North Sumatera Hydro Power Tara F Khaira, MBA
Project Location
• North Sumatera Hydro Project is located in
North Sumatera Province, Indonesia
• North Sumatera is one of strategic province in Indonesia, where plantations, industry and trade have significant role on the economic developments.
• The Location could be reached by 2 hours air transport from Jakarta to Medan and 30 minutes flight from Medan to local airport. Then continue by land transportation around 1 hours to the nearest town and another 2-3 hours to project sites.
HYDROLOGY
• CATCHMENT AREA
• CLIMATOLOGY
• MONTHLY & ANNUAL RAINFALL
• FLOW DURATION CURVE
• FLOOD DESIGN DISCHARGE
• POWER GENERATION OPTIMIZATION METHOD
AVERAGE MONTHLY RAINFALL
• Generally rainfall occurs the whole years. • Mostly high rainy-season: September –December • Highest rainfall: September (365 mm) • Dry-season: June –July • Most driest month : July (102 mm ) • Average annual rainfall: 2325 mm “High Rainfall Area” based on Isohyet Rainfall
Map (2000 –2500 mm/yr)
FLOW DURATION CURVE (FDC)
• Average river discharge is designed at Intake Weir dependability of occurrence of 55%.
• Average annual rainfall (1977-1999): 2326.2 mm/yr High Rainfall Area.
• Favorable hydrology conditions to construct mini hydro power plants
GEOLOGY
• PHYSIOGRAPHY
• STRATIGRAPHY AND REGIONAL GEOLOGY
• PROJECT GEOLOGY
PHYSIOGRAPHY
• Project site is located at Bukit Barisan mountain area
• Lithology: Tapanuli Group sedimentary rock, Barus Formation sedimentary rock, Toba Tuff vulcanic rock and alluvium covered.
REGIONAL GEOLOGY
• Kluet Formation (sedimentary rock): metaquartz sandstone, metachalk, slate and phylite.
• Barus Formation (sedimentary rock): sandstone, limestone, mudstone, limestone and conglomerate bed.
• Toba Tuff: riodacyte partly welded.
PROJECT GEOLOGY
Intake weir and powerhouse
• Welded Tuff; fresh to slightly weathered, brown to grey color, with a composition fine sized grains of quartz sand, strongly cemented by silt/clay, compact.
Intake, settling basin, headrace channel, headpondand penstock
• Pumice Tuff; white color with brown
spots, medium to coarse sand grains, contains many fragments of pumice, slightly to moderately weathered, fragile and easily eroded if uncovered, compact.
• Permits
– Principal Permit
– Location Permit
• Pre FS
– Topography
– Hydrology
Early stage option available for investors...
• Potential electricity generation up to 17 MW
• Our company has experience in PPA process with PLN and land acquisition
• We are pleased to offer you an unprecedented and limited-time opportunity to purchase up to 90% shares of our stock and become stakeholder in this SPV DONE!