41
Presentation to Project Approval & Monitoring Committee (PAMC) Part-II 5 th March 2012

Bihar major industries in recent period

Embed Size (px)

DESCRIPTION

Industrial investments in Bihar in recent period

Citation preview

Page 1: Bihar   major industries in recent period

Presentation to

Project Approval

&

Monitoring Committee (PAMC)

Part-II

5th March 2012

Page 2: Bihar   major industries in recent period

GRANT RELEASE Grant Stage No. Of Projects Release Amount

(`in lacs)

1st installment 2 projects 23.66

For 1st & 2nd

installment 14projects 934.35

For 2nd installment 2 projects 179.00

For 3rd installment 3 projects 340.24

For 4th installment 1projects 83.12

Status Report (on Hold) 3Projects ---

Total 25 Projects 1560.37

Page 3: Bihar   major industries in recent period

Projects - 1st installment of Grant Release

Vishwanath Agro Foods Pvt. Ltd.

Uttri Bihar Milk Food Company Pvt. Ltd.

Page 4: Bihar   major industries in recent period

•Project Type: Corn Milling Unit

• Location: Village Silout, Tahsil, Kudhni,

district Muzaffarpur

•Project Cost: ` 521.18Lacs

• Grant Sanctioned: ` 156.31Lacs

• Bank Loan status: under process

•Investment till date: ` 56.57 Lacs

• Recommended for 1st Installment– ` 15.63Lacs

Vishwanath Agro Foods Pvt. Ltd.

Page 5: Bihar   major industries in recent period

Uttri Bihar Milk Food Company Pvt. Ltd.

Project Type: Milk Processing Unit

Location: Dalsinghsarai, Samastipur

Project Cost: ` 282.59 Lacs

Grant Sanctioned: ` 80.37Lacs

Bank Loan: Yet to achieve

Investment till date: ` 29.04 Lacs

Recommended for 1st & 2nd Installments– ` 8.03Lacs

Page 6: Bihar   major industries in recent period

Projects - 1st & 2nd installment of Grant Release

1.Gaytri soya Food Products

2.MBNB Cold Storage Pvt. Limited

3. Vaishali Enterprises and Cold Storage Pvt. Ltd.

4.Anuj Dairy Private Limited

5.Maa Mundeshwari Agro Mills Pvt. Ltd

6.Narmadeshwar Rice Mills Pvt.ltd

7.Anmol feeds Pvt.Ltd

8.Vina Paras Rice Mills Pvt. Ltd

9.Shirdi Foods Pvt. Ltd

10.Ishwar Raj Beverages Pvt Ltd

11.Bhojpur Rice Mill Pvt. Ltd.

12.Maa Bhagwati Kalyanpur Cold Stores Pvt.Ltd

13.Amit Solvex

14.Kritika Rice Mill Pvt. Ltd

Page 7: Bihar   major industries in recent period

Gayatri Soya Food Products

• Project Type: soybean processing unit

• Location: Village Bishunpur Pankari , District-Patna

•Project Cost: ` 45.94Lacs

• Grant Sanctioned: ` 14.34Lacs

• Bank Loan: ` 31.75lacs (PNB)

• Investment till date: ` 47.74 Lacs

Recommended for 1st & 2nd Installment– ` 4.29Lacs ( to be transferred

to PNB bank)

Page 8: Bihar   major industries in recent period

MBNB Cold Storage PRIVATE LIMITED

Project Type: RABC

Location: Teghra, Begusarai

Project Cost: ` 999.12 Lacs

Grant sanctioned: ` 310.91 Lacs

Bank Loan: ` 350.00 Lacs (PNB)

Investment till date: ` 492.63 Lacs

Recommended for 1st & 2nd Installment–

` 93.27 Lacs

Page 9: Bihar   major industries in recent period

Vaishali Enterprises and Cold Storage P. Ltd

Project Type: RABC

Location: Industrial Growth Centre, Giddha, Ara

Project Cost: ` 1136.70 Lacs

Grant Sanctioned: ` 344.44 Lacs

Bank Loan: ` 610.00 Lacs Bank of India,

Patna MID Corporate Branch.

Investment till date: ` 606.87Lacs

Recommended for 1st & 2nd Installment– ` 103.32Lacs

Page 10: Bihar   major industries in recent period

Anuj Dairy P. Ltd

Project Type: Milk Processing Unit

Location: Industrial Area, Hazipur

Project Cost: ` 1320.34 Lacs

Grant Sanctioned: ` 383.04 Lacs

Bank Loan: ` 70.00 Lacs (SBI, Patna )

Investment till date: ` 287.75 Lacs .

Recommended for 1st & 2nd Installment– ` 114.90 .

Page 11: Bihar   major industries in recent period

Maa Mundeshwari Agro Mill s Private limited Project Type: Modern Rice Mill

Location: Industrial Growth Centre,

Aurangabad

Project Cost: ` 638.10 Lacs

Grant Sanctioned: ` 171.44Lacs

Bank Loan: ` 233.63Lacs (Central Bank Of India)

Investment till date: ` 418.49Lacs

Recommended for 1st & 2nd Installments–

` 51.42 Lacs

Page 12: Bihar   major industries in recent period

Narmadeshwar Rice Mills private limited

. Project Type: Modern Rice Mill

Location: Industrial ,Growth Centre,

Aurangabad

Project Cost: ` 1065.21 Lacs

Grant Sanctioned: ` 316.96 Lacs

Bank Loan: ` 392.00lacs (SBI, Ranchi)

Investment till date: ` 151.38 Lacs

Recommended for 1st & 2nd Installments– ` 95.07Lacs

Page 13: Bihar   major industries in recent period

Anmol Feeds Pvt. Ltd.

Project Type: Poultry Feed Unit

Location: Bela, Industrial Area,

Muzaffarpur

Project Cost: ` 337.54Lacs

Grant Sanctioned: ` 67.12Lacs

Investment till date: `201.98Lacs

Recommended for 1st & 2nd Installments– `20.13lacs (to be

transferred to the company’s A/c)

Page 14: Bihar   major industries in recent period

Vina Paras Modern Rice Mill Private limited

Project Type: Modern Rice Mill

Location: Kaimur

Project Cost: ` 1272.94Lacs

Grant Sanctioned: ` 367.52Lacs

Bank Loan: ` 500.00Lacs (SBI,SME Branch)

Investment till date: ` 321.10Lacs

Recommended for 1st & 2nd Installments– ` 110.25 Lacs

Page 15: Bihar   major industries in recent period

Shirdi Foods Private limited

.

Project Type: Candy Sugar

Location: Bela Industrial Area,

Muzaffarpur

Project Cost: ` 148.17Lacs

Grant Sanctioned: ` 42.12 Lacs

Bank Loan: ` 69.00 lacs

(Bank of India ,Muzaffarpur)

Investment till date: ` 112.49 Lacs

Recommended for 1st & 2nd Installments– ` 12.63Lacs to be

transferred to the Bank loan A/C

Page 16: Bihar   major industries in recent period

Ishwar Raj Beverages Pvt. Ltd.

Project Type: Beverage Unit

Location: Jethuli ,Fatuah

Project Cost: ` 1075.35Lacs

Grant Sanctioned: ` 320.96Lacs

Bank Loan: ` 756.00 Lacs (Allahabad Bank)

Investment till date: ` 933.45Lacs

Recommended for 1st & 2nd Installments–

` 96.27Lacs

Page 17: Bihar   major industries in recent period

Bhojpur Rice Mill Pvt. Ltd.

Project Type: Rice Mill

Location: Jagdishpur Bhojpur

Project Cost: ` 193.26Lacs

Grant Sanctioned: ` 48.45Lacs

Investment till date: ` 158.40Lacs

Recommended for 1st & 2nd Installments–

` 14.52Lacs

Page 18: Bihar   major industries in recent period

Maa Bhagwati KalyanpurCold Stores Pvt.

Ltd.

Project Type: RABC

Location: Kalyanpur , Samastipur

Project Cost: ` 778.75Lacs

Grant Sanctioned: ` 233.94 Lacs

Bank Loan: `362.00 lacs (with Kshetriya graminbank, Samastipur.)

Investment till date: ` 296.85 Lacs

Recommended for 1st & 2nd Installments– ` 70.17Lacs

Page 19: Bihar   major industries in recent period

Amit Solvex Project Type: Edible oil unit

Location: Kaimur

Project Cost: ` 1051.71Lacs

Grant Sanctioned: ` 296.2Lacs

Bank Loan: `250.00 lacs (Allahabad Bank)

Investment till date: ` 778.94Lacs

Site Inspection done on 20/08/2011

Status report submitted on 23/09/2011

Now, the complete inspection report is submitted

Recommended for 1st & 2nd Installments– ` 88.86Lacs with condition to

approval from all the members of Site Inspection team.

Page 20: Bihar   major industries in recent period

Kritika Rice Mill Pvt. Ltd.

Project Type: Rice Mill

Location: Basudeopur Chowk,

Samastipur

Project Cost: ` 733.66Lacs

Grant Sanctioned: ` 197.55Lacs

Bank Loan: ` 385lacs(Allahabad

Bank ,Samastipur)

Investment till date: ` 470.75

Recommended for 1st & 2nd Installments– ` 59.25Lacs subject to

increase in Required paid up capital.

Page 21: Bihar   major industries in recent period

Projects – 2nd installment of Grant Release

Siddhi Refoils & Industries Pvt.Ltd.

Protech Feed Pvt.Ltd

Page 22: Bihar   major industries in recent period

Protech Feed Pvt .Ltd.

Project Type: Poultry Feed Unit

Location: EPIP,Hazipur

Project Cost: ` 1284.75 Lacs

Grant Sanctioned: ` 345.01Lacs

Bank Loan: ` 635.00Lacs (SBI,SME branch Patna)

Investment till date: ` 295.93Lacs

Recommended for 2nd Installments– ` 79.00Lacs

Page 23: Bihar   major industries in recent period

Siddhi Refoils & Industries Pvt .Ltd.

Project Type: Edible Oil Unit

Location: Lalganj,Vaishali

Project Cost: ` 7071.95 Lacs

Grant Sanctioned: ` 500.00Lacs

Bank Loan: ` 3100Lacs (SBI , Kolkata)

Investment till date: ` 2056.00Lacs

Recommended for 2nd Installments ` 100.00 Lacs with a condition

that the company increases its paid up capital to `3.5cr which is 10% of

the total project equity (Requirement for release of 1st installment ).

If this doesn’t happens within 6month of the release of the 1st

installment then the company to return back ` 50lacs.

Page 24: Bihar   major industries in recent period

Projects – 3rd installment of Grant Release

Jhunjhunwala Oil Mills Limited

Shobhnath Rice Mill Pvt. Ltd

Krrish Rice Mills Pvt Limited

Page 25: Bihar   major industries in recent period

Shobhnath Rice Mills Pvt .Ltd.

Project Type: Rice Mill Unit

Location: Kaimur

Project Cost: ` 158.23Lacs

Grant Sanctioned: ` 37.84 Lacs

Bank Loan: ` 88.38Lacs (PNB , Kaimur)

Investment till date: ` 151.23Lacs

Recommended for 3rd Installments– ` 15.12Lacs

Page 26: Bihar   major industries in recent period

Jhunjhunwala Oil Mills .Ltd.

Project Type: Modern Rice Mill

Location: Kudra, Kaimur

Project Cost: ` 1899.15 Lacs

Grant Sanctioned: ` 500.00 Lacs

Investment till date: ` 1504.06Lacs

Recommended for 3rd Installments– ` 200.00Lacs to be transferred

to banl loan A/c

Page 27: Bihar   major industries in recent period

Krrish Rice Mills Pvt .Ltd.

Project Type: Modern Rice Mill

Location: Industrial Area , Fatuah

Project Cost: ` 1031.64 Lacs

Grant Sanctioned: ` 312.85 Lacs

Bank Loan: ` 470.00 Lacs (SBI , Commercial Branch,Patna)

Investment till date: ` 982.72Lacs

Recommended for 3rd Installments– ` 125.12 Lacs

Page 28: Bihar   major industries in recent period

Projects – 4th installment of Grant Release

Tarouna Cold Storage Pvt. Ltd

Page 29: Bihar   major industries in recent period

Tarouna Cold Storage Pvt .Ltd.

Project Type: RABC

Location: Jalalgarh, Purnea

Project Cost: ` 947.58 Lacs

Grant Sanctioned: ` 281.38 Lacs

Bank Loan: ` 608.57Lacs(UBI , Purnea)

Investment till date: ` 1012.07Lacs

Recommended for 4th Installments– ` 83.12Lacs

Page 30: Bihar   major industries in recent period

Projects with deviations

PROJECTS CHANGES

Siddhasaram Rice Mill clusters Layout & Plant and Machinery

Jhunjhunwala oil Mills Limited Plant & Machinery

Lumbini Beverages Pvt.Ltd New Unit to Expansion

Maa Saraswati Rice Mills Pvt. Ltd Layout, Plant & Machinery, Civil and project Cost.

Page 31: Bihar   major industries in recent period

Particulars

As per

approved

DPR

covered

under 35%

grant

covered

under 40%

grant

Covered

under

Captive

power

subsidy

Rs. in lacs

Land* 170.3 38.74 147.83 24.49

Buildings* 1653.22 345.99 1123.24 771.17

Equipments and other Utilities* 1465.13 525.33 281.03 1310.83

Preliminary & pre operative expenses 202.72 202.72

Contingencies 155.92 155.92

Margin money for WC 124.91 124.91

1393.61 1552.11 2106.50

Total 3772.2 5052.21

Amount for capital grant calculation* 3288.65 910.06 1552.11 2106.50

Eligible Subsidy 40% 35% 40% 50%

Grant calculated (Rs. in lacs) 945.64 318.52 620.84 1053.25

Revised Total grant (Rs. in lacs) 939.36

SIDDHASARAM RICE MILL CLUSTER: PROJECT COST

Page 32: Bihar   major industries in recent period

Particulars As approved in DPR Present Structure Change

Equity 854.37 1493.60 +639.23

Grant-GoB 945.63 939.36 -6.27

GrantGoB-Power 462.28 1053.25 +590.97

Debt 1509.91 1566.00 +56.09

Total 3772.19 5052.21 1280.02

SIDDHASARAM RICE MILL CLUSTER :MEANS OF FINANCE

Page 33: Bihar   major industries in recent period

MAA SARASWATI RICE MILLS PVT.LTD

Particulars As per approved DPR (`in lacs)

Proposed Change (`in lacs)

Land 32.8 10.1

Building 44.00 70.25

Equipments & other utilities

1.Rice Mill 40.43 40.43

2.MCC Panel 3.00 2.94

3.Electrical fittings & accessories

0 5.31

4.Compressor 0 5.89

5.Colour sorter 0 22.44

6.DG.Set 250 Kva 0 13.05

Total 120.23 170.41

Page 34: Bihar   major industries in recent period

Recommendation:

The capital investment has increased from `120.23 lacs to `170.41 lacs

As compared to the PAMC approved project there is an increase in GoB

grant from `41.00 lacs to `55.07 lacs.

Hence, increased grant amount will be released only after the

Changed component are observed & duly verified in joint site inspection

For the time being grant will released as per DPR approved earlier by PAMC.

Page 35: Bihar   major industries in recent period

1. No-Lien account and term loan account should be in the

same bank.

2. Bank as Designated Vendor: Promoters should have the

option of utilizing the grant amount directly to dilute the debt

availed from the banks.

3.Fund Flow to Promoter’s Account: e.g.-BIL, & Anmol Feeds

4.Grant release on hold -4 projects

Page 36: Bihar   major industries in recent period
Page 37: Bihar   major industries in recent period

Projects – Grant Release on hold

Green Earth Fertilizer Pvt. Ltd B.K Industries Ltd

Manju Makhana Enterprises Pvt. Ltd

Page 38: Bihar   major industries in recent period

Green Earth Fertilizer Pvt. Ltd.

Project Type: Rice Mill

Location: Sitamarhi, Industrial Area

Project Cost: ` 240.35Lacs

Grant Sanctioned: ` 55.04Lacs

Status: 1)No progress at the site

2)Inadequate Paid Up Capital

Status Report submitted

Page 39: Bihar   major industries in recent period

B.K Industries Ltd.

Project Type: RABC

Location: Ilmashnagar, Samastipur

Project Cost: ` 2363.47Lacs

Grant Sanctioned: ` 500.00Lacs

Status: 1)Documents pending from promoter

2)Inadequate Paid Up Capital

Status Report submitted

Page 40: Bihar   major industries in recent period

Manju Makhana Enterprise Pvt. Ltd.

Project Type: Makhana Processing

Unit

Location: Madhubani

Project Cost: ` Lacs

Grant Sanctioned: ` Lacs

Status: 1)No progress at the site

2)Inadequate Paid Up Capital

Status Report submitted

Page 41: Bihar   major industries in recent period