Model Villages Progress PDMA Punjab, May 12, 2011

Punjab Model Villages

Embed Size (px)

DESCRIPTION

Following the aftermath of Pakistan’s worst floods in 2010, the most urgent need for the rehabilitation process is in the building of homes and restoration of livelihoods that have been destroyed. The pressing need is for communities to be approached in a holistic way so that affected persons can have shelter while also beginning the journey towards self-sufficiency.Punjab Government in the leadership of chief minister Shahbaz Sharif took the initiative to build 22 model villages with all basic facilities have been constructed in flood hit areas of Punjab. He stated that the construction of the villages would bring new culture in these areas.Director General, Provincial Disaster Management Authority (PDMA), Khalid Sherdil played leading role in planning, coordinating and managing the construction of state of the art model villages in eleven flood affected districts.

Citation preview

Page 1: Punjab Model Villages

Model Villages Progress

PDMA Punjab, May 12, 2011

Page 2: Punjab Model Villages

Outline

• 1. Locations

• 2. Progress

• 3. Designs

• 4. Issues

• 5. Allotment Policy

• 6. Turkey/UN

2

Page 3: Punjab Model Villages

1. Locations

Page 4: Punjab Model Villages

1. Locations

RYK

3

Rajanpur

4

DGK

3

Muzaffargarh

6

Layyah

3

Bhakkar

1

Mianwali

2

Page 5: Punjab Model Villages
Page 6: Punjab Model Villages

NORTH

Mianwali Bhakkar Layyah

Page 7: Punjab Model Villages

SOUTH

MuzaffargarhDGKRajanpur RYK

Page 8: Punjab Model Villages

Types of Land

• Govt. Land (Rajanpur, RYK, DGK, Mgarh)

–10 villages [242 acres]

• Donated (Bhakkar, DGK, Layyah, Mgarh)

–10 villages [62 acres]

• Purchased Land (Mianwali)

–2 villages [12.5 acres]

–Khanekhel from Pvt. Party

• Rs 4.48 mill for 8 acres

–Sharifabad from Railways

• District Price Assessment Committee

Page 9: Punjab Model Villages

Allied Facilities

9

Page 10: Punjab Model Villages

2. Progress

Page 11: Punjab Model Villages

Graph

11

Page 12: Punjab Model Villages

12

Page 13: Punjab Model Villages

13

Progress Video

Page 14: Punjab Model Villages

Total Cost of Model Villages

14

Page 15: Punjab Model Villages

TPV & Audit

• NESPAK and ACE have been hired and are on-site as Resident Engineers

• PDMA acknowledges help of P&D in hiring TPV firms

• PC-II was approved by P&D for Rs 22 million

–Actual cost ~ 1.5 %

• Ferguson is preparing quotation for Audit

15

Page 16: Punjab Model Villages

Funds Amount(Rs. mill)

% of Project

Disbursed to DCOs

306 23 % 43% of housing

2nd Tranche approved today

447 33 %

Balance 567 44 %

Total 1,356 100 %

16

Page 17: Punjab Model Villages

Issues raised by DCOs

• Wheat Harvest:

–Labor shortage

–Donated Land: have to wait

• Petrol increase (Diesel Rs 99) putting stress on contractors to meet Rs. 375,000

–Village Karya (Rojhan), Buraq Contractor, has not started work despite signing contract

17

Page 18: Punjab Model Villages

Allied Facilities Costs

18

Page 19: Punjab Model Villages

… Allied Facilities Costs

• Work has commenced in Muzaffargarh, DGK, Layyah

19

Page 20: Punjab Model Villages

3. Designs

Page 21: Punjab Model Villages

Houses

21

Page 22: Punjab Model Villages

PLOT AREA 1175 sft

PLOT SIZE 23’-6”x50’-0”

COV. AREA 598 SFT

OPEN AREA 560 sft

ACCOMODATION :

2 ROOMS 11’-0”x14’-0”

VERANDAH 16’ -0x7’-6”

KITCHEN 8’-0”x6’-9”

TOILET 6’-0”x6’-0”

Design 1

Page 23: Punjab Model Villages

Design 2

Page 24: Punjab Model Villages

School

24

Page 25: Punjab Model Villages

COV. AREA 3228 SFT

ACCOMODATION :

CLASS ROOM 5 Nos.

HEAD MASTER 1

OFFICE 1

TOILET

School

Page 26: Punjab Model Villages

School Working Plan

Page 27: Punjab Model Villages

Dispensary

27

Page 28: Punjab Model Villages

COV. AREA 1392 SFT

ACCOMODATION :

DOCTOR RM. W/TOILET

LADY HEALTH WORKER

TREATMENT RM.

UTILITY ROOM

DISPANSARY

Dispensary

Page 29: Punjab Model Villages

TEVTA Centre

29

Page 30: Punjab Model Villages

COV. AREA 1555 SFT

ACCOMODATION :

DISPLAY ROOM

E-LEARNING RM.

WOMEN CRAFTS RM.

OFFICE

TOILETS

TEVTA CENTRE

Page 31: Punjab Model Villages

Community Center

31

Page 32: Punjab Model Villages

32

Page 33: Punjab Model Villages

Basti Cut, Bhakkar

33

Page 34: Punjab Model Villages

Safdarabad, Rojhan

34

Page 35: Punjab Model Villages

Rakh Fazilpur, Rajanpur

35

Page 36: Punjab Model Villages

Rakh Azmatwala, Jampur

36

Page 37: Punjab Model Villages

Sharifabad, Esakhel

37

Page 38: Punjab Model Villages

Basti Pir Buksh, Layyah

38

Page 39: Punjab Model Villages

5. Allotment Policy

Page 40: Punjab Model Villages

Allotments Policy• Each District to potentially have

different rules, provided that:

• Proviso 1: Only the houses verified to be “Completely Damaged” in Survey may qualify

• Proviso 2: Only the villages with over 75% of the houses damaged, & having at least 40 damaged houses may qualify

• Proviso 3: Care must be taken to move entire Basti together

• Proviso 4: When multiple clans are assigned to a single village, they may be distributed in separate blocks

40

Page 41: Punjab Model Villages

… I. Donated Land

• I. For Model Villages where land is donated:

– (a) If there are more applicants than houses:

• Conduct ballot between all damaged houses of that village

• No one may be excluded because Donors belong to different caste

– (b) If there are more houses than applicants:

• Move on to the next nearest Basti meeting cirteria in Proviso 2

41

Page 42: Punjab Model Villages

II. Govt. Land

• II. For Model Villages on Purchased or Govt. Land, conduct 2-Round Balloting

–Round 1: Ballot of eligible villages meeting Proviso 2

• If more model houses than total number of damaged houses in villages, then select a 2nd (or 3rd) village by Ballot

–Round 2: Ballot of households within the Round 1 village(s)

42

Page 43: Punjab Model Villages

… II(a) Govt. Land

– (a) For villages adjacent to Flood area

• DCO to notify any Radius (e.g. 5 km)

• Select all Villages meeting Proviso 2 within the Radius

• Conduct 2-Round Balloting

43

Page 44: Punjab Model Villages

… II(b) Govt. Land

– (b) For villages at locations away from Flood area

• DCO to notify a list of villages within Tehsil which cannot be reclaimed due to River Action

• Conduct 2-Round Balloting

44

Page 45: Punjab Model Villages

6. Turkey/UN

Page 46: Punjab Model Villages

• Turkey

• UN Habitat

• WFP

• UNDP

• DFID (UK AID)

• UN Early Recovery

46

Page 47: Punjab Model Villages

TurkeyTehsil Village Houses Acres

TOKI

Jampur Azmatwala 500 21.5

Rajanpur Fazilpur 340 92

Mgarh Mgarh 1,270 99

KIMSE YOKMU

Mgarh Mgarh 500 44

TIKA

Rajanpur Kot Mithan 2 x Schools 5

Jampur ChahMondwala

Hospital 3

Mgarh Khanpur Hospital, Boarding,Slaughter

48

Mgarh Kalandar-wala

Social Center 4

Mgarh Lutkran Hospital 1.5 47

Page 48: Punjab Model Villages

UNDP Govt. Offices (~70)

48

Page 49: Punjab Model Villages

49

Page 50: Punjab Model Villages

UN HABITAT

• Project launched in April 2011

• 11,000 one room shelters

• PDMA for M&E

• As per Model Villages format, will be in clusters of 10-15 or more

50

Page 51: Punjab Model Villages

World Food Program

• WFP has allocated $4 million to PDMA for two State of the Art Warehouses

• Each will contain pre-fabricated equipment for three small portable ware-houses

• BOR has allocated land at Harbancepura (7 acres)

• One Warehouse will be built on DGK-Multan Road at Muzaffargarh

51

Page 52: Punjab Model Villages

DFID (UK AID)

• £ 100,000 study launched on making Model Villages and Schools resilient to floods

–Climate Development Knowledge Network (CDKN) and LEAD International

52

Page 53: Punjab Model Villages

Group UN Agencies Chair Depts.(Govt. of Punjab)

Govt. Member Depts.

1. Food,Agriculture, Livestock & Dairy Department

FAOWFP

Agriculture Department

Livestock Department, Health Department

2. Health and Nutrition

WHOUNICEF

Health Department Rescue 1122

3. Education UNICEF UNESCO

School Education Department, LocalGovernment Department

Rescue 1122, Civil Defense

4. Public Health (Wash)

UNICEF Public Health Department

Local Government

UN Early Recovery 12 Working Groups(Projects for $800 mill for Pakistan)

Page 54: Punjab Model Villages

7. Sustainability

Page 55: Punjab Model Villages

Provincial MV Sustainability Committee

District MV -Management

Board

(Muzaffargarh)

Village Organization

(Meeran Mullan)

Village Organization

(MV 2 ...)

District MV -Management

Board

(District 2 ...)

Page 56: Punjab Model Villages

PROVINCIAL MV SUSTAINABILIITY COMMITTEE

• Chief Secretary Punjab,

Chairman

• Senior Member, Board of

Revenue

• Chairman, P&D

• Secretary Finance

• Secretary Forest

• Secretary Livestock

• Secretary HUD and PHE

• Secretary Local Government

• Chairman TEVTA

• Chairman PVTC

• Commissioner, DG Khan

Division

• DCO, Muzaffargarh

• Managing Director PEF

• Director General Livestock

• Chief Executive, PRSP

• Mr. Amjad Saqib, Akhuwat

• Mr. Farasat Iqbal, HSRP,

Coopted Member

• The Director General,

PDMA, Convenor

Page 57: Punjab Model Villages

DISTRICT MV MANAGEMENT BOARD (MUZAFFARGARH)

Government

• District Coordination Officer

• Mian Muhammad Imarn

Qureshi, MPA

• Malik Jawas Kamran,

MPA

• Malik Ahmad Yar Hinjra,

MPA

• District Manager, PRSP

• Asst. Dir, PDMA

• EDO (CD)

Non-Government

• Mahmood Textile Mills

• Fazal Cloth Mills

• Hashir Textile Mills

• SG Poly Sacks Factory

• Maqbool Textile Mills.

• Madina Jute Mills.

• Indus Textile Mills.

• Sheikho Sugar Mills.

• Tandilianwala Sugar Mills.

• Thal Jute Mills.

• Two reps of NGOs

Page 58: Punjab Model Villages

School

• Adopted by CARE

• 6 Govt. seats via SNE

• All other recruitment by CARE

• Telenor might also join in

• Punjab Education Foundation (PEF) to subsidize

Page 59: Punjab Model Villages

TEVTA

• CARE has adopted the Women’s wing

• Dastkari markaz to be created

• Will ensure employment

Page 60: Punjab Model Villages

Dispensary

• Mukhtar Sharif Welfare Trust – Running three Pharmaceuticals

– In Top 10 Vet medicine supply firms

• 6 Persons to be employed as per agreement– 1 Lady Doctor

– 1 LHV

– 1 Technician

– Chowkidar, Maid, Sweeper

• Govt. Doctor to continue

• Vet Dispensary: 1 Technician + 1 Chowkidar

Page 61: Punjab Model Villages

Livestock Enclosure

• Nestle’s Corporate Head Mr. Fakhar is working on Feasibility Study

• Livestock Dept. has also contacted Nestle

• Technical Team of Nestle has visited village

• Shed to be given to those who also make Bio-Gas functional

Page 62: Punjab Model Villages

Water Supply, Sanitation & Park

• Govt. will look after Maintenance & Repairs

• Village Organization (VO) to Operate

• District MV – Management Board to provide following at Rs 31,000

– 2 x Sweepers (Rs. 7,000)

• streets & sewerage cleaning

– 1 x Gardner (Rs. 7,000)

– 1 x Tubewell Operator (Rs 10,000)

Page 63: Punjab Model Villages

Basti Cheena , Layyah

63

Page 64: Punjab Model Villages

Wadhy Wali, Layyah

64

Page 65: Punjab Model Villages

Chak Karya, Rojhan

65

Page 66: Punjab Model Villages

Khanekhel, Mianwali

66