings surface: 9.500m2

Plot size: 25.000m2

Mep budget: 2.500.000 €

Page 37: Cambicci Associates Portfolio

Company profile 2012

page 37 out of 129

Congress Ha l l a t A lexander Beach Hote l i n A lexandroupo l i , G reece

Project owner

Xatzikonstantinou Bros SA

Project design parties

Architectural study

A&B Stylianidis

Structural study

K.Xatzikonstantinou

Mep study

Y. Cambicci

Mep construction supervisor

Ν . Gemitzakis

Study period: 2006

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2007

Construction status: in operation

Short description of project-services

The project scope was the construction of a new versatile E.O.T. approved congress hall, the formation of the outdoor area of the Hotel, and the updgrade of the m.e.p. installations of the Hotel

Google

Μετρητικά στοιχεία

Buildings surface: 1.200m2

Plot size: 10.000m2

Mep budget: 1.800.000 €

Page 38: Cambicci Associates Portfolio

Cambicci+Associates

page 38

Cas ino in Por to Car ras Grand Resor t , Ha lk id ik i Greece

Project owner

CASINO MAGIC PORTO CARRAS SA

Project design parties

Project management

ΑΡΧΙΤΕΧ SA

Architectural study

P.Makridis + Associates

Structural study

Mep study

Y. Cambicci (*)

Study period: 1996

Construction details

General contractor: ARXITEX SA

Construction period: 1996

Construction status: in operation

Short description of project-services

New Casino making in an existing Hotel Build-ing in Porto Carras Grand Resort.

Google

metrics

Buildings surface: 1.500m2

Plot size: m2

Mep budget: 2.000.000 €

(*) co-designer 33% for planning

Page 39: Cambicci Associates Portfolio

Company profile 2012

page 39 out of 129

Smal l Hote l i n Santor in i , G reece

Project owner

Project design parties

Project management

Architectural study

I.Vlahos

Structural study

Mep study

Y. Cambicci (*)

Study period: 2000

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

Small Hotel Construction in Fira, Santorini, Greece.

Google

metrics

Buildings surface: 700m2

Plot size: 8.000m2

Mep budget: 400.000 €

(*) co-designer 50% for planning

Page 40: Cambicci Associates Portfolio

Cambicci+Associates

page 40

This page was intentionally left blank

Page 41: Cambicci Associates Portfolio

Company profile 2012

page 41 out of 129

ΕΕΕddduuucccaaatttiiiooonnn

Page 42: Cambicci Associates Portfolio

Cambicci+Associates

page 42

Extens ion o f the Pedagogy Depar tment o f the Ar i s to t le Un ivers i ty o f Thessa lon ik i

Project owner

Aristotle University of Thessaloniki

Project design parties

Architectural study

Ν.Kalogirou Professor Dpt. Arch. Α.U.Th. Α.Vasiliadis,Κ.Giatas,D.Koliakos,L.Mavridis

Structural study

Κ.Stylianidis Professor Dpt. Civ.Eng. Α.U.Th. Ch.Ignatakis Professor Dpt. Civ.Eng. Α.U.Th. S.Baxevanis

Mep construction study

Cambicci+Assoc iates Mep study consultant: Κ.Andreou Lecturer Dpt.

El.Eng. Α.U.Th.

Mep study advisor

Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th.

Study period: 2010

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

The project scope was the costruction study for the expansion of the pedagogy Department of the A.U.Th with the addition of two new teach-ing room wards as well as an auditorium

Google

metrics

Buildings surface: 18.500m2

Plot size: 10.000m2

Mep budget: 5.500.000 €

Page 43: Cambicci Associates Portfolio

Company profile 2012

page 43 out of 129

A.U .Th Congress Ha l l i n Po ly techn ic Schoo l , Greece

Project owner

Company for the exploitation of A.U.Th. Real Estate

Project design parties

Project management

A.U.Th TD

Architectural study

ΝΙΜΑΝD Architects

Structural study

Ι.Poulios

Mep study

Cambicci+Assoc iates

Study period: 2009

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

The project scope was the construction study and the compilation of auction documents for the renovation of the existing central auditori-ums of the Polytechnic School and the con-struction of a modern conference center in

U.A.T. Google

metrics

Buildings surface: 3.200m2

Plot size: m2

Mep budget: 1.000.000 €

Page 44: Cambicci Associates Portfolio

Cambicci+Associates

page 44

L ight ing o f the A .U .Th Ph i losophy Depar tment

Project owner

A.U.Th

Project design parties

Project management

A.U.Th TD

Architectural study

Ν.Μ.Andreadi Professor Dept.Arch.A.U.th.

Mep study

Cambicci+Assoc iates

Lighting design

G-Lights - M.Gourogiannis

Study period: 2010

Construction details

General contractor:

Construction period:

Construction status: ongoing

Short description of project-services

The project scope is the architectural lighting of the facades of the landmark building of the Philosophy Dept of the A.U. of Thessaloniki.

Google

metrics

Buildings surface: m2

Plot size: 4.000m2

Mep budget: 500.000 €

Page 45: Cambicci Associates Portfolio

Company profile 2012

page 45 out of 129

Bisse l l Co l l ege L ib rary in Thessa lon ik i , G reece

Project owner

Board of the American College of Thessaloniki

Project design parties

Project management

P.Makridis

Architectural study

P.Makridis + Associates

Structural study

Mep study

Y. Cambicci (*)

Study period: 1996

Construction details

General contractor: DOMOTECHNIKI SA

Construction period: 1997-1998

Construction status: in operation

Short description of project-services

New Library Building in American College of Thessaloniki.

Google

metrics

Buildings surface: 4.000m2

Plot size: 10.000m2

Mep budget: 2.150.000 €

(*) co-designer 33% for planning

Page 46: Cambicci Associates Portfolio

Cambicci+Associates

page 46

Reconst ruc t ion o f p r i va te schoo l in Thessa lon ik i , G reece

Project owner

American College ‘Anatolia’ of Thessaloniki

Project design parties

Project management

P.Makridis

Architectural study & construction supervision

P.Makridis + Associates SA

Structural study

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor:

Construction period: 2010

Construction status: in operation

Short description of project-services

Elaboration of the construction study and the cost analysis reports.

Google

metrics

Buildings surface: 1.500m2

Plot size: 20.000m2

Mep budget: 300.000 €

Page 47: Cambicci Associates Portfolio

Company profile 2012

page 47 out of 129

HHHeeeaaalllttthhh

Page 48: Cambicci Associates Portfolio

Cambicci+Associates

page 48

Rehab i l i t a t ion Cent re in Ser res , Greece

Project owner

ANANEOSI SA

Project design parties

Project management

SYNTHESIS SA

Architectural study

ΜΜΤ SA

Structural study

ΜΜΤ SA

Mep study

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor:

Construction period: 2009

Construction status: in operation

Short description of project-services

The project scope was the study of a rehabili-tation center in the municipality of Emmanouil Pappas in Serres.

Google

metrics

Buildings surface: 5.200m2

Plot size: 6.700m2

Mep budget: 2.000.000 €

Page 49: Cambicci Associates Portfolio

Company profile 2012

page 49 out of 129

Renovat ion o f the B lue Cross C l in i c in Thessa lon ik i , G reece

Project owner

EUROMEDICA SA ‘KIANOYS STAYROS’ SA

Project design parties

Project management

EUROMEDICA TD

Architectural study

POLIS SA, MEIONENA

Structural study

K.Makedos

Mep study

Y. Cambicci (*)

Study period: 2000-2001

Construction details

General contractor: AKTOR SA

Construction period: 2001-2002

Construction status: in operation

Short description of project-services

Tottaly reconstruction of a major clinik in Thes-saloniki.

Google

metrics

Buildings surface: 5.800m2

Plot size: 1.300m2

Mep budget: 3.000.000 €

(*) co-designer 33% for planning

Page 50: Cambicci Associates Portfolio

Cambicci+Associates

page 50

Cent ra l MEP Ins ta l l a t ions renovat ion a t P r i va te Genera l C l in i c in Thessa lon ik i

Project owner

EUROMEDICA SA GENIKI KLINIKI SA

Project design parties

Project management

EUROMEDICA TD

Architectural study

Structural study

Mep study

Y. Cambicci (*)

Study period: 2001-2002

Construction details

General contractor: ERGO3

Construction period: 2002-2003

Construction status: in operation

Short description of project-services

Reconstruction of the central MEP networks in a general clinik in Thessaloniki.

Google

metrics

Buildings surface: 8.000m2

Plot size: 1.800m2

Mep budget: 1.000.000 €

(*) co-designer 33% for planning

Page 51: Cambicci Associates Portfolio

Company profile 2012

page 51 out of 129

New Surgery and Admin i s t ra t ion Bu i ld ing in AHEPA Hosp i ta l i n Thessa lon ik i , G reece

Project owner

Ministry of Health

Project design parties

Project management

AHEPA TD

Architectural study

X.Kouloukouris,A.Tseranidis Ε.Ε. TROPALIS E.T.E.

Structural study

Mep study

Y. Cambicci (*)

Study period: 2001-2002

Construction details

General contractor:

Construction period:

Construction status: postponed

Short description of project-services

New Surgeries, Central Sterilise Department, Intensive Care Department and administration building for a General Hospital in Thessaloniki.

Google

metrics

Buildings surface: 5.800m2

Plot size: m2

Mep budget: 5.600.000 €

(*) co-designer 33% for planning

Page 52: Cambicci Associates Portfolio

Cambicci+Associates

page 52

E .D . and B lood Donat ion Cent re a t Ippokra te io Hosp i ta l i n Thessa lon ik i , G reece

Project owner

DEPANOM SA

Project design parties

Project management

J&P AVAX SA

Architectural study

METE SYSM SA

Structural study

METE SYSM SA

Mep study

Y. Cambicci (*)

Study period: 2004

Construction details

General contractor: J&P-AVAX SΑ

Construction period: 2004-2006

Construction status: in operation

Short description of project-services

Reconstruction of existing building for emer-gency department and making of a new build-ing for blood donation center.

Google

metrics

Buildings surface: 2.500m2

Plot size: m2

Mep budget: 1.100.000 €

(*) co-designer 33% for planning

Page 53: Cambicci Associates Portfolio

Company profile 2012

page 53 out of 129

SSShhhoooppppppiiinnnggg mmmaaallllllsss &&& RRReeetttaaaiiilll ssstttooorrreeesss

Page 54: Cambicci Associates Portfolio

Cambicci+Associates

page 54

Shopp ing Center a t Xanth i , G reece

Project owner

ALPHA RETAIL PARKS SA

Project design parties

Project management

Leonidas Athanasiadis

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Mep study

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2009-2010

Construction status: in operation

Short description of project-services

New Shopping Center Flamingo in Xanthi.

Google

metrics

Buildings surface: 18.500m2

Plot size: 80.000m2

Mep budget: 2.200.000 €

Page 55: Cambicci Associates Portfolio

Company profile 2012

page 55 out of 129

Hypermarket a t Xanth i , G reece

Project owner

PRAKTIKER HELLAS ΑΕ

Project design parties

Project management

Leonidas Athanasiadis

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Mep study

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2009-2010

Construction status: in operation

Short description of project-services

Hypermarket in Flamingo Shopping Center in Xanthi. The fire study was inspected and ap-proved by VdS.

Google

metrics

Buildings surface: 4.500m2

Plot size: 5.500m2

Mep budget: 1.200.000 €

Page 56: Cambicci Associates Portfolio

Cambicci+Associates

page 56

Eas t Thessa lon ik i Shopp ing Center

Project owner

ΦΑΜ ΑΕ

Project design parties

Development, Project & Construction management

Alexander Kalatzis

Architectural study

S.Suchomel-Τ.Kalatzis-Μ.kalatzis

Structural study

G.Papargyris-A.Kardoula & Associates

Mep study

Cambicci+Assoc iates

Study period: 2009

Construction details

General contractor: ΜΑΚΤ SΑ

Construction period: 2009-2010

Construction status: in operation

Short description of project-services

New Shopping Center East Plazza in eastern Thessaloniki.

Google

metrics

Buildings surface: 9.300m2

Plot size: 30.000m2

Mep budget: 1.800.000 €

Page 57: Cambicci Associates Portfolio

Company profile 2012

page 57 out of 129

Eas t Thessa lon ik i Hypermarket

Project owner

SATURN-MEDIA MARKT ΑΕ

Project design parties

Project management

MAKT SA-LDK SΑ

Interior Architectural study

LDK ΑΕ

Mep study

LDK SΑ - Cambicci+Assoc iates

Mep construction supervision

LDK SΑ - Cambicci+Assoc iates

Study period: 2009

Construction details

General contractor: ΜΑΚΤ SA

Construction period: 2009-2010

Construction status: in operation

Short description of project-services

Fire safety construction study and MEP super-vision in Saturn Hypermarket in east Thessalo-niki.

Google

metrics

Buildings surface: 6.400m2

Plot size: m2

Mep budget: 1.400.000 €

Page 58: Cambicci Associates Portfolio

Cambicci+Associates

page 58

West Thessa lon ik i Hypermarket

Project owner

HELLINIKI ETERIA IDIOKATASKEVON SA

Project design parties

Project management

ECC Engineering Construction Consulting SA

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Mep study

Cambicci+Assoc iates

Study period: 2009

Construction details

General contractor:

Construction period:

Construction status: under development

Short description of project-services

Mep study for making of a new hypermarket in Western Thessaloniki.

Google

metrics

Buildings surface: 10.300m2

Plot size: 49.000m2

Mep budget: 1.600.000 €

Page 59: Cambicci Associates Portfolio

Company profile 2012

page 59 out of 129

Hypermarket in T i rana , A lban ia

Project owner

Megatek ShA

Project design parties

Project management

Dionis Teqja

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Mep study

Cambicci+Assoc iates

Study period: 2007

Construction details

General contractor: ZAlba SA

Construction period: 2008-2009

Construction status: in operation

Short description of project-services

Retail & Whole Sale Building for MEGATEK ShA and new office bulding for DIONIS TEQJA Companies in Tirana-Durred Highway in Alba-nia.

Google

metrics

Buildings surface: 25.200m2

Plot size: 75.000m2

Mep budget: 2.600.000 €

Page 60: Cambicci Associates Portfolio

Cambicci+Associates

page 60

Hypermarket in Lar i ssa , Greece

Project owner

HELLINIKI ETERIA IDIOKATASKEVON SA

Project design parties

Project management

Focal Project Managers

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Initial mep study

Α.Koutsikos SA

Mep construction study

Cambicci+Assoc iates

Study period: 2008-2009

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2009

Construction status: in operation

Short description of project-services

Modofications in construction study for a new hypermarket in Larissa Greece.

Google

metrics

Buildings surface: 7.900m2

Plot size: 38.000m2

Mep budget: 1.400.000 €

Page 61: Cambicci Associates Portfolio

Company profile 2012

page 61 out of 129

Hypermarket in Vo los , Greece

Project owner

MAKRO Cash & Carry SA

Project design parties

Project management

John Ninos

Architectural study & construction supervision

archigraph architecture_interiors

Structural study & construction supervision

Statoras

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2007

Construction details

Gen. contractor:ΑRΧΙΚΟΝ SA-ANAPLASEON SA

Construction period: 2008

Construction status: in operation

Short description of project-services

Mep Study and construction supervision for a new makro hypermarket in Volos, Greece.

Google

metrics

Buildings surface: 4.200m2

Plot size: 29.000m2

Mep budget: 1.000.000 €

Page 62: Cambicci Associates Portfolio

Cambicci+Associates

page 62

Hypermarket in Ver ia , Greece

Project owner

Kalpakis Panagiotis Co

Project design parties

Initial Architectural study

A.Sidiropoulos

Construction Architectural study

Κ.Papastergiou

Structural study

S.Diamantopoulos

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2007

Construction details

General contractor: EGERSIS Limited

Construction period: 2007-2008

Construction status: in operation

Short description of project-services

New factory and sales center for Kalpakis De-sign Company in Veria, Greece.

Google

metrics

Buildings surface: 5.800m2

Plot size: 5.200m2

Mep budget: 1.500.000 €

Page 63: Cambicci Associates Portfolio

Company profile 2012

page 63 out of 129

Hypermarket in Xanth i , G reece

Project owner

MAKRO Cash & Carry SA

Project design parties

Project management

Leonidas Athanasiadis

Architectural study & construction supervision

archigraph architecture_interiors

Structural study & construction supervision

Statoras

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2006-2007

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2008

Construction status: in operation

Short description of project-services

Mep Study and construction supervision for a new makro hypermarket in Xanthi, Greece

Google

metrics

Buildings surface: 4.200m2

Plot size: 22.800m2

Mep budget: 1.000.000 €

Page 64: Cambicci Associates Portfolio

Cambicci+Associates

page 64

Shopp ing center in Thessa lon ik i , G reece

Project owner

Carrefour Hellas SA

Project design parties

Development, Project & Cosntruction management

MAKT SA – Alexander Kalatzis

Architectural construction supervision

S.Vergopoulos, N.Dimtsas

Structural construction supervision

G.Papargyris

Mep construction supervision

Cambicci+Assoc iates

Study period: 1998-1999

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 1999-2000

Construction status: in operation

Short description of project-services

MAKEDONIA Major Shopping Center in Thessa-loniki. In the center exists Carrefour Hyper-market, Cinema Complex, Shopping Mall, and Recreational area building.

Google

metrics

Buildings surface: 35.000m2

Plot size: 140.000m2

Mep budget: 4.800.000 €

Page 65: Cambicci Associates Portfolio

Company profile 2012

page 65 out of 129

West Thessa lon ik i Hypermarket

Project owner

MAKRO Cash & Carry SA

Project design parties

Project management

Leonidas Athanasiadis

Architectural study & construction supervision

archigraph architecture_interiors

Structural study & construction supervision

Statoras

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2004

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2004-2005

Construction status: in operation

Short description of project-services

Mep Study and construction supervision for a new makro hypermarket in Western Thessalo-niki Area, Greece.

Google

metrics

Buildings surface: 4.200m2

Plot size: 22.000m2

Mep budget: 1.000.000 €

Page 66: Cambicci Associates Portfolio

Cambicci+Associates

page 66

Eas t Thessa lon ik i E lec t r i ca l Hypermarket

Project owner

ΤΑΚ AE

Project design parties

Development, Project & Construction management

MAKT SA - Alexander kalatzis

Architectural study

Μ.Kalatzis-Τ.Kalatzi-S.Suchomel

Structural study & construction supervision

G.Papargyris

Mep construction supervision

Cambicci+Assoc iates

Study period: 2005

Construction details

General contractor: ΜΑΚΤ SΑ

Construction period: 2004-2005

Construction status: in operation

Short description of project-services

Mep construction supervision for a new hyper-market in Thessaloniki.

Google

metrics

Buildings surface: 7.200m2

Plot size: 17.500m2

Mep budget: 900.000 €

Page 67: Cambicci Associates Portfolio

Company profile 2012

page 67 out of 129

Hypermarket in Thessa lon ik i , G reece

Project owner

Diagonios SA

Project design parties

Project management

Architectural study

A.N Tombazis & Associates Architects- P.Makridis+Associates

Structural study

Ι.Poulios

Mep study

Y. Cambicci (*)

Study period: 2000

Construction details

General contractor: DIAGONIOS SA

Construction period: 2001

Construction status: in operation

Short description of project-services

New Shopping center EUROTECH for building materials stores in eastern Thessaloniki area.

Google

metrics

Buildings surface: 8.000m2

Plot size: 20.000m2

Mep budget: 1.300.000 €

(*) co-designer 33% for planning

Page 68: Cambicci Associates Portfolio

Cambicci+Associates

page 68

Duty F ree Shops in Border S ta t ions

Project owner

Hellenic Duty Free Shops SA

Project design parties

Project management

Architectural study

POLIS SA, G.Vlahos

Structural study

Concept SA

Mep study

Y. Cambicci (*)

Study period: 2004

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

New stores for Hellenic Duty Free Shops in Greece Border Stations at Kakavia, Promahona Rhodes Airport and Katakolo port (construction postponed).

Google 1 2 3 4 5

metrics

Buildings surface: 5.000m2

Plot size: m2

Mep budget: 650.000 €

(*) co-designer 33% for planning

Page 69: Cambicci Associates Portfolio

Company profile 2012

page 69 out of 129

   

RRReeecccrrreeeaaatttiiiooonnn

Page 70: Cambicci Associates Portfolio

Cambicci+Associates

page 70

Restaurant in Thessa lon ik i , G reece

Project owner

Clochard Restaurant

Project design parties

Project management

Architectural study & construction supervision

P.Makridis+Associates SA

Structural study

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2007

Construction details

General contractor:

Construction period: 2008

Construction status: in operation

Short description of project-services

Restaurant reconstruction in Thessaloniki cen-ter.

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: €

Page 71: Cambicci Associates Portfolio

Company profile 2012

page 71 out of 129

Café & Res taurant in T i rana , A lban ia

Project owner

Albanian restaurants Sha

Project design parties

Project management

Vivartia TD-Goodys

Architectural study

archigraph architecture_interiors

Structural study

Mep study

Cambicci+Assoc iates

Study period: 2007

Construction details

General contractor:

Construction period: :

Construction status: postponed

Short description of project-services

Goodys & Flocafé stores in MEGATEK shopping center in Tirana Albania.

Google

metrics

Buildings surface: 800m2

Plot size: m2

Mep budget: 250.000 €

Page 72: Cambicci Associates Portfolio

Cambicci+Associates

page 72

This page was intentionally left blank

Page 73: Cambicci Associates Portfolio

Company profile 2012

page 73 out of 129

SSSpppooorrrtttsss

Page 74: Cambicci Associates Portfolio

Cambicci+Associates

page 74

Renovat ion o f Toumpa area in Thessa lon ik i , G reece

Project owner

Municipality of Thessaloniki

Project design parties

Project management

Thessaloniki Organisation

Architectural study

A.Panos M.Papadakis Architects, DEKATHLON SA

Structural study

Concept Engineers

Mep study

Y. Cambicci (*)

Study period: 2004

Construction details

General contractor:

Construction period: 2005-2008

Construction status: in operation

Short description of project-services

Open swimming pool, new cultural center, in Alana tis Toumpas area of Thessaloniki.

Google

metrics

Buildings surface: 7.200m2

Plot size: 33.000m2

Mep budget: 2.700.000 €

(*) co-designer 33% for planning

Page 75: Cambicci Associates Portfolio

Company profile 2012

page 75 out of 129

Indoor swimming poo l f ac i l i t y in Ver ia , Greece

Project owner

Municipality of Veria

Project design parties

Project management

Evripos SA

Architectural study

PETRA SINERGATIKI Consulting Engineers

Structural study

Concept Consulting Engineers

Mep study

Y. Cambicci (*)

Study period: 2006

Construction details

General contractor: EVRIPOS SA

Construction period:

Construction status: postponed

Short description of project-services

New major indoor swimming pool facility in Veria sports center.

Google

metrics

Buildings surface: 11.000m2

Plot size: 28.000m2

Mep budget: 2.200.000 €

(*) co-designer 33% for planning

Page 76: Cambicci Associates Portfolio

Cambicci+Associates

page 76

Ar t i f i c i a l l akes complex in Ka lamar ia , Thessa lon ik i

Project owner

Municipality of Kalamaria

Project design parties

Project management

Municipality of Kalamaria TD

Architectural study

Stamatis Koukopoulos

Structural study

Mep study

Cambicci+Assoc iates

Study period: 1999

Construction details

General contractor:

Construction period:

Construction status: cancelled

Short description of project-services

Outdoor major swimming pool and icetrack in Kalamaria, Thessaloniki, Greece.

Google

metrics

Buildings surface: 3.500m2

Plot size: 19.000m2

Mep budget: 1.200.000 €

Page 77: Cambicci Associates Portfolio

Company profile 2012

page 77 out of 129

HHHooouuusssiiinnnggg

Page 78: Cambicci Associates Portfolio

Cambicci+Associates

page 78

VIP V i l l a in Pe fkochor i Ha lk id ik i , G reece

Project owner

Project design parties

Project management

ΜΜΤ SA

Architectural study & construction supervision

Peter Schellinger Ε.Tzekakis, N.Manou-Andreadis

R.Papadakis, D.Aristotelidis

Structural study

Ι.Poulios

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2011

Construction details

General contractor:

Construction period: 2011-ongoing

Construction status: under construction

Short description of project-services

VIP Villas complex in Pefkochori Halikidiki, Greece.

Google

metrics

Buildings surface: 700m2

Plot size: 16.000m2

Mep budget: 1.000.000 €

Page 79: Cambicci Associates Portfolio

Company profile 2012

page 79 out of 129

Two count ry v i l l as a t Sk ia thos Is land , Greece

Project owner

Project design parties

Project management

P.Makridis+Associates SA

Architectural study & construction supervision

P.Makridis+Associates SA Petros Makridis

Thodoris Makridis Eleana Makridis

Structural study

Mep study & construction supervision

Cambicci+Assoc iates

Study period: 2010

Construction details

General contractor:

Construction period: 2012

Construction status: under construction

Short description of project-services

Two country villas in Skiathos town area.

Google

Μετρητικά στοιχεία

Buildings surface: 220m2

Plot size: 4.000m2

Mep budget: €

Page 80: Cambicci Associates Portfolio

Cambicci+Associates

page 80

Of f i ces & Houses Complex in Metaxourg io A thens , Greece

Project owner

GEK SA

Project design parties

Project management

Architectural study

Tsigarida Architects

Structural study

Α.Xenos

Mep study

Cambicci+Assoc iates

Study period: 2006

Construction details

General contractor:

Construction period:

Construction status:

Short description of project-services

1st prize in architectural contest in Metaxourgeio area in Athens, Greece

metrics

Buildings surface: m2

Plot size: m2

Mep budget: €

Page 81: Cambicci Associates Portfolio

Company profile 2012

page 81 out of 129

Vi l l a in Mo l i vos , Lesvos Is land , Greece

Project owner

Project design parties

Project management

Architectural study

Tsigarida Architects

Structural study

Mep study

Cambicci+Assoc iates

Study period: 1999

Construction details

General contractor:

Construction period:

Construction status:

Short description of project-services

Country Villa at Molivos in Lesvos Island, Greece.

Google

Μετρητικά στοιχεία έργου

Buildings surface: 150m2

Plot size: 4.000m2

Mep budget: €

Page 82: Cambicci Associates Portfolio

Cambicci+Associates

page 82

Vi l l a in Po t ida ia Ha lk id ik i , G reece

Project owner

Project design parties

Project management

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Mep study

Cambicci+Assoc iates

Study period: 2009

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

A seaside villa in Halkidiki, Greece

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: €

Page 83: Cambicci Associates Portfolio

Company profile 2012

page 83 out of 129

P lag ia r i S .O .S . v i l l age fo r o rphan ch i ld ren in Thessa lon ik i , G reece

Project owner

SOS Village for Northern Greece

Project design parties

Project management

Architectural study

P.Makridis+Associates

Structural study

Mep study

Y. Cambicci (*)

Study period: 1999

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

MEP Study for a full village construction, com-posed of houses, main multipurpose building, sports areas, roads and infrastructure.

Google

metrics

Buildings surface: 4.000m2

Plot size: 13.000m2

Mep budget: 1.100.000 €

(*) co-designer 33% for planning

Page 84: Cambicci Associates Portfolio

Cambicci+Associates

page 84

P ress V i l l age fo r A thens O lympic Games in Marous i A thens , Greece

Project owner

Municipality of Amarousion

Project design parties

Project management

Architectural study

Structural study

Mep study

Y. Cambicci (*)

Study period: 1999

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

Complete mep study for village buildings made for the Olympic Games.

Google

metrics

Buildings surface: 8.000m2

Plot size: 30.000m2

Mep budget: €

(*) co-designer 50% for planning

Page 85: Cambicci Associates Portfolio

Company profile 2012

page 85 out of 129

UUUrrrbbbaaannn

Page 86: Cambicci Associates Portfolio

Cambicci+Associates

page 86

Whi te Tower square renovat ion in Thessa lon ik i , G reece

Project owner

Municipality of Thessaloniki

Project design parties

Project management

Architectural study

Tsigarida Architects

Mep study

Y. Cambicci (*)

Lighting design

Duillio Passariello Li-Dac Philips

Study period: 2005

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

Mep study for the square of White tower, sym-bol of the city of Thessaloniki.

Google

metrics

Buildings surface: 100m2

Plot size: 18.000m2

Mep budget: 500.000 €

(*) co-designer 33% for planning

Page 87: Cambicci Associates Portfolio

Company profile 2012

page 87 out of 129

Kefa la r i sp r ings a rea in Drama, Greece

Project owner

DEPOS SΑ

Project design parties

Project management

DEPOS SA

Architectural study

George Triantafyllidis

Structural study

Mep study

Y. Cambicci (*)

Study period: 2005

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

Google

metrics

Buildings surface: 500m2

Plot size: 16.000m2

Mep budget: 900.000 €

(*) co-designer 50% for planning

Page 88: Cambicci Associates Portfolio

Cambicci+Associates

page 88

He l len i c garden in garden ing EXPO in Ch ina

Project owner

HELEXPO SA

Project design parties

Project management

HELEXPO SA

Architectural study

P.Nikiforidis, B.Cuomo

Structural study

Mar ia Stefanour i

Mep study

Y. Cambicci (*)

Study period: 2006

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

A garden for Shen Yang China International Hogricultural Exposition 2006.

Google

metrics

Buildings surface: m2

Plot size: 1.200m2

Mep budget: €

(*) co-designer 50% for planning

Page 89: Cambicci Associates Portfolio

Company profile 2012

page 89 out of 129

Refurb i shment o f the new promenade o f Thessa lon ik i , G reece

Project owner

Municipality of Thessaloniki

Project design parties

Architectural study

P.Nikiforidis, B.Cuomo, Atelier R.Castro-S.Denissof

Structural study

I.Lavasas-M.Stefanouri

Plants & trees arrangement study

I lor ik i

Mep study

Y. Cambicci (*)

Study period: 2006

Construction details

General contractor: SIDIRODROMIKA ERGA SA

Construction period: phase A+B: 2006-2008 Phase C: 2011-ongoing

Construction status: 50% in operation 50% under construction

Short description of project-services

Full renovation of Thessaloniki promenade.

Google

metrics

Buildings surface: m2

Plot size: 280.000m2

Mep budget: 6.000.000 €

(*) co-designer 33% for planning

Page 90: Cambicci Associates Portfolio

Cambicci+Associates

page 90

This page was intentionally left blank

Page 91: Cambicci Associates Portfolio

Company profile 2012

page 91 out of 129

IIInnnddduuussstttrrriiiaaalll OOOiiilll &&& GGGaaasss iiinnnssstttaaallllllaaatttiiiooonnnsss

Page 92: Cambicci Associates Portfolio

Cambicci+Associates

page 92

E lec t r i ca l sys tems manufac tur ing fac to ry in Ka lohor i , Thessa lon ik i , G reece

Project owner

SIAFARAS ELECTRICAL SYSTEMS SA

Project design parties

Architectural study

archigraph architecture_interiors

Structural study

Statoras

Mep study

Cambicci+Assoc iates

Energy study

Energy Technologies ΕΝΤΕ

Study period: 2008-2009

Construction details

General contractor: FRIGOSTAHL SΑ

Construction period: 2010-2011

Construction status: under construction

Short description of project-services

Expansion of existing factory in Thessaloniki

Google

metrics

Buildings surface: 4.200m2

Plot size: 10.000m2

Mep budget: 800.000 €

Page 93: Cambicci Associates Portfolio

Company profile 2012

page 93 out of 129

New fac tory -mi l l i n S indos indus t r ia l a rea , Greece

Project owner

E.DI.V.E. SA (Allatini Mill)

Project design parties

Project management

Architectural study

P.Makridis+Associates

Structural study

Mep study

Y.Cambicci (*)

Study period: 1995-1998

Construction details

Gen. contractor: ΕLLINIKI TECHNODOMIKI SA ΤΕΚ THESSALONIKI SΑ

Construction period: 1997-1998

Construction status: in operation

Short description of project-services

Mep study & supervision for a new factory in Sindos area.

Google

metrics

Buildings surface: 9.100m2

Plot size: 33.000m2

Mep budget: 1.200.000 €

(*) co-designer 33% for planning

Page 94: Cambicci Associates Portfolio

Cambicci+Associates

page 94

Car repa i r depot

Project owner

Municipality of Thessaloniki

Project design parties

Project management

ΑΡΧΙΤΕΧ SA

Architectural study

Anthi Katsika

Structural study

Parisis Mpillias

Mep study

Y.Cambicci (*)

Study period: 2004

Construction details

General contractor: ARXITEX SA

Construction period: 2004

Construction status: in operation

Short description of project-services

New car repair depot for Thessaloniki munici-pality.

Google

metrics

Buildings surface: 5.300m2

Plot size: 4.700m2

Mep budget: 900.000 €

(*) co-designer 50% for planning

Page 95: Cambicci Associates Portfolio

Company profile 2012

page 95 out of 129

F i shery p rocess ing fac tory in Kava la indus t r ia l a rea , Greece

Project owner

TRIFONIDIS SA

Project design parties

Project management

Architectural study

archigraph architecture_interiors

Structural study

G.Papargyris-A.Kardoula

Mep study

Y.Cambicci (*)

Study period: 2002

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 2003

Construction status: in operation

Short description of project-services

New factory in Kavala area.

Google

metrics υ

Buildings surface: 3.200m2

Plot size: 12.000m2

Mep budget: 500.000 €

(*) co-designer 50% for planning

Page 96: Cambicci Associates Portfolio

Cambicci+Associates

page 96

Furn i tu re fac tory in Kava la r i , Thessa lon ik i , G reece

Project owner

N.KARAPIPERIDIS-S.PARITSIS Co

Project design parties

Project management

Architectural study

archigraph architecture_interiors

Structural study

G.Papargyris-A.Kardoula

Mep study

Y.Cambicci (*)

Study period: 2003

Construction details

General contractor:

Construction period: 2003

Construction status: in operation

Short description of project-services

New factory in Langadas area.

Google

metrics

Buildings surface: 1.500m2

Plot size: 7.000m2

Mep budget: 200.000 €

Page 97: Cambicci Associates Portfolio

Company profile 2012

page 97 out of 129

New meat fac tory in F lo r ina , Greece

Project owner

VASILEIOS SAVVOPOULOS SA

Project design parties

Project management

Leonidas Athanasiadis

Architectural study

archigraph architecture_interiors

Structural study

G.Papargyris-A.Kardoula

Mep study

Y.Cambicci (*)

Study period: 1997

Construction details

General contractor: ZINON ATHANASIADIS SA

Construction period: 1997

Construction status: in operation

Short description of project-services

New factory in Florina area.

Google

metrics

Buildings surface: 2.000m2

Plot size: 8.000m2

Mep budget: 500.000 €

(*) co-designer 33% for planning

Page 98: Cambicci Associates Portfolio

Cambicci+Associates

page 98

This page was intentionally left blank

Page 99: Cambicci Associates Portfolio

Company profile 2012

page 99 out of 129

IIInnnfffrrraaassstttrrruuuccctttuuurrreee

Page 100: Cambicci Associates Portfolio

Cambicci+Associates

page 100

Pot ida ia new H ighway Br idge in Ha lk id ik i , G reece

Project owner

EGNATIA ODOS SA

Project design parties

Project management

HELLINIKI TECHNODOMIKI SA

Συγκοινωνιακή μελέτη

GEOGNOSI SA

Structural study

VSL Systems AE

Mep study

Y.Cambicci (*)

Study period: 2001

Construction details

Gen. contractor: ELLINIKI TECHNODOMIKI SA

Construction period: 2001

Construction status: in operation

Short description of project-services

New potidaia bridge with connecting highway in Halkidiki.

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: €

(*) co-designer 50% for planning

Page 101: Cambicci Associates Portfolio

Company profile 2012

page 101 out of 129

Cut & Cover underground tunne l in Thessa lon ik i -M ichan iona Avenue

Project owner

Region of Central Makedonia

Project design parties

Project management

Συγκοινωνιακή μελέτη

DIKTYO SA

Structural study

ΜΕΤΕ SYSM SA

Mep study

Y.Cambicci (*)

Study period: 2002

Construction details

General contractor:

Construction period:

Construction status: postponed

Short description of project-services

Preliminary mep study for a 3 lanes carriage-way tunnel, 314m long, in MAKEDONIA Airport area.

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: 3.000.000 €

(*) co-designer 50% for planning

Page 102: Cambicci Associates Portfolio

Cambicci+Associates

page 102

Water t rea tment fasc i l i t y fo r Kozan i indus t r ia l a rea

Project owner

Prefecture of Kozani

Project design parties

Project management

ENCO Co

Χημικοτεχνική μελέτη

ENCO Co

Structural study

Kostas Chatzis

Mep study

Cambicci+Assoc iates

Study period: 2008

Construction details

General contractor: ITHAKI SA-MESOGEOS SA

Construction period: 2008

Construction status: in operation

Short description of project-services

Renovation and expansion of water treatment fascility center for an industrial area.

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: 500.000 €

Page 103: Cambicci Associates Portfolio

Company profile 2012

page 103 out of 129

Water t rea tment fasc i l i t y fo r Amynta io , Greece

Project owner

Municipality of Amyntaio

Project design parties

Project management

ENCO CO

Chemical study

ENCO CO

Structural study

Kostas Chatzis

Mep study

Cambicci+Assoc iates

Study period: 2007

Construction details

General contractor: DISTILOS SA

Construction period: 2007

Construction status: in operation

Short description of project-services

Renovation and expansion of water treatment fascility center.

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: 650.000 €

Page 104: Cambicci Associates Portfolio

Cambicci+Associates

page 104

I r r iga t ion ne twork o f Mess ian i , Kozan is , Greece

Project owner

Prefecture of Kozani

Project design parties

Project management

Anaptixiaki Kozanis

Hydraulic study

Horotechniki SA

Structural study

Akis Mystakidis

Mep study

Y.Cambicci (*)

Study period: 1998

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

Pump stations for irrigation networks.

Google

metrics

Buildings surface: m2

Plot size: m2

Mep budget: €

(*) co-designer 33% for planning

Page 105: Cambicci Associates Portfolio

Company profile 2012

page 105 out of 129

ΕΕΕnnneeerrrgggyyy

Page 106: Cambicci Associates Portfolio

Cambicci+Associates

page 106

Town Ha l l o f Py la ia

Project owner

Municipality of Pylaia

Project design parties

Architectural study

K.Antoniou,E.Kastro,E.Disli,N.Barbari

Structural study

K.Anastasiadis, P.Panetsos

Mep study

Y. Cambicci (*)

Mep study advisor

Dr K.Pattas AUTh Proffessor

Study period: 1994-1996

Construction details

General contractor:

Construction period: 1997-2000

Construction status: in operation

Short description of project-services

The first office building with geo-thermal ex-changers in Greece with Water to water Sourse Heat Pumps in coordination with the Mechani-cal Department of A.U.Th.

Google

(*) co-designer 33% for planning

Page 107: Cambicci Associates Portfolio

Company profile 2012

page 107 out of 129

Two V i l l as in Thermi , Greece

Project owner

Project design parties

Architectural study

Structural study

Mep study

Y. Cambicci (*)

Geothermie systems advisor

I.Mpousgolitis

Study period: 2004

Construction details

General contractor:

Construction period:

Construction status: in operation

Short description of project-services

Two villas with sophisticated water to water heat pumps network and geothermal exchang-ers.

Google

(*) co-designer 50% for planning

Page 108: Cambicci Associates Portfolio

Cambicci+Associates

page 108

Res ident ia l Photovo l ta i c sys tems des ign

Project owner

Project design parties

Photovoltaic system study

Cambicci+Assoc iates

Study period: 2010-ongoing

Short description of project-services

Connected residential photovoltaic systems in northern and central Greece Systems installed power: 5 up to 10 kWp each Total installed power: 165kWp System status: in operation

Page 109: Cambicci Associates Portfolio

Company profile 2012

page 109 out of 129

Major photovo l ta i c sys tems

Project owner

Project design parties

Photovoltaic system study

Cambicci+Assoc iates

Study period: 2011-ongoing

Short description of project-services

Connected photovoltaic systems, on rooftops and ground in northern and central Greece Systems installed power: 100 έως 2.000 kWp Total installed power: 2.400kWp System status: in various construction phases

Page 110: Cambicci Associates Portfolio

Cambicci+Associates

page 110

This page was intentionally left blank

Page 111: Cambicci Associates Portfolio

Company profile 2012

page 111 out of 129

SSSeeecccuuurrriiitttyyy

Page 112: Cambicci Associates Portfolio

Cambicci+Associates

page 112

Bank o f Greece Bu i ld ing in Thessa lon ik i , G reece

Project owner

Bank of Greece SA

Project design parties

Construction manager

Decathlon SA, D.Papazoglou

Architectural study & construction supervision

P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis

Structural study and construction supervision

Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos

Mep study and construction supervision

Y. Cambicci BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos

Study period: 2004-2006

Construction details

General contractor: DOMOTECHNIKI SA

Construction period: 2007-2009

Construction status: in operation

Systems description

Sophisticated security systems including intru-sion control, central access control systems, closed circuit television networks, perimeter alarm systems, fully interconnected.

Google

Page 113: Cambicci Associates Portfolio

Company profile 2012

page 113 out of 129

Po l i ce Admin i s t ra t ion Bu i ld ing in Kozan i , Greece

MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT

Project design parties

Project management

KED SA

Architectural study

406 Studies group, Vasileios Pappas

Structural study

I.Mavrakis and Associates SA

Safety & Security study

Cambicci+Assoc iates

Study period: 2008-2009

Construction details

General contractor: ANDREADIS ZISIADIS SA

Construction period: 2009-ongoing

Construction status: under construction

Short description of project-services

Sophisticated security systems including intru-sion control, central access control systems, closed circuit television systems and risk anal-ysis study.

Google

Page 114: Cambicci Associates Portfolio

Cambicci+Associates

page 114

VIP V i l l a in Nor thern Greece

Ιδιώτης VIP πελάτης

Project design parties

Safety & security study

Cambicci+Assoc iates

Study period: 2011

Short description of project-services

Risk analysis study for the safety measures in VIP Villa in Northern Greece.

Page 115: Cambicci Associates Portfolio

Company profile 2012

page 115 out of 129

PPPrrrooojjjeeecccttt mmmaaannnaaagggeeemmmeeennnttt

Page 116: Cambicci Associates Portfolio

Cambicci+Associates

page 116

This page was intentionally left blank

Page 117: Cambicci Associates Portfolio

Company profile 2012

page 117 out of 129

Project management services for the protection and upgrade of the suburban forest Seih-sou, in Thessaloniki, Greece.

Project owner

Region of Central Makedonia

Project design parties

Project management

OMICRON E.P.E. CONSORTIUM, I.Iosifidis, Y.Cambicci,

Services period: 2006-2009

Google

Page 118: Cambicci Associates Portfolio

Cambicci+Associates

page 118

This page was intentionally left blank

Page 119: Cambicci Associates Portfolio

Company profile 2012

page 119 out of 129

ΟΟΟrrrgggaaannniiisssaaatttiiiooonnn

Our office has the following depertments:

Administration

Mechanological & Plumbing Studies

Electrical Studies

Energy Studies

Industrial Studies

Lighting Design

Security Studies

And Renewable energy systems studies We have offices also in:

• Alexandroupolis fir Thrace Projects • Larissa for Thessaly projects • Athens •

Page 120: Cambicci Associates Portfolio

Cambicci+Associates

page 120

This page was intentionally left blank

Page 121: Cambicci Associates Portfolio

Company profile 2012

page 121 out of 129

QQQuuuaaallliiifffiiicccaaatttiiiooonnnsss –––dddiiippplllooommmaaasss fffrrrooommm pppuuubbbllliiiccc ssseeeccctttooorrr ppprrrooojjjeeeccctttsss

Our office is equipped (as is necessary by Greek legislation) with a diploma for Public Sector projects in the following categories of Stud-ies: Mechanical-Electrical-Electronic Studies: Class C Diploma (Category 09) Environmental Studies: Class A Diploma (Category 27) Engineers who cooperate with our office have Diplomas in other categories.

EEEnnneeerrrgggyyy iiinnnssspppeeeccctttiiiooonnn DDDiiippplllooommmaaasss

The following engineers in our organization have been certified as Energy Inspectors: Yerasimo Cambicci (Class Β)

Page 122: Cambicci Associates Portfolio

Cambicci+Associates

page 122

This page was intentionally left blank

Page 123: Cambicci Associates Portfolio

Company profile 2012

page 123 out of 129

CCCuuurrrrrriiicccuuullluuummm vvviiitttaaaeee

Page 124: Cambicci Associates Portfolio

Cambicci+Associates

page 124

1. General Data

Last Name: Cambicci First Name: Yerasimo Father’s name: Stylianos Year of birth: 1968 Place of birth: Xanthi, Greece Specialty: Diploma Mechanical Engineer A.U.TH. TCG No: 62405 Greek Public Works Degree (According to Greek Law 716/77) Number: 11263 Headquarters: Thessaloniki Valid thrued: 21.05.2008 Studies Categories: Category No 9: Degree Level C (MEP Studies)

Category No 27: Degree Level A (Enviromental Studies)

2. Studies

High School Degree Year of Graduation: 1985 Grade: Excellent High School: Xanthi 1st High School Mechanical Engineer Degree Year of Graduation: 1992 Grade: Good Thesis: Thermal Simulation of Artificial Water Tanks Thesis Grade: Excellent University: Aristoteleio University of Thessaloniki

Page 125: Cambicci Associates Portfolio

Company profile 2012

page 125 out of 129

3. Seminars

Engineers & Personal Computers Carrier: TCG East Makedonia Section Period: 1992 Air Pollution Carrier: Energy Department- Section of Mechanical Engineers Polytechnic School - A.U.TH. Period: 1992 Ιnstallation Βus Compact Course Carrier: Siemens Training Center, Regensburg, Germany Period: 1997 Education In Lighting Carrier: Lightolier, USA Period: 2002 Lighting Technology Carrier: Rensesealer Polytechnic Institute, New York, USA Period: 2007

4. Foreign Languages

English Diploma: First Certificate in English Institute: University of Cambridge

Page 126: Cambicci Associates Portfolio

Cambicci+Associates

page 126

5. Work Experience

5.1 Employer: North Aegean Petrol Company (NAPC) Kavala, Greece Position: Production Engineer Period: 1987 Duties: Monitoring of the petrol deposit and supervision of drilling repair works 5.2 Employer: Private & Public Works in Greece Office Gerasimos Kampitsis + Associates Position: MEP Design Engineer Period: 1993-Today Duties: MEP Design & Construction Supervision, as follows:

• Mechanical Electrical & Plumbing Installations design, for Buildings, Urban and infrastructure projects. • Lighting Design Projects • Supervision of the above studies at the construction phase. • Environmental Studies • Project Consultant • Project Management

6. Main Research Work

6.1 Research Program: New Pilaia Mayor Office – Energy Analysis Study Carrier: Pylaia Municipality, Polytechnic School of AUTH Position: Researcher Responsible Professor: Dr Konstantinos Pattas Period: 1994-1995 Project: Ground Source Heat Pumps

Page 127: Cambicci Associates Portfolio

Company profile 2012

page 127 out of 129

6.2 Research Program: New Media Mass Medium Carrier: A.U.TH. Position: Researcher Period: 2003 Project: Preliminary Report of New Building MEP Installations Study 6.3 Research Program: Expansion of Pedagogigs Building Carrier: A.U.TH. Position: Researcher Period: 2004 Project: Preliminary Report of New Building MEP Installations Study 6.4 Research Program: Fire Safety Installations in Law School Building Carrier: A.U.TH. Position: Researcher Responsible Professor: Dr Nikolaos Kyriakis Period: 2006 Project: Fire Safety Installations execution study

7. Conventions

Urban Nightscape 2006, Hellenic Illumination Committee, September 2006, Goulandris Museum, Athens

8. Publications

Heating System for a Baby Farm, Designing for Hygiene and Security. D.Mpozis, P.Kikidis, Y.Cambicci, D.Giannaraki, Ktirio magazine, Issue 166, 2004.

Page 128: Cambicci Associates Portfolio

Cambicci+Associates

page 128

9. Member of

TCG: Technical Chamber of Greece PSDMH: Hellenic Union of Dipl. Mechanical & Electrical Engineers SMHBE: Union of Northern Greece Mechanical & Electrical Engineers SMEDEKEM Union of Central Makedonia Public Projects Designers HIC: Hellenic Illumination Commitee ΕΙΒΑ/KNX: European Installation Bus Association (EIBA/KNX Partner). IESNA: Illuminating Engineering Society of North America. ASHRAE: American Society Of Heating Refrigerating and Air Conditioning, Hellenic Section Thessaloniki 2012 Γon behalf of Cambicci+Associates

Yerasimo Cambicci Dipl.Mechanical Engineer AUTh

Page 129: Cambicci Associates Portfolio

Company profile 2012

page 129 out of 129

CCCooonnntttaaacccttt

Postal Address: 10 Riga Feraiou & Filikis Eterias, 6th floor P.C. GR-555 35 Pylaia, Thessaloniki Greece Phones & Fax: Tel: +30 2310 850 800 +30 2310 262 106 +30 6970 985 805 Fax:+30 2310 850 865

Internet Address: Email: [email protected] Site: www.cambicci.eu (.com .gr)

Skype: cambicci Facebook: Cambicci+Associates LinkedIn: Yerasimo Cambicci Driving Instructions

Think before you print.