After

Lowell Project

2,000 SF

$ 168,000

3 month Duration

Original consultant and contractor removed from project. Scope re-evaluated to fit owners needs and budget guidelines. Modifications included valuable energy-efficient sustainable elements.

BEFORE

AFTER

Washtenaw Project

3,300 SF

$ 290,000

5 month Duration

Increased 1,100 SF to 3,300 SF with added 2nd story. New 2-car garage, 3 new baths, 20’ x 10’ finished basement. Custom cabinetry in kitchen and living area, new granite countertops. New mechanical systems, new windows and extensive masonry repairs.

BEFORE

AFTER

West 103rd Street

3,000 SF

$ 60,000

2 month Duration

Vinyl windows installed and exterior building scraped, primed and re-painted. New oak floors installed in kitchen/dining area with existing wood floors re-sanded. Gourmet kitchen and 2 new bathrooms with cabinets and entire home re-wired to 200 amp service.

BEFORE

AFTER

Hollywood Street

2,500 SF

$ 270,000

5 month Duration

This home was taken down to the foundation to build a new modern 2 story framed home with a detached garage. New kitchen, 2 full baths and concrete poured flooring was installed in addition to Hardi-board siding, aluminum windows and TPO roofing system.

BEFORE

AFTER

West Grace Street

1,600 SF

$ 45,000

2 month Duration

Kitchen and master suite make-over. Moroccan Walnut flooring, espresso stained maple cabinets, granite counter-tops, subway tile backsplash and porcelain tile in bathroom. Upgraded to 200 amp electrical service and various lighting throughout.

BEFORE

AFTER

West Thomas Street

2,000 SF

$ 180,000

5 month Duration

4-Unit building where owner duplexed his unit with unfinished attic. 2 new bedrooms and 2 new bath were added. All mechanicals replaced-plumbing, electrical and HVAC. Renovated kitchen with cabinetry, tile backsplash, quartz counter tops and new appliances.