1
BALLINGER PARK MASTER PLAN 07.14.2015 new restroom rain gardens recongured parking lot play area with splash pad seating area existing elds native plants orchard informal seating rocks discoveries meadow swings gravel path play area hardened lake edge shing dock sculptural walls paved path paved terrace mown path golf archeology: tee and green clearings habitat snags downed logs bark mulch path boardwalk existing weir gravel path future viewing platform beach with seat steps boating dock new restroom with showers erosion-preventing natural edge picnic shelter exploration bands community garden garden shed north connection to existing crosswalks entry ‘spring’ and runnel feeding rain garden wetland wetland meadow climax forest open water lawn

Ballinger Park Plan Scheme Board

Embed Size (px)

Citation preview

BALLINGER PARK MASTER PLAN 07.14.2015

new restroom

rain gardens

reconfi gured parking lot

play area with splash pad

seating area

existing fi elds

native plants orchard

informal seating rocks

discoveries

meadow swingsgravel path

play area

hardened lake edge

fi shing dock

sculptural walls

paved path

paved terrace

mown path

golf archeology: tee and green

clearings

habitat snags

downed logs

bark mulch path

boardwalkexisting weirgravel path

future viewing platform

beach with seat steps

boating dock

new restroom with showers

erosion-preventing natural edge

picnic shelter

exploration bands

community gardengarden shed

north connection to existing crosswalks

entry ‘spring’ and runnel feeding rain garden

wetland

wetlandmeadowclimax forest

open water lawn