38
© Gen Okajima Central Japan Railway Co. Sydney The Japanese Experience: 50 years of safe high speed rail operation Rail Safety 2014 26/03/2014

Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

Embed Size (px)

DESCRIPTION

Gen Okajima, General Manager, Central Japan Railway Company delivered this presentation at the Rail Safety Conference 2014. Rail Safety 2014 brought together the key national decision-makers to deliver new ideas and develop innovative ways to leverage technology for safer outcomes. For more information, please visit http://www.railsafetyconference.com.au/rs14

Citation preview

Page 1: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Gen Okajima Central Japan Railway Co. Sydney

The Japanese Experience: 50 years of safe high speed rail operation

Rail Safety 2014 26/03/2014

Page 2: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Tokaido Shinkansen •  The World’s FIRST High-Speed Rail - In operation since 1964 funded by World Bank (*French TGV since 1981, German ICE since 1991)

•  Even now, the Leading High Speed Rail in the World

Series 0 (1964) 1st Generation

Series N700 (2007) 5th Generation

Page 3: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Key Features of the Tokaido Shinkansen

ZERO passenger injuries or fatalities from train accidents

- Safety

Page 4: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Key Features of the Tokaido Shinkansen

- Punctuality

minutes / train *1 *2

*1 : Including delays due to uncontrollable causes, such as natural disasters

*2 : Standard for train delays; JR Central : “delay” = >1 minute, Europe : “delay” = >15 minutes

Page 5: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

6:00 7:00 8:00 9:00 ・・・ Tokyo

Shinagawa

Nagoya

Shin-Osaka

Shin-Yokohama

Kyoto

Train Schedule Diagrams as of March 2012

*1:Excluding extra service

- Mass Transport

Key Features of the Tokaido Shinkansen

323 trains/day*1 386,000 3 min. intvl at peak time

passengers / day

Page 6: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Safety in the Shinkansen

Technology (Hardware)

Core Concepts

Management/ Workforce (Software)

Page 7: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Safety in the Shinkansen

Technology (Hardware)

Core Concepts

Management/ Workforce (Software)

Page 8: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

研究施設概要(現在) 

Test Track

Test Facilities Building C  

Real Scale Test Structure

New technology- Komaki Research Center

! Opened July 2002 Site area: Approx. 73ha Use area: Approx. 20ha

Employees Research & Development Division: Approx. 120 Planning & Project Division: Approx. 30

Ground area

The Facilities Building A 

Track & Structural Dynamics Simulator

Page 9: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Inner fastening brake disk (Series N700)

・ Reduces the extent of disk deformation caused by friction heat when brakes are operated and also obtains higher frictional force

・ Shortened stopping distance in overhead-line failure (caused by earthquakes, etc.) by improving deceleration

■Employing the central fastening brake disc to shorten braking distance

Central fastening brake disc (Series N700A)

Improved Safety

long linings short

Large deformation Small

deformation

wheel wheel axle axle

Page 10: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Improved Safety

■New decision support tool for measuring flood erosion

Vibration tester (automated)

Vibration tester (manual)

Weight

Automated impact vibration device

Change in natural vibration

No damage Damage

Vibration: large Shakes quickly

Vibration: small Shakes slowly

Vibration tester

Vibration tester

Page 11: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Improved Safety

■Large-scale renovation program

Page 12: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Safety in the Shinkansen

Technology (Hardware)

Core Concepts

Management/ Workforce (Software)

Page 13: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©13

- The use of dedicated tracks exclusively for high-speed passenger rail service

- A fail-safe, reliable, proven Automatic Train Control

(ATC)

Concept of Crash Avoidance on a dedicated track is characterized by two key cornerstones:

Crash Avoidance Concept

Page 14: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Shinkansen

- Complete separation from: •  Freight traffic (pulled by heavy locomotives with lower braking performance)

•  Lower speed passenger traffic (poor running performance)

•  Road traffic

Road Traffic

Zero possibility of catastrophic collision with freight, lower speed passenger and road traffic

Crash Avoidance Concept- dedicated tracks

Page 15: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Brake Pattern

Speed (Running Curve)

Preceding Train

(ii) Information regarding Location of Preceding Train

(iii) On-board ATC System calculates Brake Pattern

ATC Ground Facility

(iv) When Speed > Brake Pattern Applying Brake Command

(i) Detecting the Preceding Train

ATC Ground Facility

- Eliminates possibility of collision with the preceding train - 100% safety record in Japan for over 50 years

Crash Avoidance Concept- ATC System

Page 16: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Crash Avoidance Concept- lighter load, lower cost

Less sturdy structure with light body t

Axle load

* Source : ”World High Speed Rolling Stock,” UIC Website, May 2009 

5 10 15 20

1

2

3

17

16

11.2

Page 17: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

軌道中心間隔4.3m 軌道中心間隔4.5m

R=4,750

R=6,250

TGV

Size of lanes  Small Large

Shinkansen 63㎡

100㎡

Tunnel Cross Section

Source: Japanese Government, Ministry of Land, Infrastructure, Transportation and Tourism

Smaller Infrastructure • Smaller tunnels • Less land acquisition

4.3m 4.5m TGV-POS LGV Est

<320km/h

Crash Avoidance Concept- cost effective

Page 18: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

N700 TGV-POS ICE-3JRC simulation based on public data assuming 50km level tracks between stations the simulation used data from. TGV: “TGV POS PREPARES to enter service,” Railway Gazette International, Dec. 2006, P784-785   ICE: “ ICE Multiple Unit for the European High-Speed Rail Services of German Rail (DB AG) and Netherlands Railways (NS),” Technical Information, Siemens AG

Energy Consumption per Seat (Wh/km/seat)

26

57 55

Crash Avoidance Concept- Eco Friendly

Page 19: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Crash Avoidance concept- reliability

Mixed tracks :

Dedicated tracks :

!!

Page 20: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Reliability/Safety- how can we achieve it?

Technology (Hardware)

Core concepts

Management/ Workforce (Software)

Page 21: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Software - how can we develop it?

Training

Kaizen

Culture moulding

Page 22: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Training

Kaizen

Culture moulding

Software - how can we develop it?

Page 23: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

《Skill development》

We regularly reassess the knowledge and skills of train crews to maintain safe operations.

Simulator for Shinkansen Drivers Simulator for Shinkansen Conductors

Software - training

Page 24: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Catenary wire recovery

Evacuation of passengers

General training sessions simulating actual accidents

Repair of derailed rolling stock.

Page 25: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Employee General Training Centre

Page 26: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Training: employee education

Supervisor Driver

Supervisors

All front staff

Dialogue / Mutual respect

Page 27: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Learning System (CJR e-Learning system)   -Started in 1996 -30 courses   -8,000 employees / yr

Training: Self Development

Page 28: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Training

Kaizen

Culture moulding

Software - how can we develop it?

Page 29: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Software - Kaizen

Identify the

problem

Analyse the

problem

Apply way to

improve process

Check the

results

Standardise

Kaizen for

-safety

-reliability

-better service

-efficiency

-satisfying intellectual curiosity

Page 30: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Software - Kaizen in action Background:

• Mechanical door requires constant maintenance including washing mechanical parts

• Washing oil costs tens of millions of yen

Before:

• Replacement cycle of the washing oil varied by staff

• Staff changed the washing oil when the colour looked ugly

Analysis:

• Dirty oil still has ability to clean the mechanism.

• Impurities are needed to be removed

Critical issue for reliable, safe operation if the door does not open/close as operated

Page 31: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Software - Kaizen in action

New method:

• Reuse the washing oil

• Introduce foreign matter separator

After:

• Cost saved

• Washing quality is more standardised

More reliable, safe rail services with less costs

Cock

Page 32: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Training

Kaizen

Culture moulding

Software - how can we develop it?

Page 33: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Software - culture moulding

• The processes, values and assumptions developed by a group over time, that is then passed on to new members of the group

• How is culture moulded?

1.  Primary: Management behaviour; resources and awards; promotions

2.  Secondary: Organisational structures; design; ceremonies, rituals and stories; formal mission and value statements

Schein 2004.

Page 34: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Software - Culture Moulding (2ndary)

3 Safety requires absolute confirmation and thorough communication.

4 Safety requires cooperation as one beyond assigned tasks.

5 When in doubt, take the action deemed safest and ensure that nothing is missed.

1 Safety is the number one priority of our transportation service.

2 Safety starts with strict adherence to rules and fulfillment of duties, and rests on continual self improvement.

Keep sending the safety-1st message everywhere

Page 35: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

《sleeping management》

Encouraging catnap at their break time in dedicated areas

Data input

Output: advise from medical doctor

• Work at better condition

• Draw attention to health management (safety culture)

Software - Culture Moulding (2ndary)

Page 36: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Primary means make safety culture sustainable

Software - Culture Moulding (Primary)

Management which

• Respond properly against critical safety incidents

• Allocate human/capital resources for making secondary means

• Find and reward staff who pay attention to safety issues

Page 37: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Conclusion

Safety

Core concepts

Technology (Hardware)

Manage ment /

Workforce (Software)

Page 38: Gen Okajima - Central Japan Railway Company - Key safety issues in Japan’s high speed rail network

©

Thank you for your attention.

Please  feel  free  to  contact  us  at:    

Central  Japan  Railway  Company-­‐-­‐Sydney  Suite  501,  Level  5  

20  Hunter  Street,  Sydney  2000  E-­‐mail:    info@jr-­‐central-­‐au.com  

Phone:    (02)  9221  6922