Page 2: Lean six sigma   introduction

Learning Objective• Understanding Lean• Principles of Lean• History of Lean• The Seven Wastes• Understanding Six Sigma• History of Six Sigma• Why & how do we do Six Sigma ?• Six Sigma Organization

www.theapprentiice.com

Page 3: Lean six sigma   introduction

www.theapprentiice.com

Understanding Lean

Page 4: Lean six sigma   introduction

www.theapprentiice.com

What is Lean?

Page 5: Lean six sigma   introduction

www.theapprentiice.com

How Lean Emerged?

LEAN

Japanese automotive

industry

Lead from Toyota

50 years back…

In 1991…

Page 6: Lean six sigma   introduction

www.theapprentiice.com

Competing for the Future (with Gary Hamel)

Why Lean ?

Page 7: Lean six sigma   introduction

Approach to LeanFROM TO

Managing results Managing the process & results

The 5 Who’s The 5 Why’s

Problem-hiding Problem-solving

P-D-P-D tail-chasing P-D-C-A Cycle

Page 8: Lean six sigma   introduction

www.theapprentiice.com

ValueStream

Value

5 Principles of Lean

Pull

FlowPerfection

Page 9: Lean six sigma   introduction

www.theapprentiice.com

Value Value is best defined as what is the customer willing to pay for

• Value-adding activities transform the product closer to what the customer actually wants.

• An activity that does not add value is considered to be waste.

Value adding Process• A process step

that transforms or shapes a product or service which is eventually sold to a customer

• Ex: Assembling product parts

Non-Value adding Process• Those process

steps that take time, resources, or space, but do not d value to the product or service

• Ex: Transporting parts from one machining process to the next

“Business Value adding” Process• A Non-Value

adding process that is required by law, regulation, or customer request to operate the business

• Ex: Filling Tax Returns

Page 10: Lean six sigma   introduction

Tasks can only be defined as “Value-ding” by the Customer

• Registration• Waiting• Pre-screen• Diagnosis

How long will you spend at the hospital?

What is the value?

How long will you be at the park?

• Ride the rides• Wait in line• Eat the food• Play the games

What is the value?

Tasks can only be defined as “Value-adding” by the Customer

ELS CORE CONCEPTS

Value

www.theapprentiice.com

Page 11: Lean six sigma   introduction

www.theapprentiice.com

Distinguish VA from NVA Activities

Activity

Selecting candidates to interview for hire

Completing expense report

Machining part

Assembling product parts

Walking to printer to pick up documents

Transporting parts from one machining process to the next

Waiting for a response from a supplier

Page 12: Lean six sigma   introduction

www.theapprentiice.com

What is “waste”?

Muda

Mura

Muri

• Any activity that consumes resources without creating value for the customer

• Unevenness in a process; for example an uneven work pace causing people to hurry and wait

• Overburdening of resources (such as people or equipment)

Types of Waste Descriptions

1

2

3

ELS CORE CONCEPTS

Page 13: Lean six sigma   introduction

www.theapprentiice.com

The Seven Wastes

• Waste is called “muda” in Japanese

• Waste is strain on an organization's time & resources

• Waste does not add value to the customers

• The more an organization can reduce waste, the better

T - I – M – W – O – O - D

Value Added (VA) Non Value Added (NVA)

Page 14: Lean six sigma   introduction

www.theapprentiice.com

The Seven WastesTransportation is the unnecessary movement of materials or information. • Movement of materials between Warehouses & Plants• Moving materials, Files, documents & mails

Inventory is any material or supplies in excess of the appropriate quantity, at appropriate time. • Excess Raw material, In-process (WIP) and finished goods• Long Cycle times, carrying cost• Risk of obsolescence, damage

Motion is any movement of people that does not add value to the product or service. • In-efficient placement of frequently used supplies/tools• People spend more time moving around than adding value to

customer

Page 15: Lean six sigma   introduction

www.theapprentiice.com

The Seven Wastes Cont…Waiting – for man, machine, material or information. • Customers waiting for products, services or information• Excessive cycle time between process steps• Waiting for files, information & approvals

Overproduction – making more, earlier or faster than the next process can consume • Larger batch size, insurance for customer order spikes or

manufacturing problems• Printing reports, replying all on e-mails• Most dangerous of all other wastes

Over-processing – any effort that doesn’t add value to the product or service from customer’s perspective • Complicated processes with un-necessary & redundant steps• Multiple approvals / signatures, un-necessary forms/details• Extra packing, Re-work loops

Page 16: Lean six sigma   introduction

www.theapprentiice.com

The Seven Wastes Cont…

Defects – are products, services or information that are inaccurate and/or incomplete • Cause serious customers dissatisfaction• Result in high cost due to rework / customer returns

Under- Utilized Talent – not utilizing people skills, experiences, knowledge or creativity to its potential • Lack of empowerment • Lack of cross training• Lack of people centric culture which encourage participation &

suggestions from employees

and Finally the 8th waste…

Page 17: Lean six sigma   introduction

www.theapprentiice.com

Once Waste is identified

What you do?

• Eliminate – the cause of the waste wherever possible

• Simplify – the process or step that is creating the waste

• Streamline VA – complex processes

Maximize VA Eliminate NVA

Page 18: Lean six sigma   introduction

www.theapprentiice.com

Why Companies do Six Sigma?

Page 19: Lean six sigma   introduction

www.theapprentiice.com

COST + PROFIT = SALES PRICE

MARKET PRICE - COST = PROFIT

1. To deal with a world of declining product prices!

Accelerate our rate of improvement in quality and productivity faster than the competition

Why Six Sigma?

Page 20: Lean six sigma   introduction

www.theapprentiice.com

2. To successfully compete withthe best companies in the world!

Accelerate qualityimprovement efforts andproductivity faster thanall of our competition!

3. To establish a common language andapproach across differentfunctions and branches of our business!

4. Develop the next generation of leaders!

Why Six Sigma?

Page 21: Lean six sigma   introduction

www.theapprentiice.com

What is Six Sigma?

Page 22: Lean six sigma   introduction

www.theapprentiice.com

A philosophy of doing business that focuses on the continuous improvement of processes.(Doing business = provide any products or services)

Six Sigma focuses on defect prevention through the use of statistical tools, rather than defect detection through inspection.

Six Sigma is a quality improvement philosophy that focuses on eliminating defects through reduction of variation in a process

Six Sigma is ….

Page 23: Lean six sigma   introduction

www.theapprentiice.com

History of 6σ• Initially developed at Motorola by Bill Smith in 1986

• Used old concepts and combined them• Way of measuring defects and improving quality• New methodology for reducing defects below 3.4 DPMO

(defects per million opportunities)

Page 24: Lean six sigma   introduction

www.theapprentiice.com

History of 6σ• Motorola claimed in 2006 that over $17 billion in savings can be attributed to

Six Sigma• Many companies since Motorola have also adapted Six Sigma

• General Electric• Bank of America• Caterpillar• Honeywell• 3M• Amazon.com• Boeing• WhirlpoolAnd the list goes on…

Page 25: Lean six sigma   introduction

www.theapprentiice.com

óSigma is a letter in the Greek alphabet.

óThe term “sigma” is used to designate the distribution/spread around the average of any process or procedure.

óFor a business or manufacturing process, the sigma value is a metric that indicates how well that process is performing. The higher the sigma value, the better.

óSigma measures the capability of a process to perform defect-free. The sigma value also indicates how often defects are likely to occur.

óAs sigma values increase, costs go down, cycle times and customer satisfaction goes up.

Metric Benchmark Vision Philosophy Method Tool Symbol Goal Value

What is Sigma ?

Page 26: Lean six sigma   introduction

www.theapprentiice.com

s = Standard Deviation = Measure of variation around the average

Big s = Lot’s of variation = BAD!!!

sLevel = 1/2 the number of standard deviations (s) that will fit between the Spec limits when the process is centered

Big sLevel = Lot’s of capability = GOOD!!!

s ss ss sssssss = 12/2 = 6 s

s sssssss

C ustomer S pecs

= 8 /2 = 4s2

s has different uses and interpretations:

Different Uses of sigma

Page 27: Lean six sigma   introduction

www.theapprentiice.com

Important Points About Variation

No two things are alike; they always varyVariation always existsWe can’t always observe or measure variationThe more variation there is, the more it mattersThe opposite of variation is prediction

- We are not as interested in what has happened as in what is about to happen

- The degree to which we can predict depends on the amount and nature of variation

Page 28: Lean six sigma   introduction

www.theapprentiice.com

• Let’s have a look at two different airline pilots flying the same plane!

• Pilot A lands 10 consecutive times within the boundaries of the runway. He met the specification.

Variation Around a Target

Page 29: Lean six sigma   introduction

www.theapprentiice.com

• Pilot B also lands 10 consecutive times within the boundaries of the runway!

Which pilot would you fly with?

Variation Around a Target

Page 30: Lean six sigma   introduction

www.theapprentiice.com

Excess inventory

Indirect Costs

R&ARejects

Engineering change ordersLong cycle times

Time value of moneyMore Set-ups

Expediting costsWorking Capital allocations

InspectionScrap

Rework

Lost salesLate delivery

Excessive Mat’l Orders/PlanningLost Customer Loyalty

5-8%

(less obvious)Lost Opportunity

Direct Costs

15-20%

Overtime

Cost of Poor Quality (COPQ)

Page 31: Lean six sigma   introduction

www.theapprentiice.com

• Cost of poor quality for an average company can exceed 20 - 40 % of sales revenue!

• In almost every company, where the cost of poor quality is unknown, it exceeds the company’s profit margin!

• Most improvement efforts are not tied to bottom line results. As a result, gains are sub-optimized and not reflected in the accounting statements!

COPQ continues

Page 32: Lean six sigma   introduction

www.theapprentiice.com

How Much Can Variation Cost?

• Studies show that the cost of poor quality can be 25% of sales revenue for 3s companies!

• For 6s companies, the cost of poor quality has dropped to less than 5%!

0%5%

10%15%20%25%30%

3 4 5 6 7

% o

f Sal

es

Sigma Level

Cost of Poor Quality at Progressive Sigma Levels

Page 33: Lean six sigma   introduction

www.theapprentiice.com

Key Success Factors for Six Sigma

• Committed leadership from top management• Integration with existing initiatives, business strategy,

and performance measurement• Process thinking• Disciplined customer and market intelligence

gathering• A bottom-line orientation and continuous

reinforcement and rewards• Training

Page 34: Lean six sigma   introduction

www.theapprentiice.com

How Do We Do Six Sigma?

Page 35: Lean six sigma   introduction

3σ 2σ 1σ 1σ 2σ 3σ

~3,000 DPMO

6σ 4σ 2σ 2σ 4σ 6σ5σ 3σ 1σ 1σ 3σ 5σ

~3.4 DPMO

6σ Process

shift

Basic Principle for applying Six Sigma

Page 36: Lean six sigma   introduction

www.theapprentiice.com

Six-Sigma Problem Solving Approach

1. Define

2. Measure

3. Analyze

4. Improve

5. Control

Page 37: Lean six sigma   introduction

www.theapprentiice.com

DMAIC - Define

• Identify customers and their priorities

• Identify business objectives

• Select a six sigma project team

• Define the Critical-to-Quality (CTQ’s) characteristics that the customers consider to have the most impact on quality

Page 38: Lean six sigma   introduction

www.theapprentiice.com

DMAIC - Measure

• Determine how to measure the processes

• Identify key internal processes that

influence CTQ’s

• Measure the defect rates currently

generated relative to those processes

Page 39: Lean six sigma   introduction

www.theapprentiice.com

DMAIC - Analyze

• Determine the most likely causes of

defects.

• Identify key factors that are most likely

to create process variation.

Page 40: Lean six sigma   introduction

www.theapprentiice.com

DMAIC - Improve • Identify means to remove causes of the defects.

• Confirm the key variables and quantify the effects on CTQ’s

• Identify maximum acceptable ranges for the key variables and a system to measure deviations of the variable

• Modify the process to stay within the acceptable ranges

Page 41: Lean six sigma   introduction

www.theapprentiice.com

DMAIC - Control

• Determine how to maintain the improvement

• Put tools in place to ensure that the key variables remain within the maximum acceptable ranges under the modified process

Page 42: Lean six sigma   introduction

www.theapprentiice.com

Organization for Six Sigma

Page 43: Lean six sigma   introduction

Organization for Six Sigma

Six Sigma Champions:Project sponsorsand mentors

Six Sigma Master Black Belts:Full-time program managers, PMO heads and educators

Six Sigma Black Belts:Full-time projectmanagers

Six Sigma Green Belts:Part time projectcoordinators andassistants

Page 44: Lean six sigma   introduction

www.theapprentiice.com

• Champion:- creates the vision of 6s for their business- undergoes basic statistical training- defines the path to implement 6s- breaks barriers that prevent improvements- mentors BB and MBB- assists in deploying resources- reports status of activities

• Master Black Belt:- develops 6s program and training materials- trains management and BB- works with external suppliers/customers to extend 6s program- coaches/mentors BB through projects, advises them in usage of tools

and interpretation of the data- consults with management on strategic and tactical planning- develops 6s culture and BB network

Roles & Responsibilities

Page 45: Lean six sigma   introduction

www.theapprentiice.com

• Black Belt:- change agents- selected for technical proficiency, interpersonal skills and

leadership- provides expertise to improvement teams- implements quality improvement activities- develops and trains GB- developed by statistical training, on the job application

and mentored reviews- sets direction to teams, manages risk, transfers

knowledge, discovers new perspectives and obtains financial results

Roles & Responsibilities

Page 46: Lean six sigma   introduction

www.theapprentiice.com

• Green Belt:- first line defense against defects- trained in basic statistical tools- identifies opportunities- implements solutions- maintains the improvements

• Team Member:- participates in project teams- supports goal of project (within their area of responsibility)- continues using the 6s methodology that he has learned during the project

Roles & Responsibilities

Page 47: Lean six sigma   introduction

www.theapprentiice.com

Thank-you

Page 48: Lean six sigma   introduction

Copyright, 2016 by “The Apprentiice” . This presentation, including the information contained herein and any associated commentary, ("Materials") is provided as a service of The Apprentiice. These Materials are based on publicly available information as well as the knowledge and experience of The Apprentiice’s employees at time of drafting; however future accuracy cannot be guaranteed. As such, these Materials should not be solely relied upon without, or used as a substitute for, future consultation with The Apprentiice. Any further use of these Materials requires the express written consent of The Apprentiice.

Page 49: Lean six sigma   introduction

www.theapprentiice.com

The following companies claim to have successfully implemented Six Sigma in some form or another:

3M Amazon.com BAE Systems Bank of America BD Medical Bechtel Corporation Boeing Caterpillar Inc. Computer Sciences Corporation Convergys Credit Suisse Damco Deere & Company Dell Denso Eastman Kodak Company Evonik Industries

Ford Motor Company General Electric Inventec Maersk McKesson Corporation Motorola Mumbai's dabbawalas Northrop Grumman PolyOne Corporation Raytheon Sears Shop Direct Group Starwood Hotels & Resorts Worldwide Unipart United States Army United States Marine Corps The Vanguard Group Wipro