city of stonnington greville street precinct Public Realm Design Development October 2015 - work in progress

Greville king draft concept plans

Embed Size (px)

Citation preview

city of stonnington

greville street precinctPublic Realm Design DevelopmentOctober 2015 - work in progress

CONTENTS

Document Register:

Rev Date Distribution Reason for Issue Issued By

Stonnington Draft for initial review CR

P1 18.09.2015 Stonnington Design Development MR

Prepared for the City of Stonnington by:

rush \ wright associates

Lvl 4, 105 Queen StreetMelbourne Vic Australia 3000tel +61.3.9600 4255fax +61.3.9600 4266email [email protected]

Disclaimer:While every reasonable effort has been made to ensure that this document is correct at the time of printing. RWA has relied on considerable third party information and disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document.

8 TREES AND PLANTING Key plant species selections Stage 1 Stage 2stage 3stage 4Stgae 5 Stage 6 9 LIGHTING DESIGN Lighting inspirations 9.1 Catenary Design (Webb Report) 9.2 Site wide lighting concepts (WGE report)

10 LANDSCAPE PLANS: DESIGN DEVELOPMENT STAGE

11 SERVICES DESIGN Civil DesignElectrical design

12 TRAFFIC DESIGN

0 GREVILLE STREET PRECINCT - WHOLE OF SITE 3Overall plan Staging plan

1.0 STAGE 1: GRATTAN GARDENS Current plans and renders 2.0 STAGE 2: GREVILLE STREET SHARED ZONE Current plans and renders 3.0 STAGE 3: KING STREET CLOSURE Current plans and renders 4.0 STAGE 4: PORTER STREET SHARED ZONE Current plans and renders

5.0 STAGE 5: GREVILLE STREET IMPROVEMENTS (EAST AND WEST) Current plans and renders

6.0 STAGE 6: PRAHRAN TOWN HALL FRONTAGE Current plans and renders

7 DESIGN ELEMENTS 7.1 City of Stonnington - Standard urban design palette 7.2 Ground Plane paving pattern design opportunities metal highlights7.3 Walls and edges 7.4 Furniture 7.5 Planters 7.6 Bicycle racks/ Bollard elements 7.7 Public Art Opportunities

2 City of Stonnington Greville Street PrecinctPublic Realm Design Design Development Report, October 2015. Revision [P2].

3

greville street precinct : whole of site 0

4Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT OVERALL PLAN

GREVILLE STREET PRECINCT : WHOLE OF SITE

5Prepared for the City of Stonningtonby rush\wright associates

STAGING PLAN

GREVILLE STREET PRECINCT : WHOLE OF SITE

STAGE 5

STAGE 3 KING STREET CLOSURE

STAGE 5B GREVILLE ST EAST IMPROVEMENTS

STAGE 1 GRATTAN GARDENS STAGE 5A

GREVILLE ST WEST IMPROVEMENTS

STAGE 2 GREVILLE ST SHARED ZONE AND IZETT STREET INTERSECTION

STAGE 4 PORTER STREET SHARED ZONE + COMMERCIAL ROAD SIGNALS PLUS TEMPORARY GREVILLE ST WEST ONE WAY INFRASTRUCTURE

STAGE 6 PRAHRAN TOWN HALL FORECOURT

6Prepared for the City of Stonningtonby rush\wright associates

7

stage 1: grattan gardens 1

8Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT CANOPY PLAN

STAGE 1: GRATTAN GARDENS STAGE 1: GRATTAN GARDENS

GREVILLE STREET

GRA

TTAN

STR

EET

GREVILLE STREET

GREVILLE STREETSHARED ZONE

GREVILLE STREETFOOTPATH ANDTRADING ZONE

GRATTAN GARDENSFORECOURT

GRATTAN GARDENSGRASSED TERRACE

RESIDENTIAL LANEWAY

9Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT PLAN - GROUNDPLANE

STAGE 1: GRATTAN GARDENS

GREVILLE STREET

GRA

TTAN

STR

EET

GREVILLE STREET

GREVILLE STREETSHARED ZONE

GREVILLE STREETFOOTPATH ANDTRADING ZONE

GRATTAN GARDENSFORECOURT

GRATTAN GARDENSGRASSED TERRACE

RESIDENTIAL LANEWAY

10Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT RENDER

STAGE 1: GRATTAN GARDENS STAGE 1: GRATTAN GARDENS

GRATTAN STREET

GREVILLE STREET

STAGE 1: GRATTAN GARDENS 11Prepared for the City of Stonnington

by rush\wright associates

12Prepared for the City of Stonningtonby rush\wright associates

STAGE 1: GRATTAN GARDENS

13Prepared for the City of Stonningtonby rush\wright associates

STAGE 1: GRATTAN GARDENS

14Prepared for the City of Stonningtonby rush\wright associates

STAGE 1: GRATTAN GARDENS GLAZED BRICK WALLWITH BULLNOSE PROFILE

STAINLESS STEEL TREE SURROUNDGRATTAN GARDENS FORECOURT GRANITE SETTS IN 3 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN

EXISTING WATER FEATUREWITH STAINLESS STEEL GRATESTO BE RETAINED

15Prepared for the City of Stonningtonby rush\wright associates

STAGE 1: GRATTAN GARDENS CONCRETE PLANTER SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)

EXISTING WATER FEATUREWITH STAINLESS STEEL GRATESTO BE RETAINED

GRATTAN GARDENS FORECOURT GRANITE SETTS IN 3 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN

GLAZED BRICK WALLWITH BULLNOSE PROFILE

CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE

16Prepared for the City of Stonningtonby rush\wright associates

STAGE 1: GRATTAN GARDENS GRASSED TERRACE & BOARDWALKINCLINED EVENT LAWN

GRANITE STEPS WITHSTAINLESS STEEL HANDRAILS AND FEATURE LIGHTINGTO GRATTAN GARDENS FORECOURT

CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE

SEQUINED CATENARY WITH LED STUDDED MESH BORDERAT 9-METRE HEIGHT

BOTANICAL CATENARYWITH FLORAL HOUSING TO FEATURE LIGHTSAT 12-METRE HEIGHT

17Prepared for the City of Stonningtonby rush\wright associates

STAGE 1: GRATTAN GARDENS

NEW STREET TREE

WAYFINDING AND INFORMATION BEACON

EXISTING PERIMETER WALLS TO BE RETAINEDCLEAN DOWN AND REPAINT

CONCRETE BOLLARDCLAD IN TEXTUREDSTAINLESS STEEL

INTEGRATION WORKS:ASPHALT RAMP WITH RUBBER KERBS AND LINE MARKINGS

CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE

18Prepared for the City of Stonningtonby rush\wright associates

19

stage 2: greville street shared zone 2

20Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: GREVILLE STREET SHARED ZONE

DESIGN DEVELOPMENT CANOPY PLANDESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

INSERT UPDATED AERIAL RENDER

21Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: GREVILLE STREET SHARED ZONE

22Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: GREVILLE STREET SHARED ZONE WSUD TREE PITWITH FLUSH KERB FOR OVERLAND FLOWAND INTERMITTENT RAISED KERB AS WHEEL STOP

BLUESTONE FOOTPATH AND TRADING ZONETO COUNCIL STANDARDS

PROPOSED STREET TREEIN FLUSH KERB OUTSTAND WITHINTERMITTENT RAISED KERB AS WHEEL STOP

CONCRETE PLANTER SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)

GREVILLE STREET SHARED ZONEGRANITE SETTS IN 3 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN

23Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: GREVILLE STREET SHARED ZONE CONCRETE PLANTER SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)

CONCRETE SEATCLAD IN PAINTED STEELOR PAINTED GLASS REINFORCED CONCRETE (GRC)

STAINLESS STEEL BIKE RACKSTAINLESS STEEL TREE SURROUNDWITH GRANITE PAVING BAND

CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE

INSERT UPDATED RENDER FROM IZETT STREET

24Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: GREVILLE STREET SHARED ZONE

25

stage 3: king street closure 3

26Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: KING STREET CLOSURE

DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

INSERT UPDATED AERIAL RENDER

27Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: KING STREET CLOSURE

INSERT UPDATED RENDER TOWARDS PRAHRAN TOWN HALL

28Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: KING STREET CLOSURE

INSERT UPDATED NIGHTTIME RENDER

29Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: KING STREET CLOSURE

30Prepared for the City of Stonningtonby rush\wright associates

31

stage 4: porter street shared zone 4

32Prepared for the City of Stonningtonby rush\wright associates

STAGE 4: PORTER STREET SHARED ZONE

DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

INSERT UPDATED AERIAL RENDER

33Prepared for the City of Stonningtonby rush\wright associates

STAGE 4: PORTER STREET SHARED ZONE

INSERT UPDATED RENDER TOWARDS PORTER STREET SOUTH

34Prepared for the City of Stonningtonby rush\wright associates

STAGE 4: PORTER STREET SHARED ZONE

35

stage 5: greville stret improvements (east and west )5

36Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT CANOPY PLAN

STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS

HARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

INSERT UPDATED AERIAL RENDER

37Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT CANOPY PLAN

STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS

38Prepared for the City of Stonningtonby rush\wright associates

STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS

DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

39Prepared for the City of Stonningtonby rush\wright associates

STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS

DESIGN DEVELOPMENT CANOPY PLANHARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

INSERT UPDATED AERIAL RENDER

40Prepared for the City of Stonningtonby rush\wright associates

STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS

INSERT UPDATED RENDER TOWARDS LIBRARY FORECOURT

41Prepared for the City of Stonningtonby rush\wright associates

STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS

42Prepared for the City of Stonningtonby rush\wright associates

43

stage 6: prahran town hall forecourt 6

44Prepared for the City of Stonningtonby rush\wright associates

DESIGN DEVELOPMENT CANOPY PLAN

STAGE 6: PRAHRAN TOWN HALL FORECOURT

HARDSCAPE KEY

EXTENT OF WORKS

ASPHALT PAVING

GRANITE PAVING - SHARED ZONE

100 X 100 SETTS WITH COLOUR PATTERN

GRANITE PAVING - STEPS

BLUESTONE PAVING - FOOTPATH

CONTRASTING INTERSECTION THRESHOLD PAVING

STAINLESS STEEL TREE SURROUND

TACTILE GROUND SURFACE INDICATORS (TGSI)

W1: EXISTING WALL TO RETAIN

W2: ROUGH BASALT ROCKERY WALL

W3: GLAZED BRICK PLANTER WALL

CE2: CONCRETE EDGE - FLUSH KERB

EXISTING KERB

OVERHEAD AWNING LINE

BICYCLE RACK

BENCH SEAT

SEAT WALL: MULTICOLOUR GLAZED BRICK

RAISED PLANTER WITH SEATING

FEATURE SEAT / BUTTON BOLLARD

BOLLARD: S/S CLAD CONCRETE THIMBLE

STRIP DRAIN

PROPOSED LIGHT POLE

EXISTING POLE TO REMAIN WITH LIGHTING

EXISTING POLE TO REMAIN WITH LIGHTING REMOVED

CATENARY SUPPORT POLE

WAYFINDING & INFORMATION BEACON

EXISTING LEVEL

PROPOSED LEVEL

SOFTSCAPE KEY

EXISTING TREE TO BE RETAINED

EXISTING TREE TO BE TRANSPLANTED (PALM)

WSUD TREEPIT WITH UNDERPLANTING

LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING

ADVANCED PALM PLANTING IN TURF / GARDEN BED

EXISTING GARDEN BED TO BE REPLANTED

NEW GARDEN BED

NEW TURF BED

INSERT UPDATED AERIAL RENDER

45Prepared for the City of Stonningtonby rush\wright associates

STAGE 6: PRAHRAN TOWN HALL FORECOURT

INSERT UPDATED RENDER TOWARDS PRAHRAN TOWN HALL

46Prepared for the City of Stonningtonby rush\wright associates

STAGE 6: PRAHRAN TOWN HALL FORECOURT

47

design elements & materials7

48Prepared for the City of Stonningtonby rush\wright associates

7.1 CITY OF STONNINGTON - STANDARD URBAN DESIGN PALETTE

49Prepared for the City of Stonningtonby rush\wright associates

7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES

DESIGN ELEMENTS

• moderatelyrandomisedpattern

• patternderivedfromrockstriations

• regularisedpatternwithcontrastbands

• patternderivedfromthegeomorphologyofVictoria

• designdevelopmentrender

• gesturalwovenpattern

• blendedinterfacebetweenpaversizes

• designdevelopmentrender

50Prepared for the City of Stonningtonby rush\wright associates

DESIGN ELEMENTS

7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES

51Prepared for the City of Stonningtonby rush\wright associates

7.2 GROUND PLANE : METAL HIGHLIGHTS

DESIGN ELEMENTS• designdevelopmentrender

• tactilepattern• metalthreadswithingroundplane • existingwaterfeature

52Prepared for the City of Stonningtonby rush\wright associates

7.3 WALLS & EDGES: COLOURS & MATERIALS

DESIGN ELEMENTS• designdevelopmentrender

• funkycolourboots

• rangeoffunkycolours

• glazedbrickwalls • glazedbrickdetailcoursing

• complimentandcontrastwithheritageelements

53Prepared for the City of Stonningtonby rush\wright associates

7.4 FURNITURE MISCELLANEOUS AND STANDARD

DESIGN ELEMENTS

• stainlesssteelseatingelements

54Prepared for the City of Stonningtonby rush\wright associates

7.5 PLANTERS AND BOLLARDS

DESIGN ELEMENTS• subtlevariety• varyingshapesandtextures

• uniqueobjectswithconsistentlanguage

• definepathsandspaceswithinthesharedzone • fieldofobjects

55Prepared for the City of Stonningtonby rush\wright associates

7.5 PLANTERS AND BOLLARDS

DESIGN ELEMENTS• designdevelopmentrender

56Prepared for the City of Stonningtonby rush\wright associates

7.5 PLANTERS AND BOLLARDS

DESIGN ELEMENTS

57Prepared for the City of Stonningtonby rush\wright associates

7.6 BICYCLE RACKS/ BOLLARD ELEMENTS

DESIGN ELEMENTS• designdevelopmentrender

58Prepared for the City of Stonningtonby rush\wright associates

7.7 PRAHRAN TOWN HALL ELEMENTS

DESIGN ELEMENTS• designdevelopmentrender

• seatingwithinchapelstreetlanguage

• civicgroundplanetextartworkopportunities

• townhallfrontage

• seasonalplantingopportunities • overscaledelements

59Prepared for the City of Stonningtonby rush\wright associates

7.7 KING STREET ELEMENTS

DESIGN ELEMENTS• designdevelopmentrender

• organicpattern• lightingtoenhancepavingpatternandcastshadowsthroughscreen• verticalscreenandcatenary • withsomegreendeveloping

• screencouldprovideinterestingpatternsitself

60Prepared for the City of Stonningtonby rush\wright associates

7.8 PUBLIC ART OPPORTUNITIES

PORTER STREET

1

3

2

1

2

3

BEACON OBJECT SERIES (REFER GRATTAN GARDENS)

COLLABORATION PROJECT: NEW STEEL FENCING TO PLATFORM BOUNDARY COULD INTEGRATE CONTEMPORARY DESIGN ARTWORK (REINTERPRET TRADITIONAL RAILWAY PICKET CONSTRUCTION DETAILS.

COLLABORATION PROJECT: SHARED ZONE PAVING DESIGN AS INTEGRATION OF HISTORIC CULTURAL ELEMENTS AND IDEAS INCLUDING LIGHTING, IMAGE, TEXT, PAVING DESIGN IN GRANITE - BLUESTONE PALETTE.

61Prepared for the City of Stonningtonby rush\wright associates

7.8 PUBLIC ART OPPORTUNITIES

GRATTAN GARDENS

BEACON OBJECT SERIES: A REPEATED STREET ELEMENT (REFER OTHER PRECINCT PLAN MARKUPS) WHICH COULD INVESTIGATE HISTORY, INTERPRETATION, SOUND, LIGHT, LOCAL EVENT BULLETIN, INTERACTIVE ELEMENTS.

CATENARY LIGHTPOLES WITH PROJECTION CAPACITY FROM RIGGING (NOTE: STAGE 2 IMPLEMENTATION) IMAGE ART & SOUND INSTALLATION

PERIOD OF THREE MONTH TRAFFIC TRIAL WITH TEMPORARY FESTIVAL INSTALLATION OF LIGHTING BY ARTISTS OR STUDENTS FROM THE MELBOURNE POLYTECHNIC DIPLOMA OF ‘LIVE PRODUCTION & TECHNICAL SERVICES’ AT PRAHRAN CAMPUS

1

2

3

1

2

3

3

62Prepared for the City of Stonningtonby rush\wright associates

PRAHRAN TOWN HALL

7.8 PUBLIC ART OPPORTUNITIES

4

CHAP

EL S

TREE

T

GREVILLE STREET

2

2

13

1

2

3

4

BEACON OBJECT SERIES (REFER GRATTAN GARDENS)

COLOUR - IMAGE WALL TREATMENT WITH TEMPORARY OR PERMANENT LIGHT PROJECT SERIES

COLLABORATION PROJECT: LIBRARY AND TOWN HALL OFFICES (FUTURE CIVIC FACILITY) SPECIAL OBJECT OR PAVING INSERTIONS

PRAHRAN TOWN HALL FORECOURT: SPECIAL ARTWORK INTEGRATION FOR MARKING TOWN HALL SPACE ALONG CHAPEL STREET

63Prepared for the City of Stonningtonby rush\wright associates

KING STREET

7.8 PUBLIC ART OPPORTUNITIES

4 4 4 4 43 3 3 3

2 2

1

1

2

3

4

5

BEACON OBJECT SERIES (REFER GRATTAN GARDENS)

COLOUR - IMAGE WALL TREATMENT

SPECIAL GRANITE PAVING PATTERN SERIES

TEMPORARY OR PERMANENT LIGHT PROJECT SERIES ONTO PAVING (POTENTIAL TO BUILDING PIERS)

LIGHTING DESIGNER & ARTIST COLLABORATIONA. LIGHTING PROJECTS (REFER #4 ABOVE)B. IN GROUND LEDC. LIGHT EFFECTS ONTO BUILDING PIERSD. VERTICAL CATENARY LIGHTING DESIGN

CHAP

EL S

TREE

T

LT. C

HAPE

L ST

REET

GREVILLE STREET

KING STREET

64Prepared for the City of Stonningtonby rush\wright associates

65

trees&plantings8

66Prepared for the City of Stonningtonby rush\wright associates

PLANTING KEY PLAN

STAGE 1: TREES AND PLANTING

01 01

0202

02

03

04A 04B

04B

04B 04E 04C

05

04D

67Prepared for the City of Stonningtonby rush\wright associates

FORECOURT TREESBrachychiton populneus x acerifolius ‘Jerilderie Red’

STAGE 1: TREES AND PLANTING

68Prepared for the City of Stonningtonby rush\wright associates

PALMSWashingtonia robustaMexican Fan Palm

STAGE 1: TREES AND PLANTING

69Prepared for the City of Stonningtonby rush\wright associates

FEATURE TREES

STAGE 1: TREES AND PLANTING

04A. Ceiba sp.

04C. Cussonia spicata

04B. Chamaerops humilis

04D. Ficus platypoda 04E. Erythrina crista-galli

70Prepared for the City of Stonningtonby rush\wright associates

UNDERSTOREY

STAGE 1: TREES AND PLANTING

05F. Yucca filamentosa or Y. recurvifolia05A. Aloe plicatilis

05B. Agave americana

05D. Aloe arborescens 05E. Aloe barberae 05G. Dion spinulosum 05H. Zamia furfuracea

PLANTING KEY PLAN

71Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: TREES AND PLANTING

72Prepared for the City of Stonningtonby rush\wright associates

STREET TREESTilia cordata ‘Green Spire’Linden Tree

STAGE 2: TREES AND PLANTING

73Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: TREES AND PLANTING STAGE 2: TREES AND PLANTING

STREET TREES

74Prepared for the City of Stonningtonby rush\wright associates

STAGE 2: TREES AND PLANTING STAGE 2: TREES AND PLANTING

UNDERSTOREY

75Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: TREES AND PLANTING

76Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: TREES AND PLANTING

77Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: TREES AND PLANTING

78Prepared for the City of Stonningtonby rush\wright associates

STAGE 3: TREES AND PLANTING

79Prepared for the City of Stonningtonby rush\wright associates

STAGE 4: TREES AND PLANTING

80Prepared for the City of Stonningtonby rush\wright associates

STAGE 4: TREES AND PLANTING

81Prepared for the City of Stonningtonby rush\wright associates

STAGE 5: TREES AND PLANTING

82Prepared for the City of Stonningtonby rush\wright associates

STAGE 5: TREES AND PLANTING

83Prepared for the City of Stonningtonby rush\wright associates

STAGE 6: TREES AND PLANTING

84Prepared for the City of Stonningtonby rush\wright associates

STAGE 6: TREES AND PLANTING

85

lighting design 9

86Prepared for the City of Stonningtonby rush\wright associates

LIGHTING INSPIRATIONS: GRATTAN GARDENS CATENARY

LIGHTING DESIGN

• sequinedfield

• simplifiedbotanicallightfitting

• simplifieddirectionallightfitting • designdevelopmentrender

• glomeshfabricfield • studdedclusters

87Prepared for the City of Stonningtonby rush\wright associates

9.1 CATENARY DESIGN

EMAIL [email protected] 03 9652 0333 FACSIMILE 03 9652 0300LEVEL 9, 128 EXHIBITION STREET MELBOURNE VIC 3000 AUSTRALIAWEBB AUSTRALIA GROUP (VIC) PTY LIMITED ACN 61 073 585 305

PROJECT

DATE

DRAWING

APPROVEDREVIEWDATEREVISIONISSUE

PROJECT

CLIENT

SCALE D R A

NO IN SETREVISIONDWG NO

CONSULTING ELECTRICAL ENGINEERS TECHNOLOGY CONSULTANTSLIGHTING CONSULTANTS

APPEAR TO EXIST IN THE DOCUMENTS, IMMEDIATELY NOTIFY THE CONTRACT ADMINISTRATOR IN WRITING.WITH ALL CONTRACT DOCUMENTATION. SHOULD ANY AMBIGUITY, ERROR, OMISSION, DISCREPANCY, INCONSISTENCY OR OTHER FAULT

REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN PERMISSION OF COPYRIGHT WEBB AUSTRALIA GROUP (VIC) PTY LTD ABN 61 073 585 305, ALL RIGHTS RESERVED. THIS DRAWING MAY NOT BE

WEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTIONWEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTION

AUSTRALIA

STATUS

CITY OF STONNINGTON

GRATTAN GARDENS CATENARY LIGHTINGGREVILLE STREET, PRAHRAN VICTORIA 3181

CATENARY LIGHTINGDETAILS

19.10.15 AS SHOWN [A1] A.P. M.M. R.H.

M356A EL-02 01 -

PRELIMINARY

DETAIL 3: PERFROATED DECORATIVE MESH OPTIONS

TYPICAL WEATHERPROOF PIXEL RGB LEDSTRING MOUNTED ON CATENARY WIRE

PERFROATED DECORATIVE MESH - PATTERN OPTIONS

DETAIL 2: FLOWER FEATURE

DETAIL 2: FLOWER CATENARY CLAMP SYSTEM

BESPOKE FLOWER LUMINAIRES WITH LED LIGHT SOURCE

G R E V I L L E S T R E E T

EMAIL [email protected] 03 9652 0333 FACSIMILE 03 9652 0300LEVEL 9, 128 EXHIBITION STREET MELBOURNE VIC 3000 AUSTRALIAWEBB AUSTRALIA GROUP (VIC) PTY LIMITED ACN 61 073 585 305

PROJECT

DATE

DRAWING

APPROVEDREVIEWDATEREVISIONISSUE

PROJECT

CLIENT

SCALE D R A

NO IN SETREVISIONDWG NO

CONSULTING ELECTRICAL ENGINEERS TECHNOLOGY CONSULTANTSLIGHTING CONSULTANTS

APPEAR TO EXIST IN THE DOCUMENTS, IMMEDIATELY NOTIFY THE CONTRACT ADMINISTRATOR IN WRITING.WITH ALL CONTRACT DOCUMENTATION. SHOULD ANY AMBIGUITY, ERROR, OMISSION, DISCREPANCY, INCONSISTENCY OR OTHER FAULT

REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN PERMISSION OF COPYRIGHT WEBB AUSTRALIA GROUP (VIC) PTY LTD ABN 61 073 585 305, ALL RIGHTS RESERVED. THIS DRAWING MAY NOT BE

WEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTIONWEBB AUSTRALIA GROUP (VIC) PTY LTD. WEBB AUSTRALIA GROUP DRAWINGS ARE SCHEMATIC AND SHALL BE READ IN CONJUNCTION

AUSTRALIA

STATUS

CITY OF STONNINGTON

GRATTAN GARDENS CATENARY LIGHTINGGREVILLE STREET, PRAHRAN VICTORIA 3181

CATENARY LIGHTINGSCHEMATIC DESIGN

19.10.15 AS SHOWN [A1] A.P. M.M. R.H.

M356A EL-01 01 -

PRELIMINARY

GRATTAN GARDENS CATENARY LIGHTING - PLAN VIEW

GRATTAN GARDENS CATENARY LIGHTING - FRONT VIEW GRATTAN GARDENS CATENARY LIGHTING - SIDE VIEW

Greville Street Precinct Project

Date: 19.10.15Job Reference: 28597Type: Preliminary Lighting Concept ReportRevision: 1

SpecialistLighting

Greville Street Precinct Project

Date: 19.10.15Job Reference: 28597Type: Preliminary Lighting Concept ReportRevision: 1

SpecialistLighting

Greville Street Precinct ProjectWGE Specialist Lighting have been engaged to provide a lighting scheme for the Greville Street Precinct project.

The scheme is split up into seven different stages outlined below:

• Stage 1 - Grattan Gardens• Stage 2A - Izett Street Intersection• Stage 2B - Greville Street West• Stage 3A - Greville Street East• Stage 3B - Prahran Town Hall Forecourt• Stage 4 - King Street• Stage 5 - Porter Street

This concept report outlines the external lighting schemes for stages 1, 2A and 2B, and initial concepts for the remaining stages.

Our overarching design philosophy recognises the precinct’s bohemian character, botanical themes and the need to create a safe space with a robust installation that is beautiful and engaging for the public at all hours.

New LED street lighting will be provided to Greville Street on the south side to provide functional illumination over the street and footpaths to accommodate the transition to underground power. Luminaires and their poles have been selected to compliment the botanical and organic themes of the design.

The Pedestrian area (Category P) lighting standard assigns illumination levels based on three selection

criteria: degree of pedestrian and vehicle night time activity, risk of crime and the requirement to enhance aesthetic appeal. Each selection criteria is classified as high, medium and low risk. The purpose of this standard is to primarily assist pedestrians to safely navigate their surroundings and detect potential hazards, discourage crime and reduce obtrusive lighting effects. Lighting has purposefully been applied in the vertical plane to ensure faces are well lit and recognisable. From a psychological perspective this is important in order to reduce fear and create a feeling of safety in the precinct.

The scheme will utilise exclusively LED light sources to provide a low maintenance, low energy and cost effective lighting solution.

Project: Greville Street PrecinctClient: City of StonningtonArchitect: Rush Wright Associates

18.09.15

Introduction.

GR

ATT

AN

STR

EET

GREVILLE STREET

LANEWAY IS NOT INSCOPE OF WORKS.HOWEVER, PROPOSEDLIGHTING SCHEME WILLPROVIDE LIGHT FORTHIS SPACE.

Stage 1 and 2 P-Category Map.

P1Used for areas with a high risk of crime. Average H Illuminance: 7 LuxMinimum H Illuminance: 2 LuxMinimum V Illuminance: 2 Lux

P2Used for areas with high pedestrian/cycle activity and need to enhance prestige, and medium risk of crime.Average H Illuminance: 3.5 LuxMinimum H Illuminance: 0.7 LuxMinimum V Illuminance: 0.7 Lux

P6Used for areas with general pedestrian movement with high risk of crime and need to enhance prestige.Average H Illuminance: 21 LuxMinimum H Illuminance: 7 LuxMinimum V Illuminance: 7 Lux

P9Used for steps and stairways, ramps and pedestrian ways. Requirements are the same as for the highest lighting sub-category applying to areas that abut the connecting element.

V3Used for mixed vehicle and pedestrian traffic, moderate to high vehicle volume, high pedestrian volume, moderate to low vehicle speeds, stationary vehicles alongside carriageway, through and local traffic and moderate traffic generation from abutting properties.Average Carriageway Illuminance: 0.75 LuxOverall Uniformity: 0.33

ABOVE: GREVILLE STREET AND GRATTAN STREET INTERSECTION (STAGE 1, 2A AND 2B)

Greville Street Precinct ProjectWGE Specialist Lighting have been engaged to provide a lighting scheme for the Greville Street Precinct project.

The scheme is split up into seven different stages outlined below:

• Stage 1 - Grattan Gardens• Stage 2A - Izett Street Intersection• Stage 2B - Greville Street West• Stage 3A - Greville Street East• Stage 3B - Prahran Town Hall Forecourt• Stage 4 - King Street• Stage 5 - Porter Street

This concept report outlines the external lighting schemes for stages 1, 2A and 2B, and initial concepts for the remaining stages.

Our overarching design philosophy recognises the precinct’s bohemian character, botanical themes and the need to create a safe space with a robust installation that is beautiful and engaging for the public at all hours.

New LED street lighting will be provided to Greville Street on the south side to provide functional illumination over the street and footpaths to accommodate the transition to underground power. Luminaires and their poles have been selected to compliment the botanical and organic themes of the design.

The Pedestrian area (Category P) lighting standard assigns illumination levels based on three selection

criteria: degree of pedestrian and vehicle night time activity, risk of crime and the requirement to enhance aesthetic appeal. Each selection criteria is classified as high, medium and low risk. The purpose of this standard is to primarily assist pedestrians to safely navigate their surroundings and detect potential hazards, discourage crime and reduce obtrusive lighting effects. Lighting has purposefully been applied in the vertical plane to ensure faces are well lit and recognisable. From a psychological perspective this is important in order to reduce fear and create a feeling of safety in the precinct.

The scheme will utilise exclusively LED light sources to provide a low maintenance, low energy and cost effective lighting solution.

Project: Greville Street PrecinctClient: City of StonningtonArchitect: Rush Wright Associates

18.09.15

Introduction.

GR

ATT

AN

STR

EET

GREVILLE STREET

LANEWAY IS NOT INSCOPE OF WORKS.HOWEVER, PROPOSEDLIGHTING SCHEME WILLPROVIDE LIGHT FORTHIS SPACE.

Stage 1 and 2 P-Category Map.

P1Used for areas with a high risk of crime. Average H Illuminance: 7 LuxMinimum H Illuminance: 2 LuxMinimum V Illuminance: 2 Lux

P2Used for areas with high pedestrian/cycle activity and need to enhance prestige, and medium risk of crime.Average H Illuminance: 3.5 LuxMinimum H Illuminance: 0.7 LuxMinimum V Illuminance: 0.7 Lux

P6Used for areas with general pedestrian movement with high risk of crime and need to enhance prestige.Average H Illuminance: 21 LuxMinimum H Illuminance: 7 LuxMinimum V Illuminance: 7 Lux

P9Used for steps and stairways, ramps and pedestrian ways. Requirements are the same as for the highest lighting sub-category applying to areas that abut the connecting element.

V3Used for mixed vehicle and pedestrian traffic, moderate to high vehicle volume, high pedestrian volume, moderate to low vehicle speeds, stationary vehicles alongside carriageway, through and local traffic and moderate traffic generation from abutting properties.Average Carriageway Illuminance: 0.75 LuxOverall Uniformity: 0.33

ABOVE: GREVILLE STREET AND GRATTAN STREET INTERSECTION (STAGE 1, 2A AND 2B)

GR

ATT

AN

STR

EET

GREVILLE STREET

Stage 1

Grattan Gardens

KEY PLAN

G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

G

GGGGGGGGGGGG

GGGGGGGGGGGG

GGGGGGGGGGGG

TTTTTTTTTTTTTTTTTTTT

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

D

D

D

DD

DD

DD D D D

DD

DDD

D

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

W

WW

WW

WW

W

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WWWW

W W W W W WW

W

W

W

W W W W

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

S

SSSSSSSSSSS

S S S S S

SSSSSSSSSSSSSS

SS

SS

SSSSS

SS

SS

S

DD

D

DDDDD

D

D

S

S

SSSSSSSSSS

AT-

AT 1:250

@ A

1

A1 A30

55

101:2

501:5

00

NOTE

:LO

CATI

ON O

F EX

ISTI

NG S

ERVI

CES

ISDI

AGRA

MMAT

IC O

NLY

AND

TO B

ECO

NFIR

MED

ON S

ITE

PRIO

R TO

STA

RTOF

ANY

CON

STRU

CTIO

N W

ORKS

I_SK

_001

ELEC

TRIC

ALLA

YOUT

SHEE

T 1

BA

18/09

/2015

4:32

:09 P

M28

597-

MEL-

1_SK

_001

.dwg

PREL

IMIN

ARY

18/09

/15

DA

CON

STRU

CTIO

N :

APPR

OVE

D FO

RSC

ALE

:

DRAW

N :

FOR

TEN

DER

:AP

PRO

VED

VERI

FIED

:DE

SIG

NED

:

TITL

E:PR

OJE

CT:

DRAW

ING

No.

PRO

JECT

No.

REVI

SIO

N

A1 D

RAW

ING

- BU

ILDI

NG

SER

VICE

S G

ROU

P

ARCH

ITEC

T/CL

IEN

T:

APP'

DDR

AWN

REV.

DESC

RIPT

ION

DATE

2859

7-M

EL-

WO

OD

& G

RIEV

E EN

GIN

EERS

PERT

HM

ELB

OU

RN

ESY

DNEY

BRIS

BAN

EAL

BAN

YBU

SSEL

TON

DARW

INSH

ENZH

EN

GR

EVIL

LE S

TREE

TPR

ECIN

CT

PRO

JEC

T

STO

NN

ING

TON

CO

UN

CIL

AT-

BPR

ELIM

INAR

Y18

/09/15

Lighting LayoutGrattan Gardens (Stage 1).

ADJUSTABLE POLE MOUNTED FLOOD-LIGHTS

HANDRAIL LIGHTS

GR

ATT

AN

STR

EET

GREVILLE STREET

Stage 1

Grattan Gardens

KEY PLAN

G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

G

GGGGGGGGGGGG

GGGGGGGGGGGG

GGGGGGGGGGGG

TTTTTTTTTTTTTTTTTTTT

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

DD

D

D

D

DD

DD

DD D D D

DD

DDD

D

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

W

WW

WW

WW

W

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WWWW

W W W W W WW

W

W

W

W W W W

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

S

SSSSSSSSSSS

S S S S S

SSSSSSSSSSSSSS

SS

SS

SSSSSS

SS

SS

DD

D

DDDDD

D

D

S

S

SSSSSSSSSS

AT-

AT 1:250

@ A

1

A1 A30

55

101:2

501:5

00

NOTE

:LO

CATI

ON O

F EX

ISTI

NG S

ERVI

CES

ISDI

AGRA

MMAT

IC O

NLY

AND

TO B

ECO

NFIR

MED

ON S

ITE

PRIO

R TO

STA

RTOF

ANY

CON

STRU

CTIO

N W

ORKS

I_SK

_001

ELEC

TRIC

ALLA

YOUT

SHEE

T 1

BA

18/09

/2015

4:32

:09 P

M28

597-

MEL-

1_SK

_001

.dwg

PREL

IMIN

ARY

18/09

/15

DA

CON

STRU

CTIO

N :

APPR

OVE

D FO

RSC

ALE

:

DRAW

N :

FOR

TEN

DER

:AP

PRO

VED

VERI

FIED

:DE

SIG

NED

:

TITL

E:PR

OJE

CT:

DRAW

ING

No.

PRO

JECT

No.

REVI

SIO

N

A1 D

RAW

ING

- BU

ILDI

NG

SER

VICE

S G

ROU

P

ARCH

ITEC

T/CL

IEN

T:

APP'

DDR

AWN

REV.

DESC

RIPT

ION

DATE

2859

7-M

EL-

WO

OD

& G

RIEV

E EN

GIN

EERS

PERT

HM

ELB

OU

RN

ESY

DNEY

BRIS

BAN

EAL

BAN

YBU

SSEL

TON

DARW

INSH

ENZH

EN

GR

EVIL

LE S

TREE

TPR

ECIN

CT

PRO

JEC

T

STO

NN

ING

TON

CO

UN

CIL

AT-

BPR

ELIM

INAR

Y18

/09/15

Lighting LayoutGrattan Gardens (Stage 1).

ADJUSTABLE POLE MOUNTED FLOOD-LIGHTS

HANDRAIL LIGHTS

Pole mounted pathway lights are positioned around the outer edges of the Grattan Gardens casting light towards along the garden path, minimising spill light to the surrounds. Potential exists for outrigger points to be added onto the pole to accommodate temporary additional lighting or decorations for special occasions. The Unique form complements the botanical themes in the hardscape garden and the overarching design.

Key Plan: Grattan Gardens Precicnt

GR

ATT

AN

STR

EET

GREVILLE STREET

Proposed Luminaire (Olivio Medio) Section Detail

SECTIONAL DETAIL: Pathway Lighting

SELUX OLIVIO - MEDIO PATHWAY LIGHTING MOUNTED ON SISTEMA POLE AT 5M HEIGHT.

Grattan Gardens Pathway Lighting

LED pods are concealed within the handrails to discretely provide functional illumination onto the stair treads without harsh glare and minimal spill light.

Key Plan: Grattan Gardens Precicnt

GR

ATT

AN

STR

EET

GREVILLE STREET

Proposed Luminaire: HLS Standard Beam Curved Face Section Detail

SECTIONAL DETAIL: Handrail Lighting

HANDRAIL LED POD CONCEALED WITHIN HANDRAIL. Handrail LED Pod

Handrail Lighting

Pole mounted pathway lights are positioned around the outer edges of the Grattan Gardens casting light towards along the garden path, minimising spill light to the surrounds. Potential exists for outrigger points to be added onto the pole to accommodate temporary additional lighting or decorations for special occasions. The Unique form complements the botanical themes in the hardscape garden and the overarching design.

Key Plan: Grattan Gardens Precicnt

GR

ATT

AN

STR

EET

GREVILLE STREET

Proposed Luminaire (Olivio Medio) Section Detail

SECTIONAL DETAIL: Pathway Lighting

SELUX OLIVIO - MEDIO PATHWAY LIGHTING MOUNTED ON SISTEMA POLE AT 5M HEIGHT.

Grattan Gardens Pathway Lighting

LED pods are concealed within the handrails to discretely provide functional illumination onto the stair treads without harsh glare and minimal spill light.

Key Plan: Grattan Gardens Precicnt

GR

ATT

AN

STR

EET

GREVILLE STREET

Proposed Luminaire: HLS Standard Beam Curved Face Section Detail

SECTIONAL DETAIL: Handrail Lighting

HANDRAIL LED POD CONCEALED WITHIN HANDRAIL. Handrail LED Pod

Handrail Lighting

Stage2A and 2B

Greville Street West and

Izett Street Intersection

Lighting LayoutGreville Street (2A & 2B).

STREETLIGHTING WITH REAR BRACKET AND PATHWAY LIGHT

G

G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D

D

D

DD

DD

DD

DD

D

DD

DD

D

D

WW

W W W W W W W W W W W W W W W W W W W W W W W W W W W

WW W W W W W

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W

WW

WW

WW

WW

WW

WW

WW

WW

W

W

WW

WW

S S S S S S S S S S S S S S S S S S S S S

SS

SS

SS

SS

SS

S

SS

SS

S

SS

SS

SS

SS

SS

SS

SS

S S S S

SS

SS

S

S S S S S

D D D

DD

DD

D

D

D

S

S

SS

SS

SS

SS

SS

AT -

AT

1:250 @ A1

A1A3

05 5 101:2501:500

NOTE:LOCATION OF EXISTING SERVICES ISDIAGRAMMATIC ONLY AND TO BECONFIRMED ON SITE PRIOR TO STARTOF ANY CONSTRUCTION WORKS

I_SK_001

ELECTRICALLAYOUTSHEET 1

BA

18/09/2015 4:32:09 PM28597-MEL-1_SK_001.dwg

PRELIMINARY 18/09/15

DA

CONSTRUCTION :APPROVED FORSCALE :

DRAWN : FOR TENDER :APPROVED

VERIFIED :DESIGNED :

TITLE:PROJECT:

DRAWING No.PROJECT No. REVISION

A1 DRAWING - BUILDING SERVICES GROUP

ARCHITECT/CLIENT:

APP'DDRAWNREV. DESCRIPTION DATE 28597-MEL-WOOD & GRIEVE ENGINEERS

PERTHMELBOURNE

SYDNEYBRISBANE

ALBANYBUSSELTON

DARWINSHENZHEN

GREVILLE STREETPRECINCTPROJECT

STONNINGTONCOUNCIL

AT -B PRELIMINARY 18/09/15

GR

ATT

AN

STR

EET

GREVILLE STREET

KEY PLAN

Stage2A and 2B

Greville Street West and

Izett Street Intersection

Lighting LayoutGreville Street (2A & 2B).

STREETLIGHTING WITH REAR BRACKET AND PATHWAY LIGHT

G

G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D

D

D

DD

DD

DD

DD

D

DD

DD

D

D

WW

W W W W W W W W W W W W W W W W W W W W W W W W W W W

WW W W W W W

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W

WW

WW

WW

WW

WW

WW

WW

WW

W

W

WW

WW

S S S S S S S S S S S S S S S S S S S S S

SS

SS

SS

SS

SS

S

SS

SS

S

SS

SS

SS

SS

SS

SS

SS

S S S S

SS

SS

S

S S S S S

D D D

DD

DD

D

D

D

S

S

SS

SS

SS

SS

SS

AT -

AT

1:250 @ A1

A1A3

05 5 101:2501:500

NOTE:LOCATION OF EXISTING SERVICES ISDIAGRAMMATIC ONLY AND TO BECONFIRMED ON SITE PRIOR TO STARTOF ANY CONSTRUCTION WORKS

I_SK_001

ELECTRICALLAYOUTSHEET 1

BA

18/09/2015 4:32:09 PM28597-MEL-1_SK_001.dwg

PRELIMINARY 18/09/15

DA

CONSTRUCTION :APPROVED FORSCALE :

DRAWN : FOR TENDER :APPROVED

VERIFIED :DESIGNED :

TITLE:PROJECT:

DRAWING No.PROJECT No. REVISION

A1 DRAWING - BUILDING SERVICES GROUP

ARCHITECT/CLIENT:

APP'DDRAWNREV. DESCRIPTION DATE 28597-MEL-WOOD & GRIEVE ENGINEERS

PERTHMELBOURNE

SYDNEYBRISBANE

ALBANYBUSSELTON

DARWINSHENZHEN

GREVILLE STREETPRECINCTPROJECT

STONNINGTONCOUNCIL

AT -B PRELIMINARY 18/09/15

GR

ATT

AN

STR

EET

GREVILLE STREET

KEY PLAN

Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic complements the language of the streetscape as a whole.

Key Plan: Greville Street West

GR

ATT

AN

STR

EET

GREVILLE STREET

Proposed Luminaire (Schreder Hestia) Section Detail

SECTIONAL DETAIL: Greville Street Lighting

Greville Street Pathway & Road Lighting

EAST LONDON ESPLANADE

Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic complements the language of the streetscape as a whole.

Key Plan: Greville Street West

GR

ATT

AN

STR

EET

GREVILLE STREET

Proposed Luminaire (Schreder Hestia) Section Detail

SECTIONAL DETAIL: Greville Street Lighting

Greville Street Pathway & Road Lighting

EAST LONDON ESPLANADE

Stage3A

Greville StreetEast

Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic will complement the language of the streetscape as a whole.

Flexible weatherproof LED strips will gently wash new library blade wall, highlighting entry and providing visual interest. Potential exists for handrail lighting to be provided for the ramp entries.

Key Plan: Greville Street East Proposed Luminaire (Schreder Hestia / Xlux Whiteline Neon 15) Section Detail

SECTIONAL DETAIL:PRAHRAN LIBRARY BLADE WALL

SL4

SL4

FLEXIBLE LED STRIP SURFACE MOUNTED TO UNDERSIDE OF ARCHITECTURAL LIP OR CAP OF BALUSTRADE TO WASH LIGHT DOWN BLADE WALL

BLADE WALL SECTION DETAIL

11.5mm

21mm

FLEXIBLE LED STRIP CONCEALED BEHIND ARCHITECTURAL LIP OR CAP ALONG TOP OF BLADE WALL

Greville Street Pathway & Road Lighting

KEY PLAN

Stage3A

Greville StreetEast

Street lighting and pathway lighting is provided from custom-fabricated curved poles, including shape and colour, and located between each tree island along the carriageway providing functional illumination for safe movement and security. The fitting’s aesthetic will complement the language of the streetscape as a whole.

Flexible weatherproof LED strips will gently wash new library blade wall, highlighting entry and providing visual interest. Potential exists for handrail lighting to be provided for the ramp entries.

Key Plan: Greville Street East Proposed Luminaire (Schreder Hestia / Xlux Whiteline Neon 15) Section Detail

SECTIONAL DETAIL:PRAHRAN LIBRARY BLADE WALL

SL4

SL4

FLEXIBLE LED STRIP SURFACE MOUNTED TO UNDERSIDE OF ARCHITECTURAL LIP OR CAP OF BALUSTRADE TO WASH LIGHT DOWN BLADE WALL

BLADE WALL SECTION DETAIL

11.5mm

21mm

FLEXIBLE LED STRIP CONCEALED BEHIND ARCHITECTURAL LIP OR CAP ALONG TOP OF BLADE WALL

Greville Street Pathway & Road Lighting

KEY PLAN

Stage3B

Prahran Town Hall Forecourt

KEY PLAN

Lighting LayoutPrahran Town Hall Forecourt (Stage 3B).

INTEGRATED SEAT LIGHTING WITH FLEXIBLE LED STRIP

INGROUND RECESSED SEGMENTED LED STRIP

BOLT OR CONCRETE SECURED UPLIGHT

Stage3B

Prahran Town Hall Forecourt

KEY PLAN

Lighting LayoutPrahran Town Hall Forecourt (Stage 3B).

INTEGRATED SEAT LIGHTING WITH FLEXIBLE LED STRIP

INGROUND RECESSED SEGMENTED LED STRIP

BOLT OR CONCRETE SECURED UPLIGHT

Flexible LED strips are integrated into the curving aluminium seats that follow the shape of the planter boxes, casting a curved line of light that follows the architecture as well as accentuating the hidden lettering arranged throughout the space. Low wattage uplights will be provided to planters, casting a gentle glow to the existing foliage. These uplighters will be bolted to the planters to avoid vandalism and theft. Segmented colour changing LED strip lighting will provide inground luminescence to the architectural lettering in the ground.

Key Plan: Prahran Town Hall Forecourt Proposed Luminaires (Xlux Whiteline Neon 15 / Hunza Euro Spot / Filix Snake)

Section Detail

SECTIONAL DETAIL:OUTDOOR SEATING

SL4

SL4SL4

FLEXIBLE LED STRIP RECESSED INTO CUTOUT OF ALUMINIUM SEATING.

FLEXIBLE LED STRIPS ARE RECESSED INTO ALUMINIUM SEATING.

SEATING LIP DETAIL

FRONT VIEW OF OUTDOOR SEATING

SIDE VIEW OF OUTDOOR SEATING

11.5mm

21mm

Prahran Town Hall Forecourt

FINSBURY AVENUE SQUARE

Flexible LED strips are integrated into the curving aluminium seats that follow the shape of the planter boxes, casting a curved line of light that follows the architecture as well as accentuating the hidden lettering arranged throughout the space. Low wattage uplights will be provided to planters, casting a gentle glow to the existing foliage. These uplighters will be bolted to the planters to avoid vandalism and theft. Segmented colour changing LED strip lighting will provide inground luminescence to the architectural lettering in the ground.

Key Plan: Prahran Town Hall Forecourt Proposed Luminaires (Xlux Whiteline Neon 15 / Hunza Euro Spot / Filix Snake)

Section Detail

SECTIONAL DETAIL:OUTDOOR SEATING

SL4

SL4SL4

FLEXIBLE LED STRIP RECESSED INTO CUTOUT OF ALUMINIUM SEATING.

FLEXIBLE LED STRIPS ARE RECESSED INTO ALUMINIUM SEATING.

SEATING LIP DETAIL

FRONT VIEW OF OUTDOOR SEATING

SIDE VIEW OF OUTDOOR SEATING

11.5mm

21mm

Prahran Town Hall Forecourt

FINSBURY AVENUE SQUARE

Stage4

King Street

Pole mounted spotlights will provide pools of light, allowing for functional illumination as well as a sense of drama. Gobo projectors with colour filters will be mounted onto these poles to provide lighting effects for special events and public holiday specialty decorative lighting. Potential exists for customised gobos to tie in the bohemian and botanical themes of the area. Public seating will be provided with flexible LED strip lighting for a “floating” effect. Glare control will be provided for all lighting to prevent spill light and intrusion into adjacent private spaces.

Key Plan: King Street Proposed Luminaires (Xlux Whiteline Neon 15 / We-ef FLC254 CC-BL Goobo Projector / Selux Olivio)

Section Detail

SECTIONAL DETAIL:OUTDOOR SEATING

SL4

SL4

SL4SL4

A SERIES OF FLEXIBLE, WEATHERPROOF LED STRIPS ARE CONCEALED BEHIND AN ARCHITECTURAL LIP.

BUILT-IN ARCHITECTURAL LIP TO CONCEAL LOW WATTAGE LED STRIP.

SEATING LIP DETAIL

FRONT VIEW OF OUTDOOR SEATING

SIDE VIEW OF OUTDOOR SEATING

11.5mm

21mm

King Street

KEY PLAN

Stage4

King Street

Pole mounted spotlights will provide pools of light, allowing for functional illumination as well as a sense of drama. Gobo projectors with colour filters will be mounted onto these poles to provide lighting effects for special events and public holiday specialty decorative lighting. Potential exists for customised gobos to tie in the bohemian and botanical themes of the area. Public seating will be provided with flexible LED strip lighting for a “floating” effect. Glare control will be provided for all lighting to prevent spill light and intrusion into adjacent private spaces.

Key Plan: King Street Proposed Luminaires (Xlux Whiteline Neon 15 / We-ef FLC254 CC-BL Goobo Projector / Selux Olivio)

Section Detail

SECTIONAL DETAIL:OUTDOOR SEATING

SL4

SL4

SL4SL4

A SERIES OF FLEXIBLE, WEATHERPROOF LED STRIPS ARE CONCEALED BEHIND AN ARCHITECTURAL LIP.

BUILT-IN ARCHITECTURAL LIP TO CONCEAL LOW WATTAGE LED STRIP.

SEATING LIP DETAIL

FRONT VIEW OF OUTDOOR SEATING

SIDE VIEW OF OUTDOOR SEATING

11.5mm

21mm

King Street

KEY PLAN

LuminaireSchedule

Project Greville Street Precinct Project

Ref 28597-MEL-I

Revision DRAFT

Date 19/10/2015

Type Number

Manufacturer Model Description Finish Dimensions Lamp Type Wattage (W) Optic Colour Temp Gear IP Rating Accessories Luminaire image Supplier Contact

SL1 Schreder Hestia Midi StreetlightPowder coated aluminium

324mm(W) x 165mm(H) x 927mm(L)

LED 75W Asymmetrical 4000K 66Custom Curved Pole Mount

Betacom

Betacom (1988) Limited

Contact: Phillip RaeM: +64 21 837 846E: [email protected]

SL2 Selux Olivio Medio Pathway LightPowder coated aluminium

220mm(Dia) x 260mm(H)

LED 41W Medium 4000K 67Custom Pole Mount Laser Lighting

Laser Lighting

Contact: Ken DrennanE: [email protected]: 0412 322 171

SL3 Planet LightingHSB Standard Beam Curved Face

Handrail LightPowder coated aluminium

15.9mm(Dia) x 15mm(H)

LED 1.5W 4200K 66 JSB Lighting

JSB Lighting

Contact: Matthew TaitM: 0459 431 601E: [email protected]

SL4 XluxWhiteline Neon 15

Underseating Strip Light

White11.5mm (W) x 21mm (H) x Various (L)

LED 9W/m 4000K 67 Light Project

Light Project

Contact: Tom CurtisM: 0423 612 343E: [email protected]

SL5 Filix SnakeInground Flexible Strip Light

White LED 17W/m RGB 67 Litesource

Litesource

Contact: Matt RoworthM: 0423 486 309E: [email protected]

SL6 Hunza Euro SpotSurface Mounted Spotlight

Stainless Steel

44mm (Dia) x 125mm (H)

LED 4W 38 degrees 4000K 66 Hunza

Hunza

Contact: Leanne ReardonM: 0420 855 514E: [email protected]

SL7 We-ef FLC254 CC-BL Gobo Projector Aluminium165mm (Dia) x 922mm (L)

HIT-CE 150W 4000K 66Colour filters, gobos Buckford

Buckford

Contact: Anthony StrangisM: 0427 111 708E: [email protected]

Specialist Lighting Luminaire Schedule

LuminaireSchedule

Project Greville Street Precinct Project

Ref 28597-MEL-I

Revision DRAFT

Date 19/10/2015

Type Number

Manufacturer Model Description Finish Dimensions Lamp Type Wattage (W) Optic Colour Temp Gear IP Rating Accessories Luminaire image Supplier Contact

SL1 Schreder Hestia Midi StreetlightPowder coated aluminium

324mm(W) x 165mm(H) x 927mm(L)

LED 75W Asymmetrical 4000K 66Custom Curved Pole Mount

Betacom

Betacom (1988) Limited

Contact: Phillip RaeM: +64 21 837 846E: [email protected]

SL2 Selux Olivio Medio Pathway LightPowder coated aluminium

220mm(Dia) x 260mm(H)

LED 41W Medium 4000K 67Custom Pole Mount Laser Lighting

Laser Lighting

Contact: Ken DrennanE: [email protected]: 0412 322 171

SL3 Planet LightingHSB Standard Beam Curved Face

Handrail LightPowder coated aluminium

15.9mm(Dia) x 15mm(H)

LED 1.5W 4200K 66 JSB Lighting

JSB Lighting

Contact: Matthew TaitM: 0459 431 601E: [email protected]

SL4 XluxWhiteline Neon 15

Underseating Strip Light

White11.5mm (W) x 21mm (H) x Various (L)

LED 9W/m 4000K 67 Light Project

Light Project

Contact: Tom CurtisM: 0423 612 343E: [email protected]

SL5 Filix SnakeInground Flexible Strip Light

White LED 17W/m RGB 67 Litesource

Litesource

Contact: Matt RoworthM: 0423 486 309E: [email protected]

SL6 Hunza Euro SpotSurface Mounted Spotlight

Stainless Steel

44mm (Dia) x 125mm (H)

LED 4W 38 degrees 4000K 66 Hunza

Hunza

Contact: Leanne ReardonM: 0420 855 514E: [email protected]

SL7 We-ef FLC254 CC-BL Gobo Projector Aluminium165mm (Dia) x 922mm (L)

HIT-CE 150W 4000K 66Colour filters, gobos Buckford

Buckford

Contact: Anthony StrangisM: 0427 111 708E: [email protected]

Specialist Lighting Luminaire Schedule

88Prepared for the City of Stonningtonby rush\wright associates

9.2 SITE WIDE LIGHTING CONCEPTS

89

landscape plansdesign development stage10

INSERT DD DRAWINGS

90Prepared for the City of Stonningtonby rush\wright associates

9.2 SITE WIDE LIGHTING CONCEPTS

INSERT DD DRAWINGS

91

services design civilhydraulic electrical

11

INSERT WGE REPORT & DRAWINGS

92Prepared for the City of Stonningtonby rush\wright associates

9.2 SITE WIDE LIGHTING CONCEPTS

INSERT WGE REPORT & DRAWINGS

93

traffic design 12

INSERT OBRIEN REPORT

94Prepared for the City of Stonningtonby rush\wright associates

9.2 SITE WIDE LIGHTING CONCEPTS