Roosevelt High School Moderniza on Concept DesignOctober 2013
Roosevelt High School Moderniza on Concept DesignOctober 2013
ScheduleDesign Submissions• Concept Design October 16, 2013• Schematic Design December 20, 2013• Early Release Packages December 20, 2013• Design Development/GMP March 3, 2014• Construction Documents June 2014
Construction Milestones• Abatment November 1, 2013 - December 31, 2013• Demolition January 1, 2014 - March 15, 2014• Substantial Completion July 15, 2015• School starts August 2015
Student Involvement• Bi-weekly meetings Starting in November 2013 with design/build team
SCHEDULE
Roosevelt High School Moderniza on Concept DesignOctober 2013
NEIGHBORHOOD CONTEXT
10 min w
alk
Petworth Metro
Roosevelt High School Moderniza on Concept DesignOctober 2013
GREATER CAMPUS
MacFarland (RHS swing space)
Sharpe Health
Roosevelt
Petworth Library
Greater Campus
Roosevelt High School Moderniza on Concept DesignOctober 2013
CONSTRUCTION PHASES
Construc on Phases
1932
1976
Roosevelt High School Moderniza on Concept DesignOctober 2013
ISSUES AND OPPORTUNITIES
Arrival/Iden ty• School Students Teachers Parents
• STAY Students Teachers
• Community Gym Pool Health Clinic Auditorium
Access/Security• School Students Teachers Parents
• STAY Students Teachers
• Community Gym Pool Health Clinic Auditorium
Issues and Opportuni es
Roosevelt High School Moderniza on Concept DesignOctober 2013
CAMPUS PLAN
Campus Plan
“The Heart”“The Outdoor Classroom”“The Pavilion”Georgia Ave
Iowa Ave
13th
Str
eet N
W
Allison Street NW
Upshur Street
“The Terrace”
“The Waterworks”
“The School Garden”
“The Gallery”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE TERRACE”
• Visibility• Iden ty• Access
“The Terrace”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE TERRACE”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE PAVILION”
“The Pavilion”
• Community entrance• STAY entrance• Iden ty
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE OUTDOOR CLASSROOM” AND “THE PAVILION”
“The Outdoor Classroom” and “The Pavilion”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE OUTDOOR CLASSROOM”
“The Outdoor Classroom”
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTE
10’ 20’ 30’ 50’0’
FIRST FLOOR
BUILDING ORGANIZATION
ARTS AUDITORIUM ACADEMICS
RHS ENTRY
STAY/COMMUNITY ENTRY
ATHLETICS
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN LOWER LEVEL
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 40’0’
“The Heart”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE HEART”
“The Heart”
Cafeteria
CulinaryArts
Career Center
13th Street
“The Terrace”
“The Steps”
MediaCenter
“O u td o o r Classroom”
“The Heart”
C o s m e -tology
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE HEART”
gathering
learningcommunity building
sharing“The Heart”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Heart”
“THE HEART”
old + new
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Heart”
“THE HEART”
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN LOWER LEVEL
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 40’0’
Media Center
Roosevelt High School Moderniza on Concept DesignOctober 2013
MEDIA CENTER
Media Center
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN LOWER LEVEL
“The Waterworks”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Waterworks”
“THE WATERWORKS”
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN FIRST FLOOR
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
“The Gallery”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE GALLERY”
“The Gallery”
3D/2D Studio
Instrumental
Choral
Mul -purpose Studio
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN FIRST FLOOR
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
“The Pavilion”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Pavilion”
“THE PAVILION”
STAY
GYM
POOL
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN FIRST FLOOR
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
“The School Garden”
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The School Garden”
“THE SCHOOL GARDEN”
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
OVERALL PLAN FIRST FLOOR
Gym
Roosevelt High School Moderniza on Concept DesignOctober 2013
GYM SECTION
Gym Sec on
Proposed bleacher capacity: +/- 1,000
Roosevelt High School Moderniza on Concept DesignOctober 2013
GROUND FLOOR FIRST FLOOR
SHARED SPACES
• RHS Administration• STAY Administration• Family Support Center
• Cafeteria• Culinary Arts• Media Center
• Career Center• STAY Classrooms
Roosevelt High School Moderniza on Concept DesignOctober 2013
FIRST FLOOR SECOND FLOOR THIRD FLOOR
ACADEMY ORGANIZATION
• 10th Grade Academy• RISE Academy• Autism Academy
• 9th Grade Academy• ESL Academy (9th +10th)
• 11th Grade Academy• 12th Grade Academy• Elite Academy
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMY IDENTITY
ACADEMY IDENTITY
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMY ADMINISTRATION
ACADEMY ADMINISTRATION
• Staff Office or Workroom• Stairs and Restroom
Roosevelt High School Moderniza on Concept DesignOctober 2013
Front Entrance Preliminary Landscape Planting Concept:
Preliminary Plant Palette:
Trees / Shrubs
Stabilize embankment / Foundation Planting ExampleProvide emphasis to front entrance
LANDSCAPE
Landscape
Roosevelt High School Moderniza on Concept DesignOctober 2013
DROP OFF
Proposed Drop-off Along 13th Street
Visitor parking(22 spaces)
Bus Loop
AuditoriumArts Wing
Accessible Path
Roosevelt High School Moderniza on Concept DesignOctober 2013
LEED for Schools 2009 Pts.
80 13 6 11 Total Proposed Project Score 110
19 2 3 0 24
Y M+ M- NY SSp1 Construction Activity Pollution Prevention 0Y SSp2 Environmental Site Assessment 01 SS1 Site Selection 14 SS2 Dev. Density & Community Connectivity 41 SS3 Brownfield Redevelopment 14 SS4.1 Alt. Transportation - Public Transport 41 SS4.2 Alt. Transportation - Bicycle Storage 12 SS4.3 Alt. Transportation - LEV Vehicles 2
2 SS4.4 Alt. Transportation - Parking Capacity 21 SS5 1 Site Development Protect or Restore Habitat 1
Sustainable SitesCertified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Pla
1 SS5.1 Site Development - Protect or Restore Habitat 11 SS5.2 Site Development - Maximize Open Space 1
1 SS6.1 Stormwater Design - Quantity Control 11 SS6.2 Stormwater Design - Quality Control 11 SS7.1 Heat Island Effect - Non-Roof 1
1 SS7.2 Heat Island Effect - Roof 11 SS8 Light Pollution Reduction 1
1 SS9 Site Master Plan 11 SS10 Joint Use of Facilities 110 0 0 1 11
Y M+ M- NY WEp1 Water Use Reduction 04 WE1 Water Efficient Landscaping 4
2 WE2 Innovative Wastewater Technologies 24 WE3 Water Use Reduction, 30%, 35%, 40% 4
1 WE4 Process Water Use Reduction, 20% 120 8 1 4 33
Y M+ M- NY EAp1 Fundamental Commissioning 0Y EAp2 Min. Energy Performance (ASHRAE 90.1 - 2007) 0Y EAp3 Fundamental Refrigerant Management 010 5 1 3 EA1 Optimize Energy Performance 19
5 2 EA2 On-Site Renewable Energy 7
2 EA3 Enhanced Commissioning 2
Water Efficiency
Energy & Atmosphere
2 EA3 Enhanced Commissioning 21 EA4 Enhanced Refrigerant Management 1
1 1 EA5 Measurement & Verification 2
2 EA6 Green Power, 35% for 2 years 2
, y8 1 0 4 13
Y M+ M- NY MRp1 Storage & Collection of Recyclables 01 1 MR1.1 Bldg. Reuse - Exist. Walls/ Floors/ Roof 75/95% 2
1 MR1.2 Bldg. Reuse - Interior Non-Struc. Elements,50% 12 MR2 Construction Waste Management, 50/ 75% 2
2 MR3 Materials Reuse 5% 22 MR4 Recycled Content 10%, 20% 22 MR5 Regional Materials 10%, 20% 2
1 MR6 Rapidly Renewable Materials 2.5% 11 MR7 Certified Wood 114 1 2 2 19
Y M+ M- NY IEQp1 Minimum IAQ Performance 0Y IEQp2 Environmental Tobacco Smoke (ETS) Control 0Y IEQp3 Minimum Acoustical Performance 01 IEQ1 Outdoor Air Delivery Monitoring 1
1 IEQ2 Increased Ventilation 11 IEQ3.1 Const. IAQ Management Plan - During Const. 11 IEQ3.2 Const. IAQ Management Plan - Pre Occupancy 1
IEQ4 Low-Emitting Materials (Choose for upto 4 points) 41 IEQ4.1 Adhesives and Sealants 11 IEQ4.2 Paints & Coatings 11 IEQ4.3 Flooring Systems 1Y IEQ4.4 Composite Wood & Agrifiber 1
Indoor Environmental Quality
Materials & Resources
1 IEQ4.5 Furniture & Furnishings 1Y IEQ4.6 Ceiling and Wall Systems 11 IEQ5 Indoor Chemical & Pollutant Source Control 11 IEQ6.1 Controllability of Systems - Lighting 11 IEQ6.2 Controllability of Systems - Thermal Comfort 11 IEQ7.1 Thermal Comfort - Design 11 IEQ7.2 Thermal Comfort - Verification 11 1 1 IEQ8.1 Daylight 75/90% classrm/ 75% reg. occupied 3
1 IEQ8.2 Views 90% 11 IEQ9 Enhanced Acoustical Performance 1
1 IEQ10 Mold Prevention 16 0 0 0 6
Y M+ M- N1 ID1.1 Innovation in Design: Education/ Outreach 11 ID1.2 Innovation in Design: Green Cleaning 11 ID1.3 Pilot Credit SSpc82: Local Food Production 11 ID1.4 Exemplary Performance: Green Power - 70% 1
Backup Innovation in Design: SSc4.1 0Backup Innovation in Design: Low Mercury Lighting 0Backup Exemplary Performance: MRc2 95%
1 ID2 LEED™ Accredited Professional 11 ID3 The School as a Teaching Tool 1
Innovation in Design
g3 1 0 0 4
Y M+ M- N Up to 4 points awarded in this categoryM- RP1.1 Regional Priority: SSc5.1 1
1 RP1.2 Regional Priority: SSc6.1 11 RP1.3 Regional Priority: WEc2 1
M+ RP1.4 Regional Priority: EAc1 (40%/36%) 11 RP1.5 Regional Priority: EAc2 (1%) 11 RP1.6 Regional Priority: MRc1.1 (75%) 1
Regional Priority
1 RP1.6 Regional Priority: MRc1.1 (75%) 1
LEED SCORECARD
LEED Scorecard
Roosevelt High School Moderniza on Concept DesignOctober 2013
• Restora on + Maintain profi les - Rou ne maintenance - $$$$ - Poor thermal performance without added storm• New Wood Windows + Match profi les - Rou ne maintenance - $$$ - Moderate thermal performance• Metal Clad Wood Windows +/- Tradi onal appearance + Be er thermal performance + Less maintenance + $$• Metal Windows +/- Tradi onal appearance + Be er thermal performance + Least maintenance + $$
WINDOWS
Windows
Roosevelt High School Moderniza on Concept DesignOctober 2013
CUPOLA RESTORATION
Cupola Restora on
1932Cupola
2013Cupola
Glass Fiber Reinforced Concrete “Jacket”
2015Cupola
+ =
Roosevelt High School Moderniza on Concept DesignOctober 2013