12163191216319FMC Seaman's Centre IMRIS FMC Seaman's Centre IMRIS
InstallInstall
Special Projects
Building BuildingsBuilding Buildingsandand
Building RelationshipsBuilding Relationships
The Ledcor TeamThe Ledcor Team
• Steve Neidermayer, Superintendant
• Karra Bridger, Project Assistant• Matt Heske, Project Coordinator• Linda Eisbrenner, Project
Accountant• Neil Elford, Project Manager
Project FactsProject Facts
• Contract Value $1,100,000• MRI (total costs) $5,400,000• Old 1.5T Magnet 16,000 lbs (7
tonne)• New 3.0T Magnet 20,000 lbs (9
tonne)
"This is truly a first, there is not another movable three tesla magnet attached to ceiling rails on the
entire planet.
This is a marvelous achievement and representsa considerable innovation for Calgary and the
Centre"
Dr. Garnette Sutherland
Preconstruction visit
Removal of the old 7 tonne MRI out of the building
Here is another way to look at 7 tonne
New MRI brought in through the McCaig Tower before the building was closed in.
Ledcor – Safety first (lead by example)especially when lifting 20 000 lbs
So HOW heavy is the new MRI(maybe this helps)
Demolition of theOperating Room
Negative Air units running
Framing for RFRail support plates shielding
Copper shielding for Radio Frequency (RF) interference
MRI ready for move to the OR
Lifting 20 000 lbs to hang from the “magnet mover”