19
MSc BIM & Integrated Design BIM Model Analysis in Multidisciplinary Perspective Presented by: Aravindh Rajendiran Student ID: @0044125 Presented to: Dr Paul Coates Dr Jason Underwood

BIM model analysis

Embed Size (px)

Citation preview

MSc BIM & Integrated DesignBIM Model Analysis in

Multidisciplinary Perspective

Presented by:Aravindh RajendiranStudent ID: @00441255

Presented to:Dr Paul CoatesDr Jason Underwood

What is BIM?It’s All about exchanging information with in the project and collaboration between all team members.

Input

DWG

Point Clouds

It’s NOT Technology

PDFDGN

BIM Design model

OutputClash detectionExtracting BOQ4D Construction Sequencing5D Cost Scheduling6D Sustainability &Energy Analysis7D Facility managementCobie spread sheet

Process/workflow

Proposed model and available informationProject Name : Residential Apartment (Pilot Project)Location : Manchester

Project information

Geometric information

Material information

Interior details

Solar Analysis

Plans, Elevations & Schedule

Manufacturer details

• http://seek.autodesk.com/

Refer :

• http://bimobject.com/en

• http://www.nationalbimlibrary.com/manufacturers

Missing information :

Structural drawings & Reinforcement details

MEP details & coordination drawings

Inconsistent found in model:• Architectural wall & column

intersection not modeled properly• Clearance between

suspended ceiling and front door

• Room spaces are not assigned properly

Clash Detection:

Hard clashes-492Tolerance-0.01m

http://www.iglc20.sdsu.edu/papers/wp-content/uploads/2012/07/13%20P%20008.pdfhttps://www.youtube.com/watch?v=gTGquTcmScU

• refers to components that are closer than a certain distance (a minimum clearance) from one another

Soft Clash: Hard clash :  two objects

occupying the same spaceNo clearance

Refer :

4D: Construction Sequencing

(Eastman, et al. 2008)

http://web.stanford.edu/~fischer/research/4DCADModeling.pdf

Refer :

• allows project stakeholders to view the planned construction of a facility over time on the screen

http://www.engr.psu.edu/ae/cic/publications/techreports/tr_051_wang_2007_4d_modeling_in_education.pdf

• Improved site use planning and coordination with ongoing operations

• Marketing purposes and publicity

Benefits:

Construction Schedule

Linking into 4d software and create selection set

4D model construction sequencing & simulation

3d model4D: Construction Sequencing

5D: Cost Estimation

http://hc-qs.com/brochure/pdf/4-5%20BiM%20modelling.pdfRefer :

(HC BIM QS) • construct a model from CAD drawings, specifications and other information available

• digitally measure geometric information to produce accurate quantities

• link the quantity information with project specific Bills of Quantities and Cost Plans

• create client specific reports

Revit model/IFC model Rib Itwo/5d model tool• Link model and BOQ

Cost estimation Report

https://gbs.autodesk.com/GBS/Run?ProjectID=pLH5tTDUbhY%3d

6D: Sustainability & Energy Analysis:

Total annual Cost & Energy usage

Energy Carbon and cost summary

Refer:

Electricity & fuel use

7D:Facility management

 Autodesk FM Desktop Black board salford

Refer :https://bim.wikispaces.com/Facility+Asset+Management

• involvement at early stages to improve operational performance.

CAPEX & OPEX

Real time tracking

Mosaic

http://www.openbim.org/case-studies/university-campus-facilities-management-bim-model

7D:Facility management (Benefits)

Improved space managementIntegration with

maintenance managementRefer :

http://www.ifma-afc.org/docs/submissions/2012-04-BIM.pdf

BIM collaboration in Multi Disciplinary Perspective

MV-BIM

• Upto 15% of the cost of a project is lost because of rework and avoidable collisions between trades

• Work parallel instead of linear

• Bring visibility and control to shared Information Models

• Immediately review the design progression during development and track critical decision making

Cobie: Revit model

• Type parameters & instance parameters

1.Adding Cobie information using Revit add on CTC2.Detailed Project information for Cobie

• Classification types

Element comparison

• Adding all required cobie information to the model

• Export model into industry foundation class

• Checking all cobie data information in federated model

• Export cobie data into excel spread sheet

http://www.bimprospects.com/filelibrary/Presentations%2026%20March/6-John-Sullivan.pdf

Refer :

Current Limitations and disadvantages

• Model analysis incomplete (Structural & Light analysis etc.)

• Missing information ex: STRUCTURAL, MEP which affect the analysis workflow.

• Lack of standards.

• Current Model is incomplete in Relation to “BIM”.

• Conflicts within used software's.

Recommendations for Future Improvements• Well designed BIM model in design stage.

• Multidisciplinary teams could then collaborate successfully with their project teams.

• Proper guidance & trainings before starting project.

• Information & knowledge sharing

Visualization:

3D Perspective view

Interior viewNight view