Location:Jalan Jenderal Gatot Subroto No. 12 Jakarta 12930

Page 3: The tower (office) gold land

Located at Jakarta’s Central Business District

Page 4: The tower (office) gold land

Block Plan

Building Data

Land Size : 10,054 sqm

Gross : + 72,662 sqm

(Including Refuge Floor)

+ 69,837 sqm

(Excluding Refuge Floor)

Semigross : + 56,492 sqm

Net Area : + 45,493 sqm

Total Floor Area : + 100,931 sqm

(Including Basement, MSCP &

Refuge Floor)

Total Floor : 55 floors

5 Basement Parking

Page 5: The tower (office) gold land

Lobby

Page 6: The tower (office) gold land

Spacious Office Units

Page 7: The tower (office) gold land

Building Section

Zone Description

High Zone 35th – 61st Floor

High Zone 33rd Floor

High Zone - Full Refuge Floor 32nd Floor

Medium Zone 11th – 30th Floor

Medium Zone – Half Refuge Floor 10th Floor

Low Zone 3rd – 9th Floor

Multi Storey Car Park (MSCP) P1 – P6

Low Zone Upper Ground Floor

Low Zone Ground Floor

Basement B1 – B5

Page 8: The tower (office) gold land

Building Section

Page 9: The tower (office) gold land

Floor Plan

Ground Floor

Unit Size

(net / semigross)

A 361.20 / 448.52

B 349.49 / 433.98

Page 10: The tower (office) gold land

Floor Plan

Upper Ground Floor

Unit Size

(net / semigross)

A 216.89 / 269.32

B 562.57 / 698.57

Page 11: The tower (office) gold land

Floor Plan

Low Zone (3rd – 9th Floor)

Unit SIZE

net / semigross

A 291.73 / 362.26 - 310.51 / 385.58

B 291.73 / 362.26 - 310.51 / 385.58

C 230.59 / 286.34 - 242.50 / 301.12

D 230.59 / 286.34 - 242.50 / 301.12

E 567.27 / 704.41 - 585.32 / 726.82

F 270.20 / 335.52 - 271.22 / 336.79

Page 12: The tower (office) gold land

Floor Plan

Medium Zone (10th Floor)

Unit Size

(net / semigross)

A Refuge area

B 189.90 / 235.81

C Refuge area

D 298.63 / 370.82

Page 13: The tower (office) gold land

Floor Plan

Medium Zone (11th – 30th Floor)

Unit SIZE

net / semigross

A 211.77 / 262.97 - 283.54 / 352.09

B 211.77 / 262.97 - 283.54 / 352.09

C 267.35 / 331.98 - 360.05 / 447.09

D 268.47 / 333.37 - 362.37 / 449.97

Page 14: The tower (office) gold land

Floor Plan

High Zone (33rd Floor)

Unit Size

(net / semigross)

A 200.33 / 248.76

B 200.33 / 248.76

C 254.51 / 316.04

D 214.26 / 266.06

Page 15: The tower (office) gold land

Floor Plan

High Zone (35th – 61st Floor)

Unit SIZE

net / semigross

A 136.39 / 169.36 - 195.76 / 243.09

B 136.39 / 169.36 - 195.76 / 243.09

C 239.93 / 297.93 - 317.02 / 393.66

D 186.63 / 231.75 - 263.74 / 327.50

Page 16: The tower (office) gold land

Building DataDATA DESCRIPTION

Building Name The Tower

Completion Mid 2016

Location Jalan Jendral Gatot Subroto No. 12, Jakarta 12930

Land Area 10,054 sqm

Net to Semigross Efficiency Ratio (%) 80.53%

Lifts 23 Units- 4 Low Zone- 8 Medium Zone- 6 High Zone- 2 Service Lift- 3 Parking Lifts

Safety & Security System Fire alarms, detectors, hydrants, sprinklerPublic AddressIP Closed Circuit Television (CCTV) all public areaVisitor management system c/w access card & barrier gate

Page 17: The tower (office) gold land

Building Data

DATA DESCRIPTION

Floor to Ceiling Height Typical Floor: 2.80 m

Floor Loading Capacity Ground Floor & Typical Floor 250 kg/sqm

Building Façade Double Glass with unitized system finish powder coating

Total Parking Area 633 cars, 108 motorcyclesBasement - 394 cars, 108 motorcyclesMSCP - 234 carsOutdoor - 5 cars

Building Height ± 211.8 m above road level

Typical Floor Plate (semigross area) 868 sqm – 2,436 sqm

IT & Telecommunication - IP PABX Telephone System- Wi – fi internet connection- Mobile signal repeater- Building Automation System

Accessibility To Avoid 3 in 1 Access = Through Jalan Casablanca

Page 18: The tower (office) gold land

Building Data

DATA DESCRIPTION

Power Supply 8,052 kVa100% power back upIndividual power meter for each tenant suite,not including Air Conditioner Up to 65 VA/sqm (semigross)

AC System Water cooled chiller system

Building Façade Double Glass with unitized system finish powder coating

Toilet ex. TOTO

Ceiling Gypsum Board on public areas (2.80 meters height)

Tenants Door Frameless tempered Glass 12mm thickness, double swing panel

Water Supply Clean water 100% from PDAM, Full back-up Deep WellClean water treatment systemWaste water treatment systemRain Harvesting system

Facilities Helipad

All systems will be controlled and interconnected each other using FMS (Facility

Management System)

Page 19: The tower (office) gold land

Field Progress

Last update: March 14th, 2014

Page 20: The tower (office) gold land

Field Progress

Last update: March 14th, 2014