Carmen Copper Corporation The Carmen Copper Mine An Emerging Concentrate Producer 1 September 2010

The Carmen Copper Mine

Embed Size (px)

DESCRIPTION

Carmen Copper Corporation is majority owned by Atlas Consolidated Mining & Development Corp…is located on the Island of Cebu, central Philippines…16kms from the coastal city of Toledo…Mill throughput has steadily increased to reach over 35,000 tpd ore processed…

Citation preview

Page 1: The Carmen Copper Mine

Carmen Copper Corporation

The Carmen Copper Mine An Emerging Concentrate Producer

1 September 2010

Page 2: The Carmen Copper Mine

2

No representation or warranty, express or implied, is made in relation to the accuracy or completeness of the information and opinions expressed in the course of this presentation. No responsibility is accepted by Atlas Consolidated Mining and Development Corporation or any of its subsidiaries (“Atlas Mining”) or any of their representatives, officers, employees, agents or advisors for any of the information or for any action taken by you on the basis of the information or opinions expressed in the course of this presentation. In particular, this document contains certain financial information and results of operation, and may also contain certain projections, plans, strategies, and objectives of Atlas Mining, that are not statements of historical fact which would be treated as forward looking statements within the meaning of applicable law. Forward looking statements are subject to risks and uncertainties that may cause actual events and Atlas Mining’s future results to be materially different than expected or indicated by such statements. No assurance can be given that the results anticipated by Atlas Mining, or indicated by any such forward looking statements, will be achieved.

Geological Resource estimates relate to the original the Feasibility Study estimate which is both JORC & PMRC compliant and which was defined at a grade of 0.3% copper. This database of information was used to estimate the geological resource at a lower copper grade of 0.2% copper. Mining reserves need to be treated with caution as all the mine planes are currently being reviewed with respect to the best method of extracting the ore, waste tailings placement and waste rock placement.

This document does not constitute an offer or invitation to acquire shares in any jurisdiction. These materials are not for distribution, directly or indirectly, in or into the United States. They are not an offer of securities for sales into the United States. The shares may not be offered or sold in the United States or to, or for the account or benefit of, US persons (as such term is defined in Regulation S under the US Securities Act of 1933) unless they are registered or exempt from registration. There will be no public offer of shares in the United States.

Important Notice and Disclaimer

Page 3: The Carmen Copper Mine

3

Atlas Consolidated Mining & Development Corp.

Carmen Copper Corporation is majority owned by

Atlas Consolidated Mining & Development Corp…

CASOP = Crescent Asian Special Opportunities Portfolio

Copper

Nickel

Water

Carmen Copper Atlas – 55.5% Casop – 45.5%

Berong Nickel Atlas - 25.2% Ulugan Nickel Atlas - 42.0%

AQUAtlas Atlas - 100%

Page 4: The Carmen Copper Mine

0

50

100

150

200

250

300

Free

po

rt

Bat

u H

ijau

Sar

Ch

esh

meh

Dex

ing

Kh

ano

ng

(Sep

on

)

Ph

u K

ham

Jin

chu

an

Ca

rme

n C

op

pe

r

Mid

uk

Ch

uxi

on

g

Cay

eli

Sun

gu

n

Do

ngg

uas

han

Hin

du

stan

Cu

S&K

(SX-

EW)

Ash

ele

Zho

ngt

iao

shan

Lala

Do

ho

ngs

han

Ph

ilix

Co

pp

er

Pro

du

ctio

n -

ktp

a

Top 20 Asian Copper Producers

Carmen is the largest copper producer in

the Philippines, and in the top 10 in Asia…

Average annual Cu Production

50kt pa

553

4

Page 5: The Carmen Copper Mine

Copper Supply & Demand Dynamics

5

Page 6: The Carmen Copper Mine

Current copper growth is centered on

China…

Source: Bhpbilliton preentation, Sept 2009

China +9%

China

USA

Germany Korea

6

Page 7: The Carmen Copper Mine

China’s urban population is expected to

reach 1 billion people by 2025…

Source: Bhpbilliton, May 2010 7

Page 8: The Carmen Copper Mine

Demand for copper and other metals is

likely to double over the next 15 to 20 Yrs

Source: Rio Tinto presentations

Today

Copper

8

Page 9: The Carmen Copper Mine

62 5444

3641

47

2000 2010 2020

Low Risk

Medium Risk

High Risk

60

15

30

10

85

1980s 1990s 2000s

Exposed

Covered

Blind 1.3

1.4

1.1

1980s 1990s 2000s

% Cu

95

133

Open Pit Underground

US c/lb Cu

Copper supply constraints are growing…

Greater Depth Lower Grades Higher Costs Higher Sov. Risk

C1 Industry Costs Indicative depth of discoveries

Average grade of ore mined

Location of copper supply

Source: Rio Tinto presentations 9

Page 10: The Carmen Copper Mine

The global shortage of copper concentrate

is expected to continue…

Balanced

Shortfall = lower TCs/RCs

Source: Bhpbilliton, 2009 10

Demand

Supply

Page 11: The Carmen Copper Mine

Operations Update

11

Page 12: The Carmen Copper Mine

Carmen Copper Mine is located on the

Island of Cebu, central Philippines…

12

Page 13: The Carmen Copper Mine

The Carmen mine site is located approx.

16kms from the coastal city of Toledo…

CCC Leases

13

Toledo City

Page 14: The Carmen Copper Mine

Open pit mining is by conventional

truck & shovel operation…

14

Ore Mined = 15.87Mt @ 0.31% Cu Waste Moved = 20.84Mt

14

Page 15: The Carmen Copper Mine

Copper concentrate is produced by

traditional froth flotation methods…

Ball Mills@7

Drum Filters

Flotation Cells 15

Coarse Ore Stockpile

Page 16: The Carmen Copper Mine

The Geological Resource is JORC compliant,

but based on a 0.3% Copper cut-off grade…

Tonnage Grade Metal

Reserves Mt % Cu Cu kt

Openpit: ``

South Lutopan OP 14.5 0.33 47.9

Noth Lutopan OP 21.4 0.32 68.5

South Carmen OP 9.1 0.31 28.2

Total Open Pit 45.0 0.32 144.5

Underground:

Carmen Lift 1 UG 132.0 0.40 528.0

Total Reserves 177.0 0.38 672.5

Feasibility Study ReservesMt Grade Contained

Resource % Cu Cu kt

Openpit: ``

Carmen OP 29.9 0.37 110.6

Lutopan OP 31.9 0.36 114.8

Biga OP 162.5 0.39 633.8

Total Open Pit 224.3 0.37 859.2

Underground:

Carmen UG 246.1 0.42 1,033.6

Lutopan UG 313.0 0.42 1,314.6

Biga UG 90.2 0.41 369.8

Total Underground 649.3 0.42 2,718.0

Total Reserves 873.6 0.41 3,577.3

Remaining Resource Base

Note 1: Excludes low grade dumps – 1.2 billion tonnes

Note 2: Geological boundary (envelope) @ 0.2% Cu & a Cut-off grade for resource @ 0.3% Cu

JORC Compliant Resource/Reserves Reserves are sufficient for a mine life of approx. 10-12 years Only ~25% of the total resource is being mined 16

Page 17: The Carmen Copper Mine

253

484

345

726

276 289

0

200

400

600

800

1,000

1,200

1,400

1,600

0.3% Cu 0.2% Cu

Mil

lio

n T

on

ne

s

1,499

874

With higher Cu prices, all ore above 0.2% Cu grade is

economic, resulting in an increased resource tonnage

Cut-off-grade is dependent on forecast copper prices Opens up the potential for substantially more mineable ore & longer mine life

New JORC/PMRC compliant resource estimate is being currently prepared

kt Cu Metal Ore % Cu

3,577 0.41

4,837 0.32

0.3% Cu COG

0.2% Cu COG

Carmen

Lutopan

Biga

[COG = Cut-off-grade] 17 Note: Please refer to “Disclaimer” on Page 2 regarding Resource Estimates

Page 18: The Carmen Copper Mine

The Carmen ore body can be readily mined

by either OP or UG mining methods…

UG Block Cave

18

Open Pit Mining

Stage 3 : 241 Mt Ore @ 0.33% Cu UG: 234 Mt Ore @ 0.36% Cu

Page 19: The Carmen Copper Mine

Stage 3 : 217 Mt Ore @ 0.29% Cu

Incremental Summary: Stage 1: 57Mt @ 0.33 Cu 37Mt Waste [0.64:1] 150kt Cu Metal Stage 2: 49Mt @ 0.31% Cu 59Mt Waste [1.20:1] 101kt Cu Metal Stage 3: 111Mt @ 0.29% Cu 131Mt Waste [1.18:1] 226kt Cu Total 217 Mt Ore 227Mt Waste 477kt Cu Metal

Lutopan Pit will be mined until a decision is

made on the Carmen ore body…

19

Page 20: The Carmen Copper Mine

Near Mine Site Upside

20

Page 21: The Carmen Copper Mine

Approx. 1.2 Bt of low grade dumps provide

the opportunity for Cu leaching…

21

Page 22: The Carmen Copper Mine

Next Steps: 1. Further modeling 2. IP survey over anomalies 3. Define drill targets 4. Drill most prospective targets

22

Aeromagnetic surveys have identified high

potential targets for drill testing…

Page 23: The Carmen Copper Mine

Actual Production Performance &

Forecasts

23

Page 24: The Carmen Copper Mine

Mill throughput has steadily increased to

reach over 35,000 tpd ore processed…

24

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

1-J

an-0

9

1-F

eb

-09

1-M

ar-0

9

1-A

pr-

09

1-M

ay-0

9

1-J

un

-09

1-J

ul-

09

1-A

ug-

09

1-S

ep

-09

1-O

ct-0

9

1-N

ov-

09

1-D

ec-

09

1-J

an-1

0

1-F

eb

-10

1-M

ar-1

0

1-A

pr-

10

1-M

ay-1

0

1-J

un

-10

1-J

ul-

10

Gra

de

-%

Cu

Ton

nag

e p

er D

ay

Mill Throughput - Jan'09 to Jul'10

Daily Ore Milled [LHS] Mth Ore Milled t [LHS] Daily Head Grade %Cu [RHS]

Page 25: The Carmen Copper Mine

0

1

2

3

4

5

6

0'0

8 ND

'08

J'0

9 FM A M

J J A S O ND

'09

J'1

0 FM A M

J J

Pa

ya

ble

Cu

-M

illi

on

s lb

s

Payable metal production has increased

in line with mill throughput…

Payable Copper, M lbs Gold in Concentrate, oz

Payable copper varies with- copper head grades mill throughput mill recovery 25

0

200

400

600

800

1,000

1,200

0'0

8 ND

'08

J'0

9 FM A M

J J A S O ND

'09

J'1

0 FM A M

J J

Go

ld in

Co

nce

ntra

te

-o

z

Page 26: The Carmen Copper Mine

Over 35,000t copper in concentrate

has been shipped to Asian customers…

Arsenic <0.003%

Lead <0.03%

Zinc <0.14%

Mercury <0.04ppm

Selenium <0.016%

Cadmium <0.2%

Antimony <0.02%

Clean Concentrate:

26

Tonnes: 122,794 DMT

Copper 28.54 % [35,043 t Cu]

Gold 2.83 g/t [11,155 oz Au]

Silver 26.02 g/t [102,750 oz Ag]

Total Shipments to Date = 25

Page 27: The Carmen Copper Mine

Copper sales are forecast to exceed 60,000

tonnes in concentrate in 2014…

010203040506070

20

08

a2

00

9a

20

10

e

20

11

e2

01

2e

20

13

e2

01

4e

20

15

e

Go

ld i

n C

on

c. k

oz

050

100150200250300350

20

08

a2

00

9a

20

10

e

20

11

e2

01

2e

20

13

e2

01

4e

20

15

e

Mag

ne

tite

-D

MT

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

20

08

a

20

09

a

20

10

e

20

11

e

20

12

e

20

13

e

20

14

e

20

15

e

Pay

able

Co

pp

er

-To

nn

es

27 Note 2: “a” = actual; “e” = estimate

23,843

Note 1: 2010 Jan-July Actual Payable Cu Produced = 13,794t

Page 28: The Carmen Copper Mine

Gross sales revenue is forecast to exceed

US$400m in 2013…

Assumptions: Cu = US$7,050/t Au = US$1,100/oz Ag = US$18/oz Mag.= US$ 50/t

Note 1: All figures exclude Mark-to-Market adjustments Note 2: “a” = actual; “e” = estimate

0

100

200

300

400

500

600

20

08

a

20

09

a

20

10

e

20

11

e

20

12

e

20

13

e

20

14

e

20

15

e

Gro

ss S

ale

s -U

S$M

28

Page 29: The Carmen Copper Mine

EBITDA is forecast to exceed US$250m in

2014…

Note 1: EBITDA = Earnings before Interest, Tax, Depreciation & Amortization Note 2: “a” = actual; “e” = estimate

-50

0

50

100

150

200

250

300

350

20

08

a

20

09

a

20

10

e

20

11

e

20

12

e

20

13

e

20

14

e

20

15

e

EBIT

DA

-U

S$M

29

73

Page 30: The Carmen Copper Mine

Operating Costs are declining, and C1

industry costs fall to below US$0.50/lb Cu…

30

0.00

0.40

0.80

1.20

1.60

2.00

2.40

2.80

3.20

3.60

4.00

Jan

'10

Feb

'10

Mar

'10

Ap

r'1

0

May

'10

Jun

'10

Jul'1

0

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

Op

era

tin

g C

ost

s -

US$

/lb

Cu

Operating Costs - US$/lb Cu - 2010Corp O'Head

Depreciation

Roy/Tax

Realization

Admin

Mine Serv

Processing

HE Maint

OP Mining

Power

C1 Costs

Cu Price

Page 31: The Carmen Copper Mine

CCC is forecast to fall to around the 50th

percentile on the Industry Cost curve [C1]…

CCC

2010

12.7Mt Cu

CCC expected operating range

2010 2011

2012

31

Page 32: The Carmen Copper Mine

Sustainable Development

32

Page 33: The Carmen Copper Mine

Sustainable development is integral to our

operations & our license to operate…

Safety, health & environment is core to our business: Policies and standards are being developed Aim to achieve equivalent of international standards ISO 14001 and ISO 18001

Stakeholder engagement is continuous and on-going

Corporate social responsibility taken seriously through proper implementation of the following:

33

Social Development and Management Program Environmental Protection and Enhancement Program Safety and Health Program

Page 34: The Carmen Copper Mine

Reforestation…

34

Page 35: The Carmen Copper Mine

Nursery facilities…

35 Few of the forest tree species raised in the nursery and used primarily for mine revegetation

purposes (counter clockwise: auri, agoho, and acid ipil-ipil).

Page 36: The Carmen Copper Mine

SILT MANAGEMENT

• To ensure that silts are not discharged to the river

systems, settling ponds and gabion dams are built in Sigpit River and Ilag River.

Sigpit Settling Pond Sigpit Gabion Dam

With its strong CSR program, CCC sees no obstacle in the road ahead. Siltation management…

Page 37: The Carmen Copper Mine

Education…

37

Established in 1965 by Atlas Mining, the school is now a college with over a thousand students coming from the mine’s host communities. CCC employee dependents get 60% tuition fee subsidy.

Page 38: The Carmen Copper Mine

Employment…

38

PERIOD DATE DIRECTLY EMPLOYED

Suspension Period 1994-2006 250

Rehabilitation Period 2007-2008 6,500

Operation July 2010 3,680

Page 39: The Carmen Copper Mine

Livelihood projects…

39

SHOE-MAKING FURNITURE -MAKING

MANGO FRUIT-GROWING EMPLOYEES’ COOPERATIVE

Page 40: The Carmen Copper Mine

Providing financial support to De La

Salle-Andres Soriano Memorial

College for trainers' honoraria last

May 23, 2009.

COMPUTER

LITERACY

AUTOMOTIVE

SKILLS

SEWING

SKILLS

WELDING

SKILLS

Technical skills training…

40

Page 41: The Carmen Copper Mine

CONCRETE CULVERT AT SPILLWAY (TINAHAS AT CARMEN 3-TINAHAS-MAGDUGO ROAD )

Construction of Water Tanks & Wells

Rehabilitation of the Masaba Channel

SILT MANAGEMENT With its strong CSR program, CCC sees no obstacle in the road ahead. Community infrastructure…

Page 42: The Carmen Copper Mine

With its strong CSR program, CCC sees no obstacle in the road ahead. Keeping the community stakeholders

informed …

Page 43: The Carmen Copper Mine

Mayor Arlene Zambo Gov. Gwen Garcia

A booming economy at Brgy. Don Andres Soriano

Community acceptance of the mine project

is strong…