Since 1990, the voter approved half-cent sales tax provides dedicated funding for transportation projects in San Joaquin County.
The Measure K Promise
• Completed Projects• Improved Transit
Access• Continuing Projects
2015-2016Year in Review
State Route 99
South Stockton Widening
Did you know?Caltrans and local partners have
now widened 14 miles of SR-99 from SR-4 to Austin Road.
Widened to six lanes
Overcrossings at MLK Blvd and Main St
New interchange at Golden Gate Ave
Reconstructed the Mariposa Rd interchange
New Park & Ride facility
TOTAL PROJECT COST
MEASURE K INVESTMENT
$214 M
$47.5 M
State Route 4 /
Crosstown Freeway
Extension
Did you know?These are the longest pre-cast
girders in the country (known as “super girders”) and they were built
right here in Lathrop.
Four-lane elevated roadway extends freeway from Fresno Ave to Navy Dr
Grade separation removing 6,500 vehicles a day from Boggs Tract neighborhood
Navy Dr interchange
MEASURE K INVESTMENT$70 M
TOTAL PROJECT COST$138 M
Interstate 5North
Stockton Widening &
Rehab Projects
Did you know?The I-5 North Stockton Widening and Rehab Projects added San
Joaquin County’s first High Occupancy Vehicle lanes.
Added new auxiliary lanes and soundwalls
Reconstructed existing freeway with Long lasting reinforced concrete (40-year life) between MLK and Hammer Ln
MEASURE K INVESTMENT$47 M
TOTAL PROJECT COST$194.5 M
Freeway Service Patrol
Improved TransitAccess
Escalon eTrans 3 daily round trips Local and
regional connections
986 passengers in 2015-2016
San Joaquin Regional Transit District
Intercity, interregional, and rural transit services
4.08 M passenger trips throughout the county in 2015-2016
Altamont Corridor Express Service from
Stockton, Lathrop, Manteca, Tracy to several Bay Area destinations
1.3 M passengers in 2015-2016
Ripon Blossom Express Local and
regional connections to San Joaquin RTD and Modesto Area Express
1,109 passengers in 2015-2016
Continuing Projects
Lower Sacramento Road Improvement
Harney Lane Grade Separation
Hammer Lane Widening Phase 3B
N
Thornton Road Widening
Download full report:www.sjcog.org/measureK