30
August 2010 Company Presentation AVR: TSX-V AVGCF: OTCQX New Gold Producer In Elephant Country

Avion Presentation Aug 2010

Embed Size (px)

Citation preview

Page 1: Avion Presentation Aug 2010

August 2010

Company

PresentationAVR: TSX-V

AVGCF: OTCQX

New Gold Producer In Elephant Country

Page 2: Avion Presentation Aug 2010

Forward-Looking Statement

This press release contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but arenot limited to, statements with respect to the development potential and timetable of the Mali projects; the Company’s ability to raiseadditional funds as necessary; the future price of gold; the estimation of mineral resources; conclusions of economic evaluation (includingscoping studies); the realization of mineral resource estimates; the timing and amount of estimated future production, development andexploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues;currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking statements canbe identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”,“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases orstatements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Estimatesregarding the anticipated timing, amount and cost of mining at the Mali projects are based on assumptions underlying mineral resourceestimates and the realization of such estimates; results of previous mining activities at the projects, and detailed research and analysiscompleted by independent of the Company; research and estimates regarding the timing of delivery for long-lead items; knowledgeregarding the factors consultants and management involved in building a mine and other factors that will be described in the technicalreport summarizing the scoping study that will be filed under the profile of the Company on SEDAR. Capital and operating cost estimatesare based on results of previous mining activities, research of the Company and independent consultants, recent estimates of constructionand mining costs and other factors that are set out in the scoping study. Production estimates are based on mine plans and productionschedules, which have been developed by the Company’s personnel and independent consultants. Forward-looking statements are subject

2

schedules, which have been developed by the Company’s personnel and independent consultants. Forward-looking statements are subjectto known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance orachievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including butnot limited to risks related to: timing and availability of external financing on acceptable terms; unexpected events and delays duringconstruction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of government approvals; actualresults of exploration and mining activities; changes in project parameters as plans continue to be refined; future prices of gold; failure ofplant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Althoughmanagement of the Company has attempted to identify important factors that could cause actual results to differ materially from thosecontained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially fromthose anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Companydoes not undertake to update any forward-looking statements except in accordance with applicable securities laws.

Investors are advised that National Instrument NI 43-101 of the Canadian Securities Administrators requires that each category of mineralreserves and mineral resources be reported separately. Mineral resources that are not mineral reserves do not have demonstratedeconomic viability.

Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred ResourcesThe information presented uses the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advisedthat while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission doesnot recognize these terms. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and as to their economicand legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United Statesinvestors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineralreserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or iseconomically or legally mineable.

Page 3: Avion Presentation Aug 2010

A Great Time To Buy Gold Shares….

1200

1400

1600

1800

2000

2 Gold Bull Markets – 2001 to present and 1968 to 1980

Relative Performance (Monthly) 1968-1980

USD

3

0

200

400

600

800

1000

2001 to present

Delivering gold into a bull market

Page 4: Avion Presentation Aug 2010

Why Avion fills the Bill

�Increasing Resource Base and potential for much more.

�Delivering production expansion in Gold Bull Market

4

Bull Market

�Focused on West Africa one of the fastest gold production and exploration areas

�Highly Skilled Management team and Board

Page 5: Avion Presentation Aug 2010

Avion Properties – West Africa Focus

5

Page 6: Avion Presentation Aug 2010

In a Good Neighbourhood

Mali: Africa’s Third Largest Gold Producer

6

Page 7: Avion Presentation Aug 2010

Strong Assets

April 2010 Resource Base

Updated – Mineral Resources*

Tonnes Grade (g/t Au)

Gold Ounces

Measured & Indicated (1 to 2 g/t Au Cut-off)

14,420,000 3.62 1,680,000

7

Inferred (1 to 2 g/t Au Cut-off) 15,140,000 3.23 1,570,000

• The resource study was prepared by Milko Rivera, P.Eng., and Farshid Ghazanfari, GIT, with a third party review and initial open pit versusunderground mining reviews carried out by Eugene Puritch, P.Eng., of P&E Mining Consultants Inc. Note that open pit mineral resourceswere calculated at a cut-off of 1.0 g/t Au and underground mineral resources were calculated using a 2.0 g/t cut-off.

• Resource updated to include estimated mining drawdown, Great Quest Acquisition and recent Kofi Acquisition

Page 8: Avion Presentation Aug 2010

Increasing Resource Base

2

2.5

3

3.5

Production Start

Millio

n o

un

ce

s

8

0

0.5

1

1.5

M&I

Inferred

Total Res

Millio

n o

un

ce

s

Page 9: Avion Presentation Aug 2010

Delivering Production Expansion into Gold’s Bull Market

�51,000 ounces in 2009

�75,000-85,000 ounces in 2010

9

�Plan to ramp up to a 200,000 ounce run-rate in 2012

�Three major exploration packages

Page 10: Avion Presentation Aug 2010

A Great Start Up –51,000 oz. Produced In 2009

3004005006007008009001000

10000

15000

20000

25000

Oz. Produced

10

Estimated 2010 Production of 75,000 – 85,000 oz. Au

0100200300

0

5000Cost/Oz.

Page 11: Avion Presentation Aug 2010

Avion Production To Date

2009 Total (1)(2)(3)(4)

Ore Milled (000 t) 562.8

Head Grade (g/t Au) 2.95

Recovery (%) 95.4

Gold Production (oz) 51,291

(1) Mill was restarted on February 17, 2009. Gold production includes 747 oz recovered from plant clean-up work in 2009 prior to the mill

2009

11

(1) Mill was restarted on February 17, 2009. Gold production includes 747 oz recovered from plant clean-up work in 2009 prior to the mill

restart.

(2) Commercial production was declared May 1, 2009.

(3) Includes 2 weeks downtime due to heavy rainfall and road transportation issues.

(4) 2009 Total adjusted by -483 oz to reconcile to refined ounces.

Q1 Q2 2010 To

Date

Ore Milled (000 t) 156.1 183.1 339.2

Head Grade (g/t Au) 3.26 3.95 3.63

Recovery (%) 96.5 95.8 96.1

Gold Production (oz) 15,710 22,222 37,932

2010

Page 12: Avion Presentation Aug 2010

Production Growth – needs update

Production (000 Au oz) Cash Cost (US$)

Au Production and Cash Costs

$500

$550

$600

$650

120

140

160

180

200

Cash Costs

12

Mine plan presented in the scoping study prepared by M. Rivera, P. Eng, (independent) with the support of T, Mann, P.Eng. (independent) andAndrew Bradfield, P.Eng. (COO). Resource estimate prepared by Eugene Puritch and Antoine Yassa of P&E Mining Consultants. Using CanaccordAdams Research’s gold price forecast of US$900/oz in 2009, US$850/oz in 2010, US$800/oz in 2011 and US$750/oz in 2012, open pit andunderground recoveries of 90% and 85%, respectively, UG equipment will be leased, UG mining by mechanized long hole retreat

$300

$350

$400

$450

$500

0

20

40

60

80

100

120

2009 2010 2011 2012

Au Production

Segala (OP) Segala/Taba(UG)

Tabakoto etc.(OP)

Page 13: Avion Presentation Aug 2010

200,000 oz/year Run-Rate in 2012

Anticipated project milestones

2010 2011 2012

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

60,000 metre exploration program • • • •

Future exploration programs • • • • •

Update plant expansion study •

Gravity gold vs leach study •

13

Order plant long lead time equipment •

Tabakoto underground development • • • • • •

Update mineral resource statement •

Issue NI43-101 report with mine plan •

Mine other open pits • • • • • •

Segala underground development • • • • •

Plant expansion construction • • • • •

200,000 oz/year gold production �

Page 14: Avion Presentation Aug 2010

�How much is an ounce of gold?

Value Proposition

�US $1186.50 (Aug 3, 2010)

14

�How much Did We Pay?

�US $7 Per Ounce

Page 15: Avion Presentation Aug 2010

Strong Balance Sheet

15

Debt

Page 16: Avion Presentation Aug 2010

A Substantial Resource – and Growing

RESOURCES (NI 43-101 compliant)

Goldounces (million)

TABAKOTO PROJECT

16

(million)

Measured & Indicated*

1.4

Inferred** 1.2

*Average Grade of Approximately 3.9 g/t** Includes ounces from Great Quest

Page 17: Avion Presentation Aug 2010

Low Cost Ounces in the Ground = LEVERAGE

�What Does the Market Pay?

�US $200 Per Total Resource Ounce

�What is Market Paying Avion?

17

�What is Market Paying Avion?

�US $87 Per Ounce

�More Ounces to Come!�Organic Growth – recent drilling�Great Quest (324,000 oz.)�Hounde Acquisition �Kofi Acquisition (670,000 oz)

Page 18: Avion Presentation Aug 2010

Avion Gold Corporation’s Capital Structure

Exchange TSX Venture

Ticker AVR

Shares Outstanding – basic

Fully diluted

356 million

420 million

18

Fully diluted 420 million

52-Week High/Low $0.83- $0.27

Recent Price (Aug 6, 2010) $0.48

Market Capitalization ~170.8 million

*Current Cash position of ~$38 Million

Page 19: Avion Presentation Aug 2010

Strong Assets

Large, Target-Rich Property with Central Milling Complex

Approx. 132 km2

Mill – 2100 tpd

Roads

Segala Deposit

8.51 g/t Au/10.5m

2.28 g/t Au/45.0m

2.72 g/t Au/73.5m

15.27 g/t Au/3.7m

13.56 g/t Au/22.5m

19

Tailings pond

Power

Water

3 km

Tabakoto Mine

Dioulafoundou

Fougala

7.41 g/t Au/11.5m11.6 g/t Au/13.8m

67.08 g/t Au/4.0mDar Salam

15.56 g/t Au/24.0m

10.96 g/t Au/6.0m 21.77 g/t Au/21.0m

7.53 g/t Au/20.0 m

Kenieba Property

Page 20: Avion Presentation Aug 2010

Strong Assets

$US100M Assets Acquired for <$0.20 on the Dollar (2008)

Camp now Houses 150 staff

Milling Facility – 2,100 tpd

Fuel Supply – Contracted

Power Supply

20

Current Segala Pit

Page 21: Avion Presentation Aug 2010

Current Segala Main Pit Mining

Avion is Mali’s 4th Largest Gold Company

21

Segala Mine Plan

Page 22: Avion Presentation Aug 2010

Resource Expansion Potential

Four Target Concepts

Approx. 132 km2

1 1

2 2

3 3

Segala at depth – underground potential

Tabakoto at depth, and around pit

Remainder of property4 4

22

3 km

1 1

22

3 3 Remainder of property– numerous targets

3 3

3 3

4 4 New Properties

4 4

4 4

Page 23: Avion Presentation Aug 2010

Target-Rich Exploration Package (~500 km2)

� 75% of drill holes have

10 km

23

� 75% of drill holes have intersected gold!

� $10 Million Exploration Budget for 2010

� Total Project (Avion + Great Quest+Kofi) Resource 3.65 M ozs*

* At 0.5 g/t cut-off

Page 24: Avion Presentation Aug 2010

Hounde – Burkina Faso

24

Page 25: Avion Presentation Aug 2010

Comparable Trading Multiples

P / CFPS

Avion is significantly undervalued relative to its peer group based on cash flow and P/NAV multiples

9.1x

9.9x

1.4x

P / NAV1

1. NAVPS uses 5% discount rate and long-term metal prices of US$850/oz Au and US$15.50/oz AgNote: Producer Peers include Alamos Gold, Aura Minerals, Centamin Egypt, Gammon Gold, Gold Wheaton, Golden Star Resources, New Gold, Northgate Minerals and Red

Back MiningSource: Canaccord Adams Research and public market research (updated March 11, 2010)

3.2x

2.1x

2010 2011

Avion Producer Peers

0.9x

P/NAV

Avion Producer Peers

Page 26: Avion Presentation Aug 2010

Low valuation compared to peers

Average

ANVSGR NXG GSSSMF

NGDEGU

AGI

GAM

$1,000

$1,250

$1,500

$1,750

$2,000

Market Capitalization (US$mm)

Avion Gold

BTO

ANVSGR NXG GSS

MFL

SMF

KGI

ARZ

$-

$250

$500

$750

$1,000

0 100 200 300 400 500 600

2010E Production (000's oz Au)

Market Capitalization (

Page 27: Avion Presentation Aug 2010

AVION GOLD CORPORATION

MAJOR SHAREHOLDERS

� Sprott Asset Management

� Pinetree Capital

27

� Maple Leaf Partners

� Front Street

� Aberdeen International

� Management/Insiders

Page 28: Avion Presentation Aug 2010

Analyst Coverage

Firm Analyst

Wellington West Paolo Lostritto

28

Wellington West Paolo Lostritto

Canaccord Capital Markets Eric Zaunscherb

Page 29: Avion Presentation Aug 2010

Experienced Management Team & Board

MANAGEMENT

John Begeman, President, CEO and Director

Don Dudek, Senior VP Exploration and Director

Greg Duras, CFO

Andrew Bradfield, Chief Operating Officer

29

BOARD OF DIRECTORS

Stan Bharti – Executive Chairman

John Begeman

Bruce Humphrey

Lewis Mackenzie, Major General (Ret.)

Don Dudek

Honorable Pierre Pettigrew

George Faught

Page 30: Avion Presentation Aug 2010

AVION GOLD CORPORATION

30

Contacts: Address:

Don Dudek 65 Queen Street West #800Vice President, Exploration PO Box 67Tel: (416) 861-2261 Toronto, ON M5H [email protected]

www.aviongoldcorp.comMichael McAllisterManager, Investor RelationsTel: (416) [email protected]