View
19.074
Download
1
Embed Size (px)
DESCRIPTION
Miroslav Lipar, 7 April 2011
Citation preview
IAEAInternational Atomic Energy Agency
Status of Fukushima Units
Miroslav Lipar7 April 2011
IAEA
Unit 1 2 3 4
Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381
Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4
Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage
Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor
RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable
Not applicable due to outage plant status
Containment integrity No information Damage suspected Damage suspected
AC PowerAC power available - power to instrumentation – Lighting to Central Control Room
AC power available – power to instrumentation – Lighting to Central Control Room
AC power available – power to instrumentation – Lighting to Central Control Room
AC power available – power to instrumentation – Lighting to Central Control Room
Building Severe damage Slight damage Severe damage Severe damage
Water level of RPV Around half of Fuel is uncovered
Around half of Fuel is uncovered
Around half of Fuel is uncovered
Not applicable due to outage plant status
Pressure of RPV Increasing Stable Stable
CV Pressure Drywell Increasing Stable Stable
Water injection to RPVInjection of freshwater – via mobile electric pump with off-site power
Injection of freshwater – via mobile electric pump with off-site power
Injection of freshwater – via mobile electric pump with off-site power
Water injection to CV No information No information No information
Spent Fuel Pool StatusFresh water spraying completed by concrete pump truck
Freshwater injection to the Fuel Pool Cooling Line
Freshwater injection via Fuel Pool Cooling Line and Periodic spraying
Fresh water spraying completed by concrete pump truck
IAEA
Unit 5 6
Power 784/2381 1100/3293
Type of Reactor BWR-4 BWR-5
Status at the EQ occurred Outage Outage
Core and Fuel
Cold ShutdownBeing maintained using off-site electrical power and existing plant equipment.
Cold ShutdownBeing maintained using off-site electrical power and existing plant equipment.
RPV & RCS integrity
Containment int.
AC Power
Building
Water level of RPV
Pressure of RPV
Containment Pressure
Water injection to RPV
Water injection to CV
Spent Fuel Pool Status
Severe condition
Concern
No immediate concern
IAEA
Condenser1600 m3
Condensate Storage tank
1900 m3
Suppression Pool Surge
Tanks2x3400 m3
2nd Step
Transfer to provide tank capacity Mar 31st to Apr 2nd – Unit 1
3rd Step
Provide Space in CondenserApr 2nd – Unit 1
Water in Unit 1 Turbine Building
Approx. 20,000 tons
Mar 24th – Mar 29th
1st Step
Con
dens
er fi
lled
Rad Waste
Treatment facility
Temp Storage
Tank
Planned
Sequence of Events to Remove Water in Unit 1
IAEA
Condenser3000 m3
Condensate Storage tank
2500 m3
Suppression Pool Surge
Tanks2x3400 m3
1st Step -Transfer to provide tank capacity
Mar 29th to Apr 1st – Unit 2
2nd Step - Transfer to provide capacity in condenserApr 2nd – (30 m3/h)
Water in Unit 2turbine building
Approx. 20,000 tons
Planned
Rad Waste
Treatment facility
Planned
Sea
Apr 5th
10,000 tons
Unit 5 & 6 sub drain
pits
Apr 5th 1,500 tons
Low level contaminated water
Temp Storage
Tank
Sequence of Events to Remove Water in Unit 2
IAEA
Condenser3000 m3
Condensate Storage tank
2500 m3
Suppression Pool Surge
Tanks2x3400 m3
1st Step -Transfer to provide tank capacity
Mar 28th to Mar 31st - Unit 3
2nd Step - Transfer to provide capacity in condenserApr 5th – Unit 3
Water in Unit 3turbine building
Approx. 20,000 tons water
Later
Rad Waste
Treatment facility
Later
Sea
Apr 5th
10,000 tons
Unit 5 & 6 sub drain
pits
Apr 5th 1,500 tons
Low level contaminated water
Temp Storage
Tank
Sequence of Events to Remove Water in Unit 3
IAEA
• Borehole• Injection of Tracer• Injection of liquid glass
Cross Section Plan
Screen Pump room
Floor Plan
Cable Trench
Pit
Injected liquid glass to block the water path in the gravel
Injection of water glass to block the water path
①~⑨ :Positions of injection holesZ
Crack? Screen Pump room
O.P.+4.200
O.P.+2.700
O.P.+2.200
Pit
About1m?
O.P.+4.150
1900 200
1800
O.P.+4.000
300300? ⑦⑧
⑤ ⑥① ②
①
②
④
⑥
⑧
⑤
③
⑨
⑨
Drill vertically
IAEA
Nitrogen injection