Coon Creek Watershed District Board Meeting November 28, 2011

Obstr hearing only

Embed Size (px)

Citation preview

Page 1: Obstr hearing only

Coon Creek Watershed District

Board MeetingNovember 28, 2011

Page 2: Obstr hearing only

5. Hearing on the Obstruction of County Ditch 58-6 1. Convene Hearing2. Background & Presentation

4. Public Comment

6. Consider Findings7. Adjourn Hearing8. Consider and Adopt Resolution and Order

Page 3: Obstr hearing only

Purpose of hearing

To determine whether the Board of Managers should order the removal of an obstruction in Anoka County Public Ditch 58-6.

Held pursuant to Minnesota Statutes section 103E.075

Page 4: Obstr hearing only

In 1917Ditch 58 and 58-6 established

Page 5: Obstr hearing only

1964-1970 Crossing installed

1964 1970

Page 6: Obstr hearing only

Parcels in Drainage Area

313 acres

88 parcels draining to crossing

4738 feet of public ditch upstream of crossing

Page 7: Obstr hearing only

Affected Parcels

Carl “Dave” Turner and Sharon Turner17111 Polk Street NE

Deborah “Page” Heig17305 Polk Street NE

Dusty Esler17042 Polk Street NE

Page 8: Obstr hearing only
Page 9: Obstr hearing only

1991Mutual maintenance agreementMutual easement and maintenance agreement for

ingress and egress over Polk Street between:Eslers (parcel B)Turners (parcel D) Ashes (Heig) (parcel E)

signed and dated August 24th, 1991.

Page 10: Obstr hearing only

2011 Flooding

Looking downstream Looking upstream

5/23/2011

Page 11: Obstr hearing only

2011 Inspection

5/31/2011

Looking downstream Looking upstream

Page 12: Obstr hearing only

2011 Inspection

9/20/2011

Looking downstream Looking upstream

Page 13: Obstr hearing only

2011 Inspection

Looking downstream Looking upstream

10/17/2011

Page 14: Obstr hearing only

2011 Inspection

Looking downstream Looking upstream

11/1/2011

Page 15: Obstr hearing only

2011 Flooding

Erosion on driveway Flooding over driveway

5/23/2011

Page 16: Obstr hearing only

Safety and Flooding Concerns

Emergency access

Flood damage

Additional costs

Page 17: Obstr hearing only

Culvert

YesNoFlared End

0.06%Slope

896.8900.8Elevation

CMP or HDPECMPMaterial

40 feet longLength

42”24”Diameter

RecommendedExisting

Page 18: Obstr hearing only

SWMM Results

Page 19: Obstr hearing only

Estimated CostItem No. Item Units Quantity

Unit Cost Total

1 Mobilization LS 1 $2,000 $2,000

2 Remove and dispose 24"CMP LS 1 $300 $300

3 Furnish and install Class 5 bedding CY 12 $100 $1,200

4 Furnish and install 42"HDPE LF 24 $80 $1,920

5 F&I 42" HDPE FES LF 16 $135 $2,160

6 Driveway reconstruction Cl5 CY 60 $100 $6,000

7 Site vegetation (seed banks) LS 1 $100 $100

Total $13,680

Note:Cost estimate is based on a HDPE culvert. Other culvert materials may be used such as RCP or CMP but cost may vary.

Page 20: Obstr hearing only

Current Quotes42" CMP 42" HDPE

Ed Fields and Sons $8,700.00 $8,620.00Jordan Excavators* $12,760.00Forest Lake Contracting $13,960.60 $14,600.60G.F. Jedlicki Inc $23,911.00 $23,791.00Casper's Excavating**Sunram Construction Inc.

Note:*Quote obtained by Deborah “Page” Heig**Contacted by Carl “Dave” Turner, no quote yet receivedBlank cells indicate contractor was given a bid sheet but did not provide a quote