A Fairfax County, VA, publication
Department of Public Works and Environmental ServicesWorking for You!
Turkey Run @ Truro Subdivision Stream Restoration
Contract No. CN16125136Project No. SD-000031-091Tax Map ID 70-1Braddock District
December 7, 2017
Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Project DetailsTurkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Description:
The Turkey Run @ Truro Subdivision Stream Restoration project was substantially completed within budget on October 19, 2017. This project included restoring approximately 3,850 linear feet of stream channel and tributaries. The Tributary of Turkey Run which drains directly to Accotink Creek in the Accotink Creek watershed is located in the center of Fairfax County, Virginia and drains southeast to Accotink Bay, then Gunston Cove and finally to the Tidal Potomac River. Restoration of the stream was achieved through the use of natural channel design principles.
Project Overview:• Restoring stream morphology and connectivity to the adjacent floodplain and riparian zone• Removing one pedestrian bridge and replacing the existing six pedestrian bridges with six new pedestrian bridges• Removing and replacing the existing trail and used part of the parking lot • Place Reinforced Bed Mix material to stabilize the stream bed and banks• Control invasive species• Reduce erosion using in-stream grade control structures including: Rock Sill, Boulder Toe Protection, Buried Rock Toe, Riffle with
Log Sill, Step Pools, Boulder Clusters and Modified Cross Vanes with woody debris• Create overbank wetland areas and install surface and buried woody debris to support habitat improvement• The project reduces total phosphorus by 772.96 pounds per year; reduces total nitrogen by 1,661.55 pounds per year; and
removes 265,770.63 pounds of sediment per year from this tributary leading to Potomac River
Project Team:• Stormwater Planning Division (SWPD) –Vivian Bui, Charles Smith, Suzanne Foster, Justin Pistore• Utilities Design and Construction Division (UDCD) - Yousef Rayyan, Bill Nolan, Tammy Michelli• Project Inspector, UDCD - Jeff Bartlett, Howard Champ• Urban Forestry- Ian Fuze• Land Acquisition Division (LAD) – Beth Shubert
Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Tax Map No. 70-1
Upper Section of the project site
Lower Section of the project site
Trickle ditch
Driveway Culverts
The project Site
Entrance # 3
Entrance # 1
Entrance # 2
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Before After
Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Matthew Kaiser, Public Information Officer703-324-8455, TTY 711
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch